ALFATECH AlfaTech has built a reputation over 30+ years providing the most innovative and sustainable engineering solutions starting at the master planning phase and continuing through construction administration. Our clients include high tech clients, service firms, large organizations in various industries, local and multi-national companies, and many ongoing clients we’ve been serving for years. We provide intelligent and cutting edge design at every turn, beginning at the commencement of every project in order to provide maximum benefit to our clients through the entire process. Our engineering solutions are highly efficient and cost effective, and ensure clients the greatest possible return on investment. Overall, we strive to develop the most dynamic relationships, be attentive to the needs of our clients and partners, and be true team players. With this mindset, we’ve proudly built a stellar list of clients. RSBG COMPANIES AlfaTech is part of a network of experienced companies that provide relevant services across the globe. These firms possess the most innovative and brightest talent which ensures the most forward thinking solutions and services for all projects in all the markets we serve. These companies operate from numerous offices in Europe, the Middle East, Asia and Africa. Now with over 6,400 staff members worldwide and in over 30 countries we

can serve all of our clients’ needs. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Collectively, the expertise of AlfaTech and RSBG provides engineering solutions that augments the vision of our clients and enables the most groundbreaking workplaces that go beyond current trends, and enable all future-of-work strategies.

Uber, Mission Bay 1 & 2

L O C AT I O N S

US San Jose, California

San Francisco, California Los Angeles, California Ventura, California San Diego, California Monrovia, California Atlanta, Georgia Edison, New Jersey

EUROPE Vienna, Austria Le, Denmark Paris, France Berlin, Germany

MIDDLE EAST Doha, Qatar Madiant Zayad, UAE Abu Dhabi, UAE

Al Ain, UAE Dubai, UAE Baghdad, Iraq Amman, Jordan

Bochum, Germany Frankfurt, Germany Hamburg, Germany

Munich, Germany Rostock, Germany Stralsund, Germany Ribnitz-Damgarten, Germany Wiesbaden, Germany Cologne, Germany Athens, Greece Madrid,Spain Zurich, Switzerland

Jeddah, Saudi Arabia Riyadh, Saudi Arabia AFRICA Beau Bassin, Mauritis Cairo, Egypt Algeria Libya Sudan

Istanbul, Turkey Birmingham, UK Bishop’s Strotford, UK Croydon, UK Edinburgh, UK Exeter, UK Leamington Spa, UK Leeds, UK London, UK Luton, UK

ASIA Brahmanbaria, Bangladesh Dhaka, Bangladesh Dehradun, India Delhi, India Gandhingar, India Mumbai, India New Dehli, India

Pune, India Rajkot, India

Maidenhead, UK Manchester, UK Nottingham, UK Stockport, UK Sunderland, UK Wakefield, UK

Visakhapatnam,India Manilla, Philippines Singapore, Singapore Bangkok, Thailand

P R O F I L E

S E R V I C E S

MECHANICAL ENGINEERING DESIGN HVAC

ARCHITECTURAL LIGHTING DESIGN Lighting and Lighting Controls Lighting Calculations

COMMISSIONING | ENERGY SOLUTIONS Early Quantifiable Energy Study Incentives

Heating Systems Water and Gas Cooling Systems / Chilled Water Dehumidification Systems Contamination Sensitive Areas Industrial Hygiene Systems Low Tolerance Temp Control Title 24 Analysis and Design Heat Recovery Systems Central Utility Plants Air Handlers HVAC System Controls PLC Programming Fire Protection and Plumbing

Customized ROI Calculations Sustainable Lighting Design Energy Savings Analysis Custom Lighting Fixtures Custom Lighting Fixtures Design

Energy Star® Assessments Retro-commissioning (RCx) Monitoring Brand Continuous Commissioning (MBCCx) ASHRAE Level 1, 2 and 3 Energy Audits Measurement and Verification (M&V) of installed projects Energy Modeling Net Zero Energy Budgeting HVAC/Chilled Water Plant Optimization

TECHNOLOGY DESIGN Low Voltage Design Audio Visual Design

Security Systems Design Architectural Acoustics Wireless Design & Modeling Distributed Antenna Systems (DAS) Integrated Building Management Systems BMS Network Integration Telco Facilities and Services Voice Systems and Applications Relocation & Data Center Migration Services Strategic Planning and Analysis Project Management Management Consulting SUSTAINABILITY Sustainability Planning (Organizational and Infrastructural) LEED / Green Building Consulting Masterplanning Life Cycle Cost Assessment Occupant Wellness and Comfort

PROCESS Industrial Waste Collection Acid Neutralization Bio-Kill Waste System Process Waste Containment Ultra pure De-ionized Water Systems USP Water WFI Specialty Chemicals Chemical Storage

ELECTRICAL ENGINEERING DESIGN Power Systems

Emergency & Standby Power Lighting and Lighting Controls Security Systems 24 / 7 Power Systems (UPS) Power Monitoring Systems Toxic Gas Monitoring Graphic Control and Alarm Panels Grounding and Bonding

Lab and Special Gas Systems Ultra High Purity Gas Piping

Bulk & Specialty Gases Toxic Materials Handling Code Compliance Process Distribution Piping Process Cooling Water Medical Gas Medical Vacuum Waste Anesthetic Gas Disposal system (WAGD) Dental Vacuum System Dental Water System

Energy Management Energy Conservation Fire Alarm Systems Public Address Systems Plug Loads Control

Façade Engineering CFD / Wind Studies Wind Studies Thermal Stratification Studies Energy Concept Studies

S E R V I C E S

GREEN BUILDING

SUSTAINABILITY

LIFE

MECHANICAL ENGINEERING DESIGN

OF A BUILDING RETRO COMMISSIONING

ELECTRICAL ENGINEERING DESIGN

ARCHITECTURAL LIGHTING

TECHNOLOGY

COMMISSIONING / ENERGY SOLUTIONS

CONSTRUCT I ON

OCCUPANCY

END OF USE

DE S I GN

” ...Scientists dream about doing great things. Engineers do them.”

James Michener

SUSTAINABILITY 02

S U S T A I N A B I L I T Y

AlfaTech follows a holistic approach to meet project expectations in all dimensions. Providing sustainable design is an achievement if it is also functional. Increasing efficiency is realistic when it is applicable. Meeting the project budget is possible when the design is constructible. We take pride in our designs and ensure that the following principles are aligned in our approach to every project: • Implementing sustainable solutions • Environmental awareness and reducing carbon footprint • Creating a stress-free, comfortable and healthy environment • Optimizing building performance, reducing energy and water usage • Utilization of the latest smart building technology and occupant environmental control, including temperature control, lighting control, building envelope shading, acoustic and air quality by means of enhanced filtration system At AlfaTech, we have a multidisciplinary team of experts to assess and design projects with an integrated approach. Working along with owners, architects and other stakeholders, we examine every project with a comprehensive, systematic approach to meet the client’s sustainability, energy, water and environmental quality goals. AlfaTech goes beyond engineering – our suite of energy, water and sustainability assessment services creates projects that benefit the triple bottom line – people, planet and profit. We provide expert studies in all qualitative aspects of the built environment such as day lighting, thermal comfort, advanced lighting control design, and technology integration.

We examine every project with a comprehensive systematic approach to meet the client’s sustainability, energy, water and environmental quality goals.

S U S T A I N A B I L I T Y

ADVANCED SIMULATIONS We provide various advanced computer simulations to study wind patterns, thermal stratification and comfort issues in spaces, building façade studies and energy modeling to aid architects and owners make key decisions during the early stages of design.

• Façade Engineering • CFD/Wind Studies • Thermal Stratification Studies • Energy Concept Studies • Energy Modeling • Daylighting Modeling

S U S T A I N A B I L I T Y

CASE STUDY:

UBER MB 1 & 2 – LEED PLATINUM / WELL GOLD MI SS ION BAY HEADQUARTERS

San Franc i sco , CA

AlfaTech is currently involved in Uber’s innovative new San Francisco headquarters which is a new 420,000 square-foot, ground up office building in the Mission Bay district. We provided design/bid/build style Mechanical, Electrical, and Plumbing (MEP) engineering, lighting design, and Technology (low voltage, security, audio/visual) services, throughout the entire project. AlfaTech is part of the construction administration effort and served as the engineer-of-record for mechanical and electrical installations. We assisted the architectural design team with optimizing performance by assessing various utility, façade and wind studies. Life-cycle cost analysis, energy benchmarking, and computational fluid dynamics were critical tools to inform the design effort. The project is designed as an innovative, ultra-high performance building that focuses on an occupant-centric workplace and includes an elaborate IT infrastructure, a façade that responds to programmatic needs, an under floor air distribution system, a two-building atria system incorporating natural ventilation, and a central treatment system for collecting graywater and rainwater. The interactions between the occupants, the buildings, and the ambient, were at the heart of the architectural and engineering systems; targeting lower environmental metrics of 1,100,000 kWh in reduced energy use and 2,100,000 gallons in reduced water use.

• High-performance LED lighting with an occupancy driven network-based lighting control • Fuel cells redundantly powering building network operations • Solar domestic hot water system • PV-ready electrical system • Integrated building management system, including Smart Building Technology

• Significant reduction of building energy by means of combined hydronic chill beam and underfloor air system (UFAD) • Aggressive rainwater capture and retention. • Graywater reuse • Natural ventilation for main atrium social areas, creating a pleasant, open experience for employees and visitors. • Maximize use of day lighting to optimize workspace quality.

S U S T A I N A B I L I T Y

CASE STUDY:

LUCAS MUSEUM OF NARRATIVE ART Los Ange l es , CA

The Lucas Museum was conceived with the bold ambition to challenge the way our societies appreciate art museums. Inspired by its resolute mission, the engineering design blasted off with the vision to deliver a lasting, centenarian building in harmony with its site. The carbon zero design harnessed heat and cooling from the soil beneath the museum with over 700 vertical bores. This constituted the deepearth, pulsating aorta of the geothermal field. A second element of nature was introduced by way of a thermally active water pond, which increased the site’s innate cooling capacity. These features were modulated by the high-efficiency, heat recovery central plant that provided all-electric, simultaneous heating and cooling (and no gas-fired boilers). Environmental quality for prime spaces – galleries, state of the art theaters, and lobbies – were controlled with underfloor air-distribution and radiant floors. Smart controls gently nudged temperature and ventilation parameters to adjust to visitors’ comfort. The superstructure lifted off with an exterior façade that self-shaded the thermal shell, effectively reducing cooling demand. Curved onyxglass organically traced the rooftop which formed the solar PV field. At 365 kW capacity, the renewable energy source reduced an estimated 10-15% of the electricity demand and swung the carbon footprint negative. Ahead of its time, the Lucas Museum will open the doors as an eco-friendly, ‘net zero energy’-ready museum that gives back to the surrounding community.

• Geothermal loop • A solar energy system • Natural ventilation • Displacement system • LED lighting • Spectrally selective glazing

• Grass and native plants • Ecological ponds • EV charger • Rainwater harvesting • Energy efficient HVAC system • Hydronic bidirectional heating/cooling flooring systems

S U S T A I N A B I L I T Y

CASE STUDY:

DELTA PRODUCTS HEADQUARTERS Fremont , CA

Delta Products desired a new headquarters highlighting sustainability and energy efficiency with primary goals to showcase Delta Products’ innovation in a state of the art building blending the natural surroundings with sustainable building design. The Delta Americas Headquarters is a three-story 250,000 SF campus consisting of private offices, administrative, open workspace, conference/auditorium facilities, kitchen/dining areas, labs, office and warehouse. AlfaTech provided sustainable mechanical electrical plumbing engineering design services for this project focusing on the client’s desire to maximize natural ventilation and daylighting reduce water and energy consumption with a geothermal central plant and utilize radiant systems for primary space conditioning. AlfaTech conducted extensive CFD modeling to assist with sizing and locating windows around the building and their integration into a thermal tower ventilation strategy. The project also encompasses a photovoltaic system to balance energy consumption and achieve Net Zero Energy.

• Two passively conditioned, interconnected atria • Shaded facade with automated natural ventilation • Chilled sails and occupant- controlled underfloor air- distribution systems • High-performance LED lighting with an occupancy driven network-based lighting control

• Graywater reuse and rainwater catchment systems • Integrated building automation, controls and management platforms • Full air-side and water-side economizing • Fuel cells redundantly powering building network operations • Solar domestic hot water system • PV-ready electrical system

We believe making the world a better place is a responsibility we all share. And being able to do our part in the way we work is one of the best ways we can give back and have a positive effect on our environment. This means, not only do we always strive to provide the most sustainable solutions for our clients, but we are also always working on new, innovative and pioneering methods to bring sustainability to the next level, staying ahead of the curve in all types of projects in all the markets we serve.

Let’s leave the world a better place than we found it.

03 SMART BUILDING TECHNOLOGY

SMART BUILDING TECHNOLOGY AlfaTech Smart Building Services help building owners and stakeholders with office strategies as how to roll in more Artificial Intelligence (AI) machine learning and cloud-based data and analysis in facility operation to optimize various building systems and keep maintenance low. The Smart Building Technology will also be beneficial to post pandemic return to office. In order to implement the latest and greatest technology, the essential operational technologies, including a unified user interface and reporting system that monitors and structures all various systems (BMS, Lighting Control, Shade Control, Security, Access , Conference room scheduling, and others) data in place will be required. This will be accomplished through a web-based user interface integrated building management system known as ‘Smart Building Technology’.

S MA R T B U I L D I N G T E C H N O L O G Y

VALUE PROPOSITION

Employee Comfort • Better Utilization of Resources, increasing employee comfort while maintaining energy savings

Indoor Environmental Quality (IEQ) • Help to reduce carbon footprint • Improves health, productivity and well being of occupants

People Counting • Real-time occupancy counts for analysis

o Data can be used by space planners to improve workplace design. o Track usage of high-traffic areas and adjust half of travel if needed. o Direct cleaning crews to provide additional services where they are required. o Monitoring and reporting on social distancing compliance via alarms for local annunciation when occupants are to close to each other. Energy Savings • Saves energy by only heating/cooling/ventilating when needed o Reduce energy/expense running chillers, heaters and fans o Highest energy saving due to highly reliable sensing network o Highly reliable sensing network allows for accurate zone mapping to variable air volume (VAV) unit.

Ease of Implementation/Management • Leverage existing sensing network • Highly reliable

S MA R T B U I L D I N G T E C H N O L O G Y

• Integration through open protocols or (API) • Collective monitoring, reporting, analysis and automation INTEGRATED BUILDING MANAGEMENT SYSTEMS (IBMS)

• Optimizing operational and energy efficiencies • Improve strategic facilities and space planning • Enhance employee experience/productivity • Reliability with integrated systems approach • Consolidate facilities management platforms

S MA R T B U I L D I N G T E C H N O L O G Y

SMART BUILDING SERVICES • Participate and prepare for strategy meetings sessions with stakeholders in order to understand smart building expectations and requirements. • Develop a smart building system matrix outlining all systems that should be included in the Intelligent (SMART) Building System • Provide smart building design expertise to ensure that all required systems slated for integration will be connected to the building technology network (BTN) and communicating via an open protocol like BACnet IP. • Develop a Master Systems Integration (MSI) RFP outlining the system requirements and specifications for the provisioning of an open MSI System consisting of hardware and software components that will be either be on a dedicated on prem private network or hosted off prem in the cloud.

04 MARKETS & Relevant Projects

ADI, Santa Clara, CA

DATA CENTERS

D A T A C E N T E R S

FACEBOOK – LEED GOLD Fort Worth, TX

Type: Data Center Size: Confidential

AlfaTech provided site selection support services and continues to provide overall design team project management as well as MEP, Architectural, Structural, Civil, Fire Protection, Controls, Wind Study, LEED Consulting, and Life Safety services for this extremely energy efficient Data Center project. Key design changes to this data center include a redesign of the building arrangement from single data center facilities with support office to a single facility with an office space bridging the equivalent of 2 data center facilities in past projects. In addition to the layout revisions, another major revision to the Core IT spaces was made to address current needs as well as future proofing the space for anticipated technology changes. The MEP system design includes a highly energy efficient design concept divergent from past data center cooling techniques at other project sites. This project represents the fifth data center site (in addition to the Prineville site in Oregon, Forest City site in North Carolina, Lulea site in Sweden, and the Altoona site in Iowa) which were also under AlfaTech project management and design services). The Client achieved LEED Gold Certification for this building.

Awards: Chicago AIA "2020 Design Excellence Award" Distinguished Building

D A T A C E N T E R S

FACEBOOK – LEED GOLD Prineville, OR

Type: Data Center Size: Confidential

AlfaTech provided overall design team project management as well as site master planning, architectural, structural, civil, telecom and communications, paging systems, MEP, fire protection, controls, wind study, substation design, LEED consulting, and life safety services for this data center project. This mission critical data center has direct evaporative cooling and N+1 block redundant electrical topologies. This project involved the site master plan as well as design and construction of two main data center facilities on the site that include a single story with penthouse air handling equipment and outdoor standby diesel generators. The site also includes a cold storage data center facility managed and designed by AlfaTech to provide data storage services to meet the project goals to archive storage at reduced capital costs.

D A T A C E N T E R S

EQUINIX SV2 – LEED CERTIFIED Santa Clara, CA Type: Data Center Size: 60,000 SF AlfaTech provided full mechanical, electrical, plumbing, fire protection engineering, technology design services and overall design project management for tenant improvement to this existing operational collocation facility. This $41 million project includes two separate 22,000 SF build-outs with necessary utility infrastructure upgrades. Electrical design includes live conversion of 2N Data Center spaces to a 3+1 block redundant design and redistribution of existing loads. Mechanical design includes payback analysis for rooftop air handlers with air side economizer and central plant chiller upgrades to optimize system efficiency and reliability. AlfaTech acted as the LEED NC program coordinator and developed design and construction strategies to obtain it’s recently awarded LEED Certified Level status. The firm managed the entire application and appeals process without the use of a LEED consultant, including online documentation of sustainable measures implemented for certification. In order to meet the high data center demand in California’s Silicon Valley, Equinix targeted a rapid expansion/ conversion of their existing SV2 facility located in Santa Clara. AlfaTech led the design team and completed the MEP design for this fast-paced project. We were able to complete the project ahead of schedule, reduce the overall project costs, and incorporate sustainable construction practices. This project was awarded the 2008 Consulting-Specifying Engineer magazine’s Gold ARC Award for renovation and the Silicon Valley Power Energy Innovator Award in the “Energy Efficiency Partner” category at the Silicon Valley Leadership Group Energy Summit.

D A T A C E N T E R S

EQUINIX SV5 – LEED GOLD San Jose, CA

Type: Data Center Size: 170,000 SF data center with 40,000 SF support space

AlfaTech has provided full project management and MEPT design services for this greenfield data center project. The project includes 25MW of total power 18MW of critical power as well as parallel path designs for 5,000 ton chilled water plant utilizing pre-packaged modular chiller plant and full air side economizer air handling solution and an alternate, proprietary, refrigerant based cooling system. This project achieved LEED Gold status.

PUBLIC | CIVIC | TRANSPORTATION

P U B L I C | C I V I C | T R A N S P O R TAT I O N

LAX, SOUTHWEST AIRL INES TERMINAL 1

Los Angles, CA

Type: Aviation Size: 346,000 SF

The terminal’s entrance, ticket counters, and Skycap operations will be moved from the east end of the building to the west side to ease traffic congestion a problem motorists frequently encounter when entering the central terminal area at peak travel times. A reprogrammed departures and arrivals level will feature a “Lobby of the Future,” which includes self check-in and self-tag bag drop kiosks, a 12-lane security screening checkpoint, two large bag claim devices, and a high-speed in-line screening baggage handling system. Combined, these features will make departure and arrivals systems more balanced and efficient both curbside and within the terminal. Features Include: A “Lobby of the Future” with self check-in/self-tag bag drop kiosks, 12-lane security screening checkpoint, two large bag claim devices, and a high-speed baggage handling system An additional 25,000 square feet of retail and dining space Enhanced lighting and daylighting, better views to the terminal exterior, improved signage, and vertical transportation

Other Projects at LAX • Southwest Terminal 1 Remodel • Terminal 3 Remodel • Airport Recruitment & Training Center Assessment & Design • Airport Response Coordination Center • British Airways—Remodel of Cargo Reservation Center

• Concessions—Food Service Renovations • Design Criteria & Tenant Review—T4, 5, 7, 8 • Duty-Free Shops • MEP System Assessments—T1, 2, 3, 6, 7, 8 • Taxilane T Relocation • Tenant Design Criteria—T1, 2, 3, 6 • Tom Bradley International Terminal (TBIT) Temporary Lounge Electrical Service • Qantas Airways Offices & Training Room

P U B L I C | C I V I C | T R A N S P O R TAT I O N

LAX, TERMINALS 1 & 2 ASSESSMENTS

Los Angeles, CA

The firm performed an overall assessment of the current mechanical and plumbing systems within Terminals 1 and 2. The facility was evaluated for code compliance and condition of existing equipment. Written reports were prepared with recommendations to assist the airport with ongoing maintenance and upgrades. As part of the deliverables, the firm developed a database application populated with equipment data so the airport engineers could easily access, share and update information as needed.

LAX, TERMINALS 3 & 6 ASSESSMENTS

Los Angeles, CA

The firm’s role expanded when they were also commissioned to provide assessments of mechanical, electrical and plumbing systems’ integrity within Terminals 3 and 6. Deliverables included a written evaluation of the current state of the facilities and recommendations to bring them up-to-date. The database designed exclusively for LAX’s use for Terminals 1 & 2 was utilized, and additional information was also established in REVIT as a template for future work to be undertaken when budget would allow.

LAX, AIRPORT RECRUITMENT & TRAINING CENTER Assessment and Remodel When a burst water main damaged this two-story, 22,000 SF facility, the firm was hired to provide a professional review of the situation. The scope involved a field survey and analysis, followed by development of designs for repairing damage to the fire main serving the three hangar deluge systems. The project was coordinated with LAWA facility personnel and engineering staff, as well as the L.A. Fire Department. Los Angeles, CA

P U B L I C | C I V I C | T R A N S P O R TAT I O N

LAX, TAXI LANE T RELOCATION

The firm provided mechanical, electrical and plumbing engineering services for modifications to the taxilane that will serve the future Bradley West/Midfield Satellite Concourse apron/gate areas and north-south taxiing capabilities. The project entails the design of a 3,166-foot long by 100-foot wide taxilane, which connects two other active taxiways. The project also includes partial demolition of a former TWA Hangar, the demolition of LSG Sky Chef’s in-flight kitchen and the American Airlines Low Bay Hangar, modifications to a multiple facility deluge system, site restoration, construction of Remain Overnight Parking areas (RON) and other related work. Los Angeles, CA In a 2008 audit of airport operations and management, LAX was found deficient due to, among other things, the lack of a cohesive emergency operations center (EOC) that would enable them to coordinate with local, state and federal authorities. It was also found that the current airport police dispatch system did not meet current national standards. As part of the $5 billion modernization program, the firm designed a new 8,000 SF mission critical facility with 24/7 mechanical, electrical and plumbing systems capability. Los Angeles, CA LAX, AIRPORT RESPONSE COORDINATION CENTER LAX, TOM BRADLEY INTERNATIONAL TERMINAL The firm prepared an upgrade of the electrical system for a temporary lounge in the Tom Bradley International Terminal. By bringing the area into Title 24 compliance, establishing higher-tech functionality for T-1 line connectivity and upgrading lighting, the airport was able to expand from existing services without initiating the full remodel to the terminal that was pending. The firm also provided updated mechanical, electrical and plumbing drawings to as-built level. Los Angeles, CA

P U B L I C | C I V I C | T R A N S P O R TAT I O N

ONTARIO INTERNATIONAL AIRPORT (ONT)

As part of the new security upgrades performed on airports after 9/11, the firm was hired to design the mechanical, electrical and plumbing systems for the new baggage handling systems in Terminals 2 and 4. The scope included renovation of existing airline baggage handling spaces, new baggage handling screening rooms, replacement of the outbound baggage conveyor systems, and installation/integration of the Transportation Safety Administration (TSA) provided EDS machines (three in each terminal). Also included were Explosion Trace Detection (ETD) workstations, On-screen Resolution (OSR) control rooms, and Closed Circuit Television (CCTV) systems. Among the challenges of the project were utility relocations for service to the systems. Ontario, CA ONT, NORTH AND SOUTH SECURITY AIRFIELD ACCESS POINT FACI L ITIES Ontario, CA The project consisted of a new building with security gates for employee access to the airside and included screening systems, new diesel emergency generators, and self-contained fuel tanks. The firm provided mechanical, electrical and plumbing design services. ONT, TERMINALS 2 AND 4 FOOD CONCESSIONS AND RENOVATIONS Ontario, CA The firm performed mechanical, electrical and plumbing services, as well as fire alarm design for Terminals 2 and 4, for a number of concessions, including Authors/Daily News, California & Co., Express Bodicare, News Connection, and See’s Candies. Ontario Airport won a prestigious Airports Council International -- North America (ACI-NA) " Richard A. Griesbach Award of Excellence " in Airport Concessions category in 2001. The firm also worked extensively on renovations to the food concessions located in Terminals 2 and 4, including Coffee Bean & Tea Leaf, El Paseo Café and Cantina, Schlotzsky’s, T.G.I. Friday’s. Work included mechanical, electrical and plumbing design services.

CORPORATE CAMPUS

C O R P O R AT E C AMP U S

UBER | MISSION BAY 1 & 2 LEED PLATINUM, WELL GOLD San Francisco, CA

Type: New Site, Two High-Rise Office Buildings Size: 420,000 SF

AlfaTech is currently involved in Uber’s innovative new San Francisco headquarters which is a ground up office building in the Mission Bay district. AlfaTech provided design/bid/build style Mechanical, Electrical, and Plumbing (MEP) engineering, lighting design, and Technology (low voltage, security, audio/visual) services, throughout the entire project. AlfaTech is part of the construction administration effort and served as the engineer-of-record for mechanical and electrical installations. AlfaTech assisted the architectural design team with optimizing performance by assessing various utility, façade and wind studies. Life-cycle cost analysis, energy benchmarking, and computational fluid dynamics were critical tools to inform the design effort. The project is designed as an innovative, ultra-high performance building that focuses on an occupant-centric workplace and includes an elaborate IT infrastructure, a façade that responds to programmatic needs, an under floor air distribution system, a two-building atria system incorporating natural ventilation, and a central treatment system for collecting graywater and rainwater. The interactions between the occupants, the buildings, and the ambient, were at the heart of the architectural and engineering systems; targeting lower environmental metrics of 1,100,000 kWh in reduced energy use and 2,100,000 gallons in reduced water use. • Chilled sails and occupant-controlled underfloor air-distribution systems • High-performance LED lighting with an occupancy driven network-based lighting control • Graywater reuse and rainwater catchment systems • Integrated building automation, controls and management platforms • Full air-side and water-side economizing • Fuel cells redundantly powering building network operations • Urban garden • Solar domestic hot water system • PV-ready electrical system The buildings' eco-friendly features consisted of: • Two passively conditioned, interconnected atria • Shaded facade with automated natural ventilation

Awarded Savings by Design Incentive

C O R P O R AT E C AMP U S

UBER | MISSION BAY 3 & 4 LEED GOLD, WELL GOLD New Warriors Arena, San Francisco, CA

Type: New Site, Two High-Rise Office Buildings Size: 435,000 SF

AlfaTech provided comprehensive engineering and technology design for two new high-rise buildings for Uber’s new headquarters. AT provided design services for full design, MEP, Technology, and lighting system design for the tenant improvements. Scope included administrative office space, full kitchen/cafeteria, conference center and retail space.

C O R P O R AT E C AMP U S

L INKEDIN | 222 2ND STREET – LEED PLATINUM

San Francisco, CA

Type: High-Rise Office and mixed-use Size: 450,000 SF

As the world’s largest Internet professional networking site, LinkedIn has grown exponentially since its start in 2003. For the past several years, AlfaTech has provided services for many of their offices worldwide. This 26-story tenant improvement project, is located in the heart of San Francisco’s South of Market neighborhood at 222 Second Street. With this lease, LinkedIn brings together their R&D and sales teams, approximately 2,250 employees, under one roof. AlfaTech provided mechanical, electrical and plumbing engineering, Low Voltage, Audio Visual design and LEED fundamental and enhanced commissioning services services for this new ground-up project which includes extensive interior build-out of 20,000 sf of space dedicated to a contemporary kitchen, servery and seating as well as a state-of-the-art "All Hands" presentation room and complete Fitness Center, 2,209 sq. feet of ground retail, and two levels of subterranean parking.

222 Second St. is certified LEED Platinum.

C O R P O R AT E C AMP U S

CONFIDENTIAL CL IENT | AC

Confidential Location

Type: Campus Size: 752,000 SF

AlfaTech has provided full MEP design services for this confidential client. The project achieved LEED Platinum as per the City requirements for tenant improvements to all buildings. The project awarded design incentives provided by saving by design. This campus consists of: three interconnected, six-story office buildings with two levels of podium parking on the ground totaling 752,100 SF; 25,000 SF cold core and shell café building with full service commercial kitchen with variable flow system; six-story parking garage; open and collaborative environment with furniture systems; private offices; software/light-hardware labs in buildings 1 and 2 totaling 36,000 SF; server room with cooling redundancy; fitness center and wellness center, 10,000 SF each, in office tower 1 on level 3.

Awarded Savings by Design Incentive

C O R P O R AT E C AMP U S

CHARLES SCHWAB

Austin, TX

Type: Office Campus Size: 430,000+ SF

AlfaTech provided mechanical and electrical engineering, IT, security, and audiovisual design services for Phase 1 of this 430,000 campus. Building improvements included tenant improvements to a 6-story existing office building, approximately 188,000 GSF, one new 5-story office building, approximately 185,000 GSF, one new 5 level, two bay expansion of existing parking structure, and one new 2 plus partial story 65-67,000 SF amenity building, including a data center, full service café, training rooms, multipurpose room, and conference center.

C O R P O R AT E C AMP U S

SYMANTEC – LEED SI LVER

China

Type: Campus, Office, Labs, and Data Center Size: 1,000,000 SF+ (total for all three phases)

AlfaTech provided design services for this campus in China consisting of office, data center and manufacturing facilities.

The project involved a research and development campus of four buildings including three high-rise buildings and totaling into an occupied area of over 1 million SF. The facilities have conventional office spaces, server rooms, MDF rooms, and a cafeteria with full-service kitchen.

CHARLES SCHWAB – LEED GOLD

San Francisco, CA and Phoenix, AZ

Type: Campus, Data Center, Retail Size: 1,750,000 SF

Charles Schwab’s ongoing partnership with AlfaTech began in 2006. Projects totaling 1.75m SF have included campuses, tech and data center evaluations, TIs, feasibility studies, computer room upgrades and retail branches, at locations across the country. The new retail branch location achieved LEED Gold certification for its sustainable features such as PV as a renewable energy source, low-flow water fixtures, and low-VOC finishes.

CORPORATE OFFICE

C O R P O R AT E O F F I C E

ADOBE HEADQUARTERS

San Jose, CA

Type: Office Size: Three new buildings, 1,000,000 SF total

Building One: 18-story; 440,000 SF Building Two: 15-story, 275,000 SF Building Three: 18-story, 266,000 SF

Now considered a landmark on the San Jose skyline, the Adobe headquarters campus houses more than 2,000 employees. Each of the three buildings has its own parking garage, public lobby, data center, meeting rooms, and mail room. Shared facilities include an auditorium, full-service cafeteria and fitness center. Building Two also features retail space at street level. Additionally, each tower included a data center. The data center design consisted of a 7/24 full generator/UPS backup system for HVAC, lighting and power within the room with 100% redundancy.

C O R P O R AT E O F F I C E

ANALOG DEVICES INC. (ADI )

Santa Clara, CA

Type: Office Size: 356,000 SF

AlfaTech provided MEP engineering and technology (low voltage and security) design services for the tenant improvements of Analog Devices (ADI) newly relocated corporate headquarters into two recently completed warm shell buildings in Santa Clara Square. This 356,000 SF project encompasses nine of the twelve floors. The flexible 280,000 SF office space accommodates 950 seats as well as amenities, various lab and specialty program spaces including: 40,000 SF of light electronic labs; 10,000 SF electronic test lab with Class 100,000 clean room; 700 SF of wet labs; 1,200 SF data center; 11,000 SF customer experience center; an executive board room; logistics / shipping / receiving area; and a raised style 60 person auditorium.

C O R P O R AT E O F F I C E

NETFL IX

Los Gatos, CA

AlfaTech provided expertise in building assessment plus evaluation / recommendations to resolve issues at the Los Gatos site for over 900,000 sf of building space. AlfaTech assessment included:

• Interview Client on facility issues and expectations. • Assess all existing MEP systems for reliability.

• Review equipment life expectancy / longevity. • Provide power quality and load assessment • Recommendations for MEP sustainable system replacement. • Present in-depth reports and executive summary. • Project specific maintenance prevention report based on system evaluations. • Ongoing MEP support with existing facilities systems.

The scope of work included the following buildings. Electrical evaluation for buildings: • 131 Albright Way, Building ‘D’ (3 floors, 113,520 SF) • 121 Albright Way Building ‘E’ (4 floors, 147,459 SF) • 111 Albright Way. Building ‘F’ (4 floors, 148,429 SF) • 101 Albright Way, Building ‘G’ (3 floors, 112,470 SF) • 160 Albright Way, Parking Garage (4 floors, 295,362 SF)

ADDITIONAL PROJECTS • Netflix Building E, Los Gatos, CA HVAC Engineering and evaluation to provide conditioning for LAB expansion in building E. • Netflix Building Lab HVAC Engineering and design for building lab conditioning including evaluation of existing building HVAC systems. • Netflix Conference Room of the Future, Los Gatos, CA MEP engineering and Lighting design support for new conference room technology. • Netflix Building E, Lab E2, Los Gatos, CA Engineering and design new UPS / emergency backup systems for LAB E2. • Netflix Building E, MAT LABS, Los Gatos, CA Engineering and design new UPS / emergency backup systems for MAT LABS

C O R P O R AT E O F F I C E

VISA | METRO 1, 2, & 3

Foster City, CA

Type: Offices Size: 349,000+ SF

AlfaTech is providing MEP engineering design services for the multiple phases of tenant improvements for Visa Metro Campus in Foster City. Buildings 1 and 2 each are12-story office buildings with attached 4-level parking garages. The design included several floors of office space, specialty rooms, restrooms, prayer rooms, meeting rooms, copy/work rooms and amenities spaces including a tech connection bar, 4,000 SF health/wellness center, cafeteria, and auditorium/lobby. There is an interconnecting staircase between the floors and a bridge connecting the two buildings. Services included mechanical, electrical, and plumbing engineering; fire protection design; technology design, lighting design and construction administration.

Visa / Metro 1,2,3

C O R P O R AT E O F F I C E

CONFIDENTIAL CL IENT | AM

Sunnyvale, CA

Type: Office Size: 224,490 GSF

AlfaTech provided MEP design services for the world’s largest e-commerce company’s Moffett Towers location. The tenant improvement project encompassed the entire 8-stories of an existing building. The project scope included upgrades to the 1st floor café, open area workstations, private offices, breakout areas, kitchenettes, and conference rooms. The project also included a primary IDF room on one floor, one IDF room on each remaining floor, and one full floor of R&D labs. In addition, AlfaTech has also provided commissioning support, complete building low voltage systems evaluation and central plant support for MEP required modifications and upgrades.

C O R P O R AT E O F F I C E

OKTA

123 N. Wacker, Chicago, IL

Type: Tenant Improvements Size: 30,000 SF

AlfaTech provided MEP design engineering services for the tenant improvements to the 4th and 5th Floors, each 15,000 SF, for a total of 30,000 SF. Project included open office workstations, meeting rooms, break rooms, phone rooms, IT rooms and support areas. The firm also provided MEP sustainability services to facilitate certification of the project site as LEED and WELL (4th and 5th Floor).

HIGHER EDUCATION

H I G H E R E D U C AT I O N

OHLONE COMMUNITY COLLEGE – LEED-NC PLATINUM

Newark, CA

Type: New Construction Size: 130,000 SF

AlfaTech provided mechanical and electrical engineering master planning and full design services for the new, 130,000 gross square foot, 81-acre, multi-building campus in Newark. Our energy efficient design included the use of solar energy with roof-mounted PowerGuard 450kV photovoltaic panels, a large geothermal loop system for heating and air conditioning, highly efficient plumbing fixtures and an enthalpy wheel heat/energy recovery system. The MEP systems alone were responsible for 33 of the 55 of the LEED points attained to achieve a LEED-NC Platinum certification for this project (the first LEED Platinum community college in the country). The systems will help to save more than $2.6M in operating expenses over the next 25 years. The campus program includes the Learning Resource Center, student support services, administration, information services, a cafeteria & food services, student dining, language labs, classrooms, lecture halls, video conferencing, computer labs, an aerobics room, a fitness center, a bookstore, Health Services, nursing labs, science and environmental labs, cadaver storage, biology life sciences, and business & technology labs. Building Design and Construction Magazine 2009 Gold Team of the Year Award, Health Science and Technology Center • CCC/IOU Partnership's Community College Sustainability Best Practices Award Overall Sustainable Design Category of New Construction & Major Rehabilitation • Community College Facility Coalition (CCFC), Design Award of Merit, August 1, 2008 • Silicon Valley/San Jose Business Journal Structures, Best Green Project, October 1, 2008 • US Environment Protection Agency (EPA), Environmental Awards Environmental Hero, February 1, 2008 • California Construction Magazine Best of 2008 Awards Program, Winner, Green Building Category •

H I G H E R E D U C AT I O N

SOKA UNIVERSITY OF AMERICA

Aliso Viejo, CA

Type: Campus Expansion Size: 200,000 SF

The firm is providing mechanical, electrical, and plumbing engineering design services for this university campus expansion project for Soka University which consists of two buildings. The 4-story, 100,000 SF STEM building will house teaching and science and research laboratories, classrooms, offices, a large auditorium, collaboration areas, meeting rooms, open study areas. The building’s instructional lab modules allow for interactive teaching and hands-on learning in this open, flexible, interactive and sustainable building.

The Resident Housing will be 4 stories and approximately 65,000 SF comprised of approximately 75 to 80 rooms and a rooftop patio.

Both proposed projects will be designed to accommodate a LEED Gold Building Certification, and an exterior architectural design pallet that will respect the current design features, landscaping and cultural aspects of the campus.

H I G H E R E D U C AT I O N

COLLEGE OF MARIN – LEED GOLD

Kentfield and Indian Valley, CA

Type: New Construction, Additions and Modernizations Size: 170,000+ SF Projects:

• Physical Education Building Remodel (Kentfield) – 44,000 SF • Science/Math/Central Plant Complex (Kentfield) - 60,000 SF • Transportation Technology Complex (IVC) – 10,000 SF • Main Building Complex (IVC) – 36,000 SF • Campus Master Planning for Kentfield and Indian Valley Campuses The firm was selected to provide all up-front engineering services relating to all planned bond projects including the master planning, district-wide energy modeling, district-wide mechanical, electrical and plumbing facility assessments and design standards for the District with projects totaling over 170,000 SF. We provided engineering design services and design and construction administration for the renovation of the Diamond P.E. existing complex. The project included new HVAC and electrical distribution. An energy management control system (EMCS) links directly to the new central campus EMCS system on the central part of the Kentfield campus. The project also includes a photovoltaic system which will either provide electrical for distribution in the building or supplemental hot water for the swimming pool. The Science/Math/Central Plant on the Kentfield campus includes a new energy efficient, geothermal underground / renewable energy HVAC system. The new 650-Ton, 340 vertical bore geothermal system provides heating and cooling via ground coupled water source heat pumps to the new Complex and Fine Arts buildings as well as two campus pools. The field was designed and phased for future expansion to support the entire Kentfield campus. The Transportation Technology facility on the Indian Valley campus required the total renovation of 10,000 SF which includes automobile technology repair facilities and instructional offices. The facility includes a radiant floor heating system and a solar thermal system to provide domestic hot water. In addition, the firm is working with the Kentfield campus on the Larkspur Annex to upgrade the electrical services and distribution to create a staging area for future campus construction.

H I G H E R E D U C AT I O N

EVERGREEN VALLEY COMMUNITY COLLEGE

San Jose, CA Type: New Construction and Modernizations Size: 100,000+ SF Projects: • New Learning Resource Center • Chemical Laboratory (Modernization) • Administration (Modernization) • New Fine Arts Center

The firm was contracted to perform various on-campus additions and renovations. The first project consisted of a new two-story Learning Resource Center containing open lab, distance learning, circulation and supporting area totaling 70,000 SF; basement containing Tech Support, Cable Studio of 7,500 SF and mechanical space of 3,000 SF. Our experience at this campus also includes design of MEP/Technology for a new 2,200 SF Fine Arts Center design. The firm also performed the remodel of the 2nd Floor (approximately 20,000 SF) which houses the campuses laboratory. In addition, a due diligence evaluation was conducted to document current and past operational problems, and will be used to determine potential system deficiencies based on the current building use and systems installed.

H I G H E R E D U C AT I O N

ANTELOPE VALLEY COLLEGE | HEALTH & SCIENCE BUI LDING

Lancaster, CA

Type: Higher Education Size; 94,240 SF

This project consists of a new science laboratory and office building of 94,240 square feet located in Lancaster, California. The project includes 44,706 square feet of laboratory space with the remaining square footage consisting of offices and other non-laboratory spaces including a planetarium. The building has a very unique shape and a very large footprint. It is also in the relatively harsh high desert area of Southern California which presents HVAC design issues among others. Due to the nature of chemicals involved in the laboratories, and high desert winds, a sophisticated wind tunnel test was performed to assure proper exhaust air location and treatment.