Workplace (Norcal) Qualifications
Confidential E-Commerce Client
Sunnyvale, CA
TYPE: SIZE:
Tenant Improvement, High-Rise 224,490 GSF
AlfaTech provided MEP design services for the world’s largest e - commerce company’s Moffett Towers location. The tenant improvement project encompassed the entire 8 stories of an existing building. The project scope included upgrades to the 1st floor café, open area workstations, private offices, breakout areas, kitchenettes, and conference rooms. The project also included a primary IDF room on one floor, one IDF room on each remaining floor, and one full floor of R&D labs. In addition, AlfaTech has also provided commissioning support, complete building low voltage systems evaluation and central plant support for MEP required modifications and upgrades.
ADDITIONAL PROJECTS • SJC32, Lab 121
• SJC26, BSL2 UV Lab • SJC26, Modular Lab • SJC26, Temp Lab • SJC26, Kitchen & Meeting Room • SJC26, Permanent Lab • SJC11, Paint Booth Installation • SFO46, BSL2 Lab • SFO46, Generator Design • Lab 126, Sunnyvale
Made with FlippingBook - Share PDF online