AlfaTech Big Book: Advanced Technology

A D VA N C E D T E C H N O L O G Y

JDSU

LOCKHEED MARTIN - BLDG 158

SEAGATE TECHNOLOGY

Shenzhen, China

Materials and Thermal Sciences Palo Alto, CA

Bangkok, Thailand and Milpitas and San Jose, CA

Type: Office, Lab Size: 75,000 SF total

Type: Manufacturing, Assembly (Bangkok) + Class 10 -1,000 Clean Rooms (California) Size: Bangkok: Class 10 Clean Rooms (80,000 SF), 160,000 SF total; California: 200,000 SF All clean rooms in California were renovated to provide precise temperature and humidity controls. Renovation utilized existing mechanical equipment to provide heat recovery and conservation for the DX system. The firm also provides MEP design services in support of CSPM Lab Installations, Process Tool Renovations, and lab remodels. In Bangkok, AlfaTech provided engineering services for 40,000 SF of raised floor. The computer room was designed and constructed in four months to meet client’s schedule.

Type: R&D Laboratory

AlfaTech provided project management, architectural, mechanical and electrical engineering schematic design of three floors of JDSU’s office lab facility in Shenzhen, China. This facility included office, cubicle, conference rooms, electronic labs and other shared space. The project also included approximately 10,000 square foot electronics labs on two of the subject floors. The design for this project included the development of Architectural fit-spaces and layouts as well as Engineering Schematic Design (SD).

AlfaTech provided mechanical, electrical, and plumbing engineering design services for a complete design package suitable for bid purposes for a new Laboratory R&D building on the LMSSC Palo Alto Campus. The required design integrated technical processes, scientific research, and personnel into a high tech environment with appropriate architectural form and recognition of the importance of value. The design efforts included requirements gathering, programming, schematic design, design development and the production of all required construction documents. The building site is located in the current location of Lockheed’s Advanced Technology Center (ATC) Building 201.

JDSU San Jose, CA

LOCKHEED MARTIN - BLDG 158 AEHF Lab Sunnyvale, CA

FUJITSU (former ly AMDAHL ) Sunnyvale, CA

Type: Clean Room Size: 80,000 SF

AlfaTech was the prime design consultant on this project, which consisted of an 80,000 SF Class 100 clean room and 150,000 SF of future expansion space. AT provided MEP support for all of JDSU’s manufacturing facilities. Projects entailed tool hook up and all associated mechanical, electrical, and process support systems including toxic and pyrophoric gases and chemicals.

Type: Class 100 Clean Room Size: Over 20,000 SF Projects: Buildings M4, 21 and 07 (Santa Clara) Buildings 19, 22, 23, 25, M2 and M3 (Milpitas, San Jose, Santa Clara, Sunnyvale) The firm has been Amdahl’s prime design consultant since 1987. AlfaTech provided process/chemical, mechanical, electrical, structural, security, and voice/data at each of the company’s campuses. Two of these buildings were designed with primary power service that included multiple switchgears with an interlock system for maximum redundancy.

Type: Laboratory Size: 1,669 SF

AlfaTech provided mechanical and electrical engineering services for the remodel of the existing lab and its expansion space in building 158 at Lockheed Martin’s campus. The scope involved demolition of existing flooring, doors, ceiling grid systems, light fixtures and selective demolition of mechanical distribution to facilitate the installation of new computer lab equipment and furnishings. Also included in the scope of services were the installation of new access floor system and wall finishes, new mechanical air conditioning units and distribution, relocation and reinstallation of existing lighting, relocation and installation of suspended cable tray, and revision of electrical power distribution including the installation of a new uninterruptible power system.

JDSU BUI LDING 4 San Jose, CA

Type: Clean Room, Labs and Support Space

JDSU consolidated and relocated all Bassett Street Operations to the existing campus site located on Automation Drive (Buildings 4, 5, 6, and 7). AlfaTech provided design services for the relocation of the existing production clean room, burn-in room, non-clean test labs, and other support spaces.

Made with FlippingBook Ebook Creator