AT Big Book _ Aviation (pps 20641)

P U B L I C | C I V I C | T R A N S P O R TAT I O N

SAN DIEGO INTERNATIONAL AIRPORT, TERMINAL 2 PARKING PLAZA*

San Diego, ca

Project Manager for a new multi-story parking plaza, including electrical and security system for the San Diego International Airport Terminal 2. It is going to have 3,000 parking stalls, 169 of which were provisioned for EV charging stations and 16 are equipped with EV charging stations. The project included a 1500 KVA SDG&E service and transformer station, emergency power diesel generators and power distribution system. A sustainable lighting system with LED fixtures and a state of the art lighting control system, including daylighting and occupancy sensors.

SAN DIEGO INTERNATIONAL AIRPORT, MEP- ICT ON CALL*

San Diego, CA

Provided oversight for a 5-year, $10M-$20M yearly, On-Call account with San Diego International Airport which resulted in many assignments; replacement of the Baggage Handling System (BHS) equipment at Terminal 2 East (T2E), study of the T2E BHS from curb to curb, study and replacement of the emergency generator system, study and upgrade of the 12KV power distribution system, and study of the entire airport ICT/Communication system and upgrades.

* Completed by AlfaTech principal during previous employment

Made with FlippingBook Online newsletter