EQUINIX LA 1 IBX FACILITY Los Angeles, CA, USA

SYMANTEC DATA CENTER Tucson, AZ, USA

Type: Data Center Size: 61,000 SF

Type: Office, Data Center Size: 40,000 SF Data Center / 120,000 SF Total

This $31 million project was completed in one phase and consists of approximately 51,000 SF of collocation space, and 10,000 SF of storage area. The colocation area contains a proposed 530 cabinets, and was designed with stand-alone mechanical and electrical systems with interconnections to the existing 6th floor collocation where necessary for reliability or where indicated in the initial single line and flow diagrams.

AlfaTech provided project management, architectural, MEP design, civil, and structural engineering services for the design of the a new data center in an existing shell. The project included 25,000 SF of data center rack space with 4MW of IT load, infrastructure for an additional 15,000 SF future data center space, 4MW of IT load, and a 46kV electrical substation on site. This included the main equipment and components of certain systems such as HVAC for support rooms and offices, building management systems, life safety and fire alarm systems. The project included an N+1 design concept with chilled water and air handling units providing cooling under a raised floor.

Made with FlippingBook - Online catalogs