AlfaTech Big Book: Advanced Technology

A D VA N C E D T E C H N O L O G Y

NATIONAL SEMICONDUCTOR CORPORATION

DIMATIX

MONOL ITHIC MEMORIES INC.

Santa Clara, CA

Santa Clara, CA

Santa Clara and Sunnyvale, CA

Type: Office and Manufacturing Size: 315,000 SF

Type: Clean Room

Type: Submicron Manufacturing and Office Space Size: 100,000 SF

AlfaTech provided structural, mechanical, plumbing, fire protection, Project Management and electrical engineering services for this 3 phase expansion project.

The firm provided engineering design services for a 3-story office addition and manufacturing building and a million-gallon chilled water storage system on a site with three existing buildings on it. Three existing 500-ton chillers, normally shut down overnight, are used to charge the three aboveground storage tanks. Stored chilled water provides the total chilled water needs for the building during the day. The storage tanks also serve as a secondary source of fire sprinkler water.

The firm did two separate projects for Monolithic Memories: A 6,240 SF Class 100 clean room in Sunnyvale with direct digital controls; and a 35,000 SF Wafer Fab with 40,000 SF of office and support space.

LOGITECH Irvine, CA

HEWLETT-PACKARD COMPANY Palo Alto, CA

Type: Manufacturing Size: 1,000 SF

Type: Clean Room Size: 16,000 SF

SYMANTEC Springfield, OR

AlfaTech was chosen for a renovation of an existing manufacturing and assembly area. AlfaTech provided full Turnkey project solution including Architectural, Engineering and Project/Construction management services.

In Building 25 & 26, the firm provided mechanical, electrical, process piping and fire protection design for a new Class 10 E-beam room and an additional clean room. Building 26 also received a new E-beam room.

Type: Security Operations Center

AlfaTech provided turnkey services, including overall contract management for design and construction, for single point of contact responsibility, for this new Security Operations Center within the existing Symantec Springfield facility. The project involved the construction to modify existing spaces within the Symantec Springfield facility to accommodate the new SOC.