AlfaTech Big Book: Corporate Campus

AlfaTech is a consulting engineering firm offering a range of complementary services and expertise in multiple markets. Our services include: Mechanical and Electrical Engineering Design, Technology, Architectural Lighting Design, Commissioning and Energy Solutions, as well as Sustainability.

INNOVATIVE IDEAS | INTEGRATED SOLUTIONS | SUSTAINABLE PARTNERSHIPS

01

OVERVIEW / Profile & Services

02 Sustainability

03

Markets & Relevant Projects

OVERVIEW 01

Profile & Services

P R O F I L E

ALFATECH

AlfaTech has built a reputation over 30+ years providing the most innovative and sustainable engineering solutions starting at the master planning phase and continuing through construction administration. Our clients include high tech clients, service firms, large organizations in various industries, local and multi-national companies, and many ongoing clients we’ve been serving for years. We provide intelligent and cutting edge design at every turn, beginning at the commencement of every project in order to provide maximum benefit to our clients through the entire process. Our engineering solutions are highly efficient and cost effective, and ensure clients the greatest possible return on investment. Overall, we strive to develop the most dynamic relationships, be attentive to the needs of our clients and partners, and be true team players. With this mindset, we’ve proudly built a stellar list of clients.

RSBG COMPANIES

AlfaTech is part of a network of experienced companies that provide relevant services across the globe. These firms possess the most innovative and brightest talent which ensures the most forward thinking solutions and services for all projects in all the markets we serve. These companies operate from numerous offices in Europe, the Middle East, Asia and Africa. Now with over 6,400 staff members worldwide and in over 30 countries we

can serve all of our clients’ needs. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Collectively, the expertise of AlfaTech and RSBG provides engineering solutions that augments the vision of our clients and enables the most groundbreaking workplaces that go beyond current trends, and enable all future-of-work strategies.

Uber, Mission Bay 1 & 2

L O C AT I O N S

US San Jose, California

San Francisco, California Los Angeles, California Ventura, California San Diego, California Monrovia, California Atlanta, Georgia Edison, New Jersey

EUROPE Vienna, Austria Le, Denmark Paris, France Berlin, Germany

MIDDLE EAST Doha, Qatar Madiant Zayad, UAE Abu Dhabi, UAE

Al Ain, UAE Dubai, UAE Baghdad, Iraq Amman, Jordan

Bochum, Germany Frankfurt, Germany Hamburg, Germany

Munich, Germany Rostock, Germany Stralsund, Germany Ribnitz-Damgarten, Germany Wiesbaden, Germany Cologne, Germany Athens, Greece Madrid,Spain Zurich, Switzerland

Jeddah, Saudi Arabia Riyadh, Saudi Arabia

AFRICA Beau Bassin, Mauritis Cairo, Egypt Algeria Libya Sudan

Istanbul, Turkey Birmingham, UK Bishop’s Strotford, UK Croydon, UK Edinburgh, UK Exeter, UK Leamington Spa, UK Leeds, UK London, UK Luton, UK

ASIA Brahmanbaria, Bangladesh Dhaka, Bangladesh Dehradun, India Delhi, India Gandhingar, India Mumbai, India New Dehli, India

Pune, India Rajkot, India

Maidenhead, UK Manchester, UK Nottingham, UK Stockport, UK Sunderland, UK Wakefield, UK

Visakhapatnam,India Manilla, Philippines Singapore, Singapore Bangkok, Thailand

P R O F I L E

S E R V I C E S

MECHANICAL ENGINEERING DESIGN HVAC

ARCHITECTURAL LIGHTING DESIGN Lighting and Lighting Controls Lighting Calculations

COMMISSIONING | ENERGY SOLUTIONS Early Quantifiable Energy Study Incentives

Heating Systems Water and Gas Cooling Systems / Chilled Water Dehumidification Systems Contamination Sensitive Areas Industrial Hygiene Systems Low Tolerance Temp Control Title 24 Analysis and Design Heat Recovery Systems Central Utility Plants Air Handlers HVAC System Controls PLC Programming Fire Protection and Plumbing

Customized ROI Calculations Sustainable Lighting Design Energy Savings Analysis Custom Lighting Fixtures Custom Lighting Fixtures Design

Energy Star® Assessments Retro-commissioning (RCx) Monitoring Brand Continuous Commissioning (MBCCx) ASHRAE Level 1, 2 and 3 Energy Audits Measurement and Verification (M&V) of installed projects Energy Modeling Net Zero Energy Budgeting HVAC/Chilled Water Plant Optimization

TECHNOLOGY DESIGN Low Voltage Design Audio Visual Design

Security Systems Design Architectural Acoustics Wireless Design & Modeling Distributed Antenna Systems (DAS) Integrated Building Management Systems BMS Network Integration Telco Facilities and Services Voice Systems and Applications Relocation & Data Center Migration Services Strategic Planning and Analysis Project Management Management Consulting SUSTAINABILITY Sustainability Planning (Organizational and Infrastructural) LEED / Green Building Consulting Masterplanning Life Cycle Cost Assessment Occupant Wellness and Comfort

PROCESS Industrial Waste Collection Acid Neutralization Bio-Kill Waste System Process Waste Containment Ultra pure De-ionized Water Systems USP Water WFI Specialty Chemicals Chemical Storage

ELECTRICAL ENGINEERING DESIGN Power Systems

Emergency & Standby Power Lighting and Lighting Controls Security Systems 24 / 7 Power Systems (UPS) Power Monitoring Systems Toxic Gas Monitoring Graphic Control and Alarm Panels Grounding and Bonding

Lab and Special Gas Systems Ultra High Purity Gas Piping

Bulk & Specialty Gases Toxic Materials Handling Code Compliance Process Distribution Piping Process Cooling Water Medical Gas Medical Vacuum Waste Anesthetic Gas Disposal system (WAGD) Dental Vacuum System Dental Water System

Energy Management Energy Conservation Fire Alarm Systems Public Address Systems Plug Loads Control

Façade Engineering CFD / Wind Studies Wind Studies Thermal Stratification Studies Energy Concept Studies

S E R V I C E S

GREEN BUILDING

SUSTAINABILITY

LIFE

MECHANICAL ENGINEERING DESIGN

ELECTRICAL ENGINEERING DESIGN

OF A BUILDING RETRO COMMISSIONING

ARCHITECTURAL LIGHTING

TECHNOLOGY

COMMISSIONING / ENERGY SOLUTIONS

CONS TRUCT I ON

OCCUPANCY

END OF US E

DES I GN

” ...Scientists dream about doing great things. Engineers do them.”

James Michener

SUSTAINABILITY 02

S U S T A I N A B I L I T Y

AlfaTech follows a holistic approach to meet project expectations in all dimensions. Providing sustainable design is an achievement if it is also functional. Increasing efficiency is realistic when it is applicable. Meeting the project budget is possible when the design is constructible.

We take pride in our designs and ensure that the following principles are aligned in our approach to every project:

• Implementing sustainable solutions • Environmental awareness and reducing carbon footprint • Creating a stress-free, comfortable and healthy environment • Optimizing building performance, reducing energy and water usage • Utilization of the latest smart building technology and occupant environmental control, including temperature control, lighting control, building envelope shading, acoustic and air quality by means of enhanced filtration system At AlfaTech, we have a multidisciplinary team of experts to assess and design projects with an integrated approach. Working along with owners, architects and other stakeholders, we examine every project with a comprehensive, systematic approach to meet the client’s sustainability, energy, water and environmental quality goals. AlfaTech goes beyond engineering – our suite of energy, water and sustainability assessment services creates projects that benefit the triple bottom line – people, planet and profit. We provide expert studies in all qualitative aspects of the built environment such as day lighting, thermal comfort, advanced lighting control design, and technology integration.

We examine every project with a comprehensive systematic approach to meet the client’s sustainability, energy, water and environmental quality goals.

S U S T A I N A B I L I T Y

ADVANCED SIMULATIONS

We provide various advanced computer simulations to study wind patterns, thermal stratification and comfort issues in spaces, building façade studies and energy modeling to aid architects and owners make key decisions during the early stages of design.

• Façade Engineering • CFD/Wind Studies • Thermal Stratification Studies • Energy Concept Studies • Energy Modeling • Daylighting Modeling

S U S T A I N A B I L I T Y

CASE STUDY:

UBER MB 1 & 2 – LEED PLAT INUM / WELL GOLD MI SS ION BAY HEADQUARTERS

San F ranc i sco, CA

AlfaTech is currently involved in Uber’s innovative new San Francisco headquarters which is a new 420,000 square-foot, ground up office building in the Mission Bay district. We provided design/bid/build style Mechanical, Electrical, and Plumbing (MEP) engineering, lighting design, and Technology (low voltage, security, audio/visual) services, throughout the entire project. AlfaTech is part of the construction administration effort and served as the engineer-of-record for mechanical and electrical installations. We assisted the architectural design team with optimizing performance by assessing various utility, façade and wind studies. Life-cycle cost analysis, energy benchmarking, and computational fluid dynamics were critical tools to inform the design effort. The project is designed as an innovative, ultra-high performance building that focuses on an occupant-centric workplace and includes an elaborate IT infrastructure, a façade that responds to programmatic needs, an under floor air distribution system, a two-building atria system incorporating natural ventilation, and a central treatment system for collecting graywater and rainwater. The interactions between the occupants, the buildings, and the ambient, were at the heart of the architectural and engineering systems; targeting lower environmental metrics of 1,100,000 kWh in reduced energy use and 2,100,000 gallons in reduced water use.

• High-performance LED lighting with an occupancy driven network-based lighting control • Fuel cells redundantly powering building network operations • Solar domestic hot water system • PV-ready electrical system • Integrated building management system, including Smart Building Technology

• Significant reduction of building energy by means of combined hydronic chill beam and underfloor air system (UFAD) • Aggressive rainwater capture and retention. • Graywater reuse • Natural ventilation for main atrium social areas, creating a pleasant, open experience for employees and visitors. • Maximize use of day lighting to optimize workspace quality.

S U S T A I N A B I L I T Y

CASE STUDY:

LUCAS MUSEUM OF NARRAT IVE ART Los Ange l es , CA

The Lucas Museum was conceived with the bold ambition to challenge the way our societies appreciate art museums. Inspired by its resolute mission, the engineering design blasted off with the vision to deliver a lasting, centenarian building in harmony with its site. The carbon zero design harnessed heat and cooling from the soil beneath the museum with over 700 vertical bores. This constituted the deepearth, pulsating aorta of the geothermal field. A second element of nature was introduced by way of a thermally active water pond, which increased the site’s innate cooling capacity. These features were modulated by the high-efficiency, heat recovery central plant that provided all-electric, simultaneous heating and cooling (and no gas-fired boilers). Environmental quality for prime spaces – galleries, state of the art theaters, and lobbies – were controlled with underfloor air-distribution and radiant floors. Smart controls gently nudged temperature and ventilation parameters to adjust to visitors’ comfort. The superstructure lifted off with an exterior façade that self-shaded the thermal shell, effectively reducing cooling demand. Curved onyxglass organically traced the rooftop which formed the solar PV field. At 365 kW capacity, the renewable energy source reduced an estimated 10-15% of the electricity demand and swung the carbon footprint negative. Ahead of its time, the Lucas Museum will open the doors as an eco-friendly, ‘net zero energy’-ready museum that gives back to the surrounding community.

• Geothermal loop • A solar energy system • Natural ventilation • Displacement system • LED lighting • Spectrally selective glazing

• Grass and native plants • Ecological ponds • EV charger • Rainwater harvesting • Energy efficient HVAC system • Hydronic bidirectional heating/cooling flooring systems

S U S T A I N A B I L I T Y

CASE STUDY:

DELTA PRODUCTS HEADQUARTERS F remont , CA

Delta Products desired a new headquarters highlighting sustainability and energy efficiency with primary goals to showcase Delta Products’ innovation in a state of the art building blending the natural surroundings with sustainable building design. The Delta Americas Headquarters is a three-story 250,000 SF campus consisting of private offices, administrative, open workspace, conference/auditorium facilities, kitchen/dining areas, labs, office and warehouse. AlfaTech provided sustainable mechanical electrical plumbing engineering design services for this project focusing on the client’s desire to maximize natural ventilation and daylighting reduce water and energy consumption with a geothermal central plant and utilize radiant systems for primary space conditioning. AlfaTech conducted extensive CFD modeling to assist with sizing and locating windows around the building and their integration into a thermal tower ventilation strategy. The project also encompasses a photovoltaic system to balance energy consumption and achieve Net Zero Energy.

• Two passively conditioned, interconnected atria • Shaded facade with automated natural ventilation • Chilled sails and occupant- controlled underfloor air- distribution systems • High-performance LED lighting with an occupancy driven network-based lighting control

• Graywater reuse and rainwater catchment systems • Integrated building automation, controls and management platforms • Full air-side and water-side economizing • Fuel cells redundantly powering building network operations • Solar domestic hot water system • PV-ready electrical system

We believe making the world a better place is a responsibility we all share. And being able to do our part in the way we work is one of the best ways we can give back and have a positive effect on our environment. This means, not only do we always strive to provide the most sustainable solutions for our clients, but we are also always working on new, innovative and pioneering methods to bring sustainability to the next level, staying ahead of the curve in all types of projects in all the markets we serve.

Let’s leave the world a better place than we found it.

03 MARKETS

& Relevant Projects

ADI, Santa Clara, CA

CORPORATE CAMPUS

C O R P O R AT E C AMP U S

UBER | MI SS ION BAY 1 & 2 LEED PLATINUM, WELL GOLD San Francisco, CA

Type: New Site, Two High-Rise Office Buildings Size: 420,000 SF

AlfaTech is currently involved in Uber’s innovative new San Francisco headquarters which is a ground up office building in the Mission Bay district. AlfaTech provided design/bid/build style Mechanical, Electrical, and Plumbing (MEP) engineering, lighting design, and Technology (low voltage, security, audio/visual) services, throughout the entire project. AlfaTech is part of the construction administration effort and served as the engineer-of-record for mechanical and electrical installations. AlfaTech assisted the architectural design team with optimizing performance by assessing various utility, façade and wind studies. Life-cycle cost analysis, energy benchmarking, and computational fluid dynamics were critical tools to inform the design effort. The project is designed as an innovative, ultra-high performance building that focuses on an occupant-centric workplace and includes an elaborate IT infrastructure, a façade that responds to programmatic needs, an under floor air distribution system, a two-building atria system incorporating natural ventilation, and a central treatment system for collecting graywater and rainwater. The interactions between the occupants, the buildings, and the ambient, were at the heart of the architectural and engineering systems; targeting lower environmental metrics of 1,100,000 kWh in reduced energy use and 2,100,000 gallons in reduced water use.

The buildings' eco-friendly features consisted of: • Two passively conditioned, interconnected atria • Shaded facade with automated natural ventilation

• Chilled sails and occupant-controlled underfloor air-distribution systems • High-performance LED lighting with an occupancy driven network-based lighting control • Graywater reuse and rainwater catchment systems • Integrated building automation, controls and management platforms • Full air-side and water-side economizing • Fuel cells redundantly powering building network operations • Urban garden • Solar domestic hot water system • PV-ready electrical system

Awarded Savings by Design Incentive

C O R P O R AT E C AMP U S

UBER | MI SS ION BAY 3 & 4 LEED GOLD, WELL GOLD New Warriors Arena, San Francisco, CA

Type: New Site, Two High-Rise Office Buildings Size: 435,000 SF

AlfaTech provided comprehensive engineering and technology design for two new high-rise buildings for Uber’s new headquarters. AT provided design services for full design, MEP, Technology, and lighting system design for the tenant improvements. Scope included administrative office space, full kitchen/cafeteria, conference center and retail space.

C O R P O R AT E C AMP U S

L INKEDIN | 222 2ND STREET – LEED PLATINUM

San Francisco, CA

Type: High-Rise Office and mixed-use Size: 450,000 SF

As the world’s largest Internet professional networking site, LinkedIn has grown exponentially since its start in 2003. For the past several years, AlfaTech has provided services for many of their offices worldwide.

This 26-story tenant improvement project, is located in the heart of San Francisco’s South of Market neighborhood at 222 Second Street. With this lease, LinkedIn brings together their R&D and sales teams, approximately 2,250 employees, under one roof. AlfaTech provided mechanical, electrical and plumbing engineering, Low Voltage, Audio Visual design and LEED fundamental and enhanced commissioning services services for this new ground-up project which includes extensive interior build-out of 20,000 sf of space dedicated to a contemporary kitchen, servery and seating as well as a state-of-the-art "All Hands" presentation room and complete Fitness Center, 2,209 sq. feet of ground retail, and two levels of subterranean parking.

222 Second St. is certified LEED Platinum.

C O R P O R AT E C AMP U S

L INKEDIN

Sunnyvale, CA

Type: Campus Size: 576,000 SF

AlfaTech provided mechanical, electrical, and plumbing engineering and lighting design services for this new ground-up campus that includes a full cafeteria and multipurpose space.

L INKEDIN

Mountain View, CA

Type: Office Size: Approx. 575,000 SF

Projects: • Building B: 6 stories, 208,500 SF • Building C: 6 stories, 208,500 SF • Building D: 4 stories, 152,600 SF • Campus Service Building: 5,000 SF

AlfaTech provided mechanical, electrical, plumbing engineering, and lighting design services in support of tenant improvements for three buildings and a campus service building

C O R P O R AT E O F F I C E

NETFL IX

Los Gatos, CA

AlfaTech provided expertise in building assessment plus evaluation / recommendations to resolve issues at the Los Gatos site for over 900,000 sf of building space. AlfaTech assessment included:

• Interview Client on facility issues and expectations. • Assess all existing MEP systems for reliability.

• Review equipment life expectancy / longevity. • Provide power quality and load assessment • Recommendations for MEP sustainable system replacement. • Present in-depth reports and executive summary. • Project specific maintenance prevention report based on system evaluations. • Ongoing MEP support with existing facilities systems.

The scope of work included the following buildings. Electrical evaluation for buildings: • 131 Albright Way, Building ‘D’ (3 floors, 113,520 SF) • 121 Albright Way Building ‘E’ (4 floors, 147,459 SF) • 111 Albright Way. Building ‘F’ (4 floors, 148,429 SF) • 101 Albright Way, Building ‘G’ (3 floors, 112,470 SF) • 160 Albright Way, Parking Garage (4 floors, 295,362 SF)

ADDITIONAL PROJECTS • Netflix Building E, Los Gatos, CA HVAC Engineering and evaluation to provide conditioning for LAB expansion in building E. • Netflix Building Lab HVAC Engineering and design for building lab conditioning including evaluation of existing building HVAC systems. • Netflix Conference Room of the Future, Los Gatos, CA MEP engineering and Lighting design support for new conference room technology. • Netflix Building E, Lab E2, Los Gatos, CA Engineering and design new UPS / emergency backup systems for LAB E2. • Netflix Building E, MAT LABS, Los Gatos, CA Engineering and design new UPS / emergency backup systems for MAT LABS

C O R P O R AT E O F F I C E

NETFL IX

Los Gatos, CA

AlfaTech provides MEP support for Netflix Los Gatos, CA campus and has developed a Partnership with the Facilities Team. Our focus has been to support all Facility needs including MEP Engineering and design along with evaluations for system reliability. AlfaTech is currently working with the Netflix Team on building energy and sustainability incentives to reduce overall energy consumption along with indoor air quality and preventative maintenance procedures.

The scope of work included the following buildings. Electrical evaluation for buildings: • 100 Winchester Blvd. Building 'A' 3 floors plus 2 underground parking level Total 81,340 SF • 150 Winchester Circle, Building 'B' 3 floors plus 3 underground parking level Total 83,728 SF

ADDITIONAL PROJECTS • Netflix Building A & B, Los Gatos, CA

Electrical and mechanical review and support for Building A & B roof RTU replacement.

• Netflix Building A & B, Los Gatos, CA

Commissioning and support for HVAC replacement for roof top units.

• Netflix Building A & G, Los Gatos, CA

Review of existing LAB electrical loads and provide new UPS system to support all LAB expansion in building A & G.

• Netflix Conference Rooms, Los Gatos, CA

HVAC evaluation for improvement of building ventilation for conference rooms.

• Netflix Temp Generator, Los Gatos, CA

Electrical Engineering and review on generator backup.

• Netflix Palisades Theater, Los Angeles, CA

Engineering and due diligence assessment for space build out of existing theater.

C O R P O R AT E O F F I C E

CONF IDENTIAL CL IENT | GM

345 Spear Street, San Francisco, CA

Type: Tenant Improvement Size: 89,000 SF

MEP services for new 89,000 SF office space on one single floor plate to house this client’s first San Francisco presence. AlfaTech provided MEP Bid Documents and subsequent review of the MEP Design-Build Subcontractors’ Permit and Construction Drawings. This project consists of the 6th floor build out, including new 64,000 SF café, remodel of another 8,000 SF Café and 5th floor remodel. This project included video conference rooms, creative break-out spaces, lunch/break areas, and server room.

CONF IDENTIAL CL IENT | GM

Various Locations

Providing ongoing services for world’s largest search engine company. More than 25 projects in the last 7 years. Provided MEP services for client’s first presence in San Francisco on 385 Spear Street. In addition, AlfaTech has been commissioned to provide advanced electrical system engineering to increase energy efficiency and improve ROI / life cycle cost for network systems.

Current Projects: • 620 National

• 237 Moffett Park Drive • Moffett Gateway • 2598 Bayshore • 475 Ellis Emulation Labs • 1255 Pear Avenue • Two Rincon • 1625 Plymouth

• 999 Bayhill • 1111 Bayhill • Crittenden Lane Campus

• Brokaw Campus • 1225 Charleston • 1098 Alta

C O R P O R AT E C AMP U S

CONF IDENTIAL CL IENT | AC

Confidential Location

Type: Campus Size: 752,000 SF

AlfaTech has provided full MEP design services for this confidential client. The project achieved LEED Platinum as per the City requirements for tenant improvements to all buildings. The project awarded design incentives provided by saving by design. This campus consists of: three interconnected, six-story office buildings with two levels of podium parking on the ground totaling 752,100 SF; 25,000 SF cold core and shell café building with full service commercial kitchen with variable flow system; six-story parking garage; open and collaborative environment with furniture systems; private offices; software/light-hardware labs in buildings 1 and 2 totaling 36,000 SF; server room with cooling redundancy; fitness center and wellness center, 10,000 SF each, in office tower 1 on level 3.

Awarded Savings by Design Incentive

C O R P O R AT E O F F I C E

VI SA | METRO 1, 2, & 3

Foster City, CA

Type: Offices Size: 349,000+ SF

AlfaTech is providing MEP engineering design services for the multiple phases of tenant improvements for Visa Metro Campus in Foster City. Buildings 1 and 2 each are12-story office buildings with attached 4-level parking garages. The design included several floors of office space, specialty rooms, restrooms, prayer rooms, meeting rooms, copy/work rooms and amenities spaces including a tech connection bar, 4,000 SF health/wellness center, cafeteria, and auditorium/lobby. There is an interconnecting staircase between the floors and a bridge connecting the two buildings. Services included mechanical, electrical, and plumbing engineering; fire protection design; technology design, lighting design and construction administration.

VI SA | 385 SHERMAN AVENUE – LEED GOLD

Palo Alto, CA

Type: Office Size: 51,000 SF

AlfaTech provided MEP engineering design services for this tenant improvement project for Visa in Palo Alto. The 3-story, mixed use building which also includes two subterranean parking levels. This project encompasses a combination of office and collaboration spaces for over 300 Visa employees including reception/lobby, conference rooms, telephone rooms, huddle rooms, copy/mail room, lounge and collaboration areas, breakroom/pantry, as well as prayer and mothers rooms.

The project is LEED Gold certified.

Visa / Metro 1,2,3

C O R P O R AT E C AMP U S

CI SCO

San Jose, Milpitas, Santa Clara, CA, Texas & Amsterdam

Type: Office, R&D, Manufacturing Size: 6.3 M+ SF

Site 1: 850,000 SF, eight buildings Site 2: 600,000 SF, four buildings Site 3: 315,000 SF, three buildings Site 4: 3.3 million SF, nineteen buildings Site 5: 1.2 million SF, five buildings

Cisco selected AlfaTech to provide engineering design services for all five sites comprising their world headquarters campus. These buildings, which range from one to four stories, contain a variety of space types, including data center, office, research and development, engineering labs and testing areas, manufacturing, cafeteria, conference, executive briefing, and a fitness center. The firm has been involved with Cisco both nationally and internationally on projects during various stages of engineering services. A substantial PG&E energy rebate resulted from our energy-saving mechanical systems designs, the project also won a separate energy award. Site 1 has a manufacturing plant, and a main engineering and MIS data center. Site 2's data center supports Cisco’s seven day/twenty-four hour online corporate network connectivity, and the infrastructure was designed to support future engineering lab and bench functions. Site 3 buildings required stringent control of temperature and humidity. For Site 4, the firm also performed studies for site utility alternatives including cogeneration.

C O R P O R AT E C AMP U S

CORES ITE – LEED GOLD

Santa Clara, CA

Type: Office, Data Center Size: 90,000 SF

This fast paced project converted an existing single story concrete tilt-up building with a new 2-story building including tier III data center space and building common, core, and office. CoreSite was recognized by Silicon Valley Power as an “Environmental Innovator” for the building’s estimated 6 million kW-hour annual energy usage reduction, achieved through the energy-efficient air temperature design.

INFORMATICA

Redwood City, CA

Type: Campus Size: 200,000 SF

This high-tech client relocated their corporate headquarters to a new campus featuring offices, conference facilities, food services, and administrative spaces.

C O R P O R AT E C AMP U S

SUNPOWER CORPORATION

Richmond, CA

Type: Campus Size: 180,000 SF (Office Headquarters)

AlfaTech provided design-build services for this innovative solar panel company’s expansion into the historic Ford Manufacturing Plant is a stunning adaptive reuse project. Originally built in 1931, the Ford facility has been transformed into a modern space that now houses 200,000 SF of office space, a 65,000 SF manufacturing plant, and 30,000 SF of R&D facilities Key components of the project include R&D tool installations, manufacturing rack and assembly, and a roof PV plant. AT provided project management services during lease and work letter scope definition negotiations with the developer’s design-build team. The move in to the facility was completed on schedule and on budget.

C O R P O R AT E C AMP U S

ADOBE SYSTEMS HEADQUARTERS

San Jose, CA

Type: Campus: Office, Data Center & Labs, Parking Garages Size: Three new buildings, 1,000,000 SF total

Building One: 18-story tower, 440,000 SF office and data center, 940-car parking garage

Building Two: 15-story tower, 275,000 SF office and data center, 900-car parking garage

Building Three: 18-story, 266,000 SF office, labs, conference rooms and data center, parking garage

Now considered a landmark on the San Jose skyline, the Adobe Systems headquarters campus is the daytime home for more than 2,000 engineers and administrative and executive staff. Each building has its own parking garage, public lobby, data center, meeting rooms, and mailroom. Shared facilities include an auditorium, a full-service cafeteria, and a fitness center. Building two also features retail space at street level. Additionally, each tower includes a dedicated raised-floor computer room (data center) which serves the entire building. Our design of the computer rooms consisted of a 7/24 full generator/UPS backup system for HVAC, lighting and power within the rooms, with 100% redundancy.

C O R P O R AT E C AMP U S

PATHL INE Sunnyvale, CA

Type: Corporate Campus, Data Center Size: 350,000 SF Total / 7,000 SF Data Center

The firm provided full mechanical, electrical, and plumbing engineering services for this campus project.

The project consisted of four buildings, warm core and shell, with labs, 7,000 SF data center with server load and UPS 1,500 kW, amenities building, fitness center, cafeteria, office space, meeting areas and a parking garage.

PROOFPOINT HEADQUARTERS | PATHL INE PARK

Sunnyvale, CA

Type: Campus Size: 242,000 SF

AlfaTech is providing MEP engineering design services for the Proofpoint Corporate Headquarters at Pathline Park which encompasses two 121,000 SF, 3-story buildings totaling 242,000 SF. The new facility includes a 16,000 SF executive briefing center, 16,000 SF conference center, one 5,000 SF warehouse and shipping center, Infrastructure support rooms with one 10 rack MDF, and five 4 rack IDFs. The two buildings went into construction in September 2019 and will be delivered as warm shells with roof-top VAV package units, condensing boilers/pumps, medium pressure ducts, electrical rooms, elevators (both passenger & freight) and finished rest rooms.

C O R P O R AT E O F F I C E

ARUBA/HP NETWORKS

Santa Clara, CA

Type: Campus Size: 260,000 SF

AlfaTech provided mechanical, plumbing engineering and fire protection services for Aruba’s new campus located in Santa Clara. The project consists tenant improvements on building C, which is 40,000 SF, building D 200,000 SF and Remote building of 20,000 SF. This project also includes a kitchen, dining area, labs and various chambers. Shell/core is considered partially warm shell and requires additional cooling and electrical distribution from the existing main equipment.

C O R P O R AT E C AMP U S

LOGITECH – TARGET: LEED S I LVER

Newark, CA

Type: Corporate Campus Size: 263,000 SF

AlfaTech provided mechanical, electrical, plumbing, and fire protection engineering services to assist Logitech in relocating its corporate headquarters. The project consists of renovation of two 3-story buildings (7700 Gateway, Building No.8, floors one through three, and 7600 Gateway, Building No.9, floors one and two) with total square footage of 263,500 (246,500 SF of offices and conference rooms and 17,500 SF of labs). The project is being designed to LEED – Silver, CI certification.

GI LEAD SCIENCES

Foster City, CA

Type: Laboratory, Office, Manufacturing, Data Center Size: 30,000 SF Site and 15,000 SF Data Center

AlfaTech provided MEP and telecommunications design for all of Gilead’s newly acquired campus, which consists of 16 buildings that include administrative and private offices, development labs, pilot plants and cGMP therapeutic manufacturing and production areas. The firm also provided MEP engineering design services for Gilead’s 35,000 SF pilot plant on the Foster City campus as part of a previous project.

C O R P O R AT E C AMP U S

ADVANCED MICRO DEVICES

Sunnyvale, CA

Type: Corporate Campus: Offices, Data Center, Clean Rooms Size: Over 1,000,000 SF

Projects: Commons Building including Cafe

MTD Laboratory Renovations Building 915, Lab/Clean room Buildings 926, 936 CEC and IO Laboratory Buildings 898, 920, 930 and 950, Offices and Labs Data Center

AlfaTech has been providing comprehensive engineering services for AMD since 1980. Projects have consisted of new buildings and various renovations, including offices, clean rooms, data centers, and a new 50,000 SF Advance Commons Building. The Commons building, dedicated solely to conference, food service, dining and fitness activities, was the crowning touch in a long-term consolidation of AMD’s headquarters and Northern California research, development and manufacturing functions to one site. The facility contains an auditorium, cafeteria, fitness center, conference center, training rooms, company store, and a travel agency.

C O R P O R AT E C AMP U S

SYMANTEC – LEED S I LVER

China

Type: Campus, Office, Labs, and Data Center Size: 1,000,000 SF+ (total for all three phases)

AlfaTech provided design services for this campus in China consisting of office, data center and manufacturing facilities.

The project involved a research and development campus of four buildings including three high-rise buildings and totaling into an occupied area of over 1 million SF. The facilities have conventional office spaces, server rooms, MDF rooms, and a cafeteria with full-service kitchen.

CHARLES SCHWAB – LEED GOLD

San Francisco, CA and Phoenix, AZ

Type: Campus, Data Center, Retail Size: 1,750,000 SF

Charles Schwab’s ongoing partnership with AlfaTech began in 2006. Projects totaling 1.75m SF have included campuses, tech and data center evaluations, TIs, feasibility studies, computer room upgrades and retail branches, at locations across the country. The new retail branch location achieved LEED Gold certification for its sustainable features such as PV as a renewable energy source, low-flow water fixtures, and low-VOC finishes.

C O R P O R AT E O F F I C E

INTUIT – LEED GOLD Mountain View, CA

Type: Campus Size: 42,000 SF

AlfaTech was selected to provide mechanical, electrical, and plumbing engineering design services for a 42,000 SF office building conversion to a campus center for Intuit. Amenities include: 15,000 SF cafeteria, 12,000 SF fitness center, 13,000 SF conference center, and 3,000 SF “innovation gallery.” Exterior improvements include a sports court and amphitheater.

C O R P O R AT E C AMP U S

CONF IDENTIAL CL IENT

ELECTRONIC ARTS WORLD HEADQUARTERS CAMPUS Redwood City, CA

Fremont, CA

Type: Campus Size: 450,000 SF

Type: Office Size: 405,000 SF, three buildings

AlfaTech provided MEP design, process design, lighting design, technology design, energy modeling and commissioning for this existing 450,000 SF campuses. This facility incorporates offices, labs, warehouse and prototype manufacturing and includes classified clean room space on a custom four- foot raised floor allowing for extensive utility distribution. Most of the occupied space is on the first level, and the second level houses support infrastructure including electrical distribution, air handling units and technology support. Technology services included full design and construction administration for the low voltage-cabling infrastructure, security systems, and cabling pathway system throughout the facility. The Technology design included the layout and coordination for nine IDF Rooms, two data centers and multiple cleanroom environments. The low voltage-cabling infrastructure included copper and fiber backbone between the data centers and IDF rooms in addition to a variety of multi-port Work Area Outlets for open office, cleanroom, conference rooms and Wireless Access Point (WAP) devices. The Security design included all access control devices, video surveillance camera and design of the Security Control Center. Energy modeling guided the designers in equipment selection through process and HVAC, along with Life Cycle Cost Analysis Modeling, and Title 24 compliance. AlfaTech also compiled the LEED M&V plan for the facility that ensures energy usage is constantly tracked and monitored. AlfaTech also performed incentive application and management for all HVAC and process systems. Commissioning services included installation verification, start-up, pre-functional control and functional control commissioning conducted according to Title 24 and LEED standards. Lighting acceptance testing was conducted per state specifications.

The firm provided general engineering design services for development of the two new high-rise buildings at Electronic Arts’ 405,000 SF corporate campus, which contain office, software research and development, training, conference and demo rooms, and support space. A 50,000 SF Commons building features a full-service cafeteria and dining room, the company store, a video game arcade, a fitness center, a sports bar, and an area that can serve as either an auditorium or a gymnasium. The mechanical and electrical systems were designed for 24-hour occupancy.

ARUBA NETWORKS Santa Clara, CA

Type: Campus Size: 260,000 SF

AlfaTech provided mechanical, plumbing engineering and fire protection services for Aruba’s new campus located in Santa Clara. The project consists tenant improvements on building C, which is 40,000 SF, building D 200,000 SF and Remote building of 20,000 SF. This project also includes a kitchen, dining area, labs and various chambers. Shell/core is considered partially warm shell and requires additional cooling and electrical distribution from the existing main equipment.

INNOVATIVE IDEAS | INTEGRATED SOLUTIONS | SUSTAINABLE PARTNERS

VENTURA

MONROVIA

SAN DI EGO

LOS ANGELES

SAN FRANC I SCO

SAN JOSE

11440 West Bernardo Court, Suite 202 San Diego, CA 92127

2140 Eastman Ave. #103 Ventura CA 93003

421 E. Huntington Drive Monrovia, CA 91016

510 West 6 th Street, Suite 1105 Los Angeles, CA 90014

One Post Street, Suite 2200 San Francisco, CA 94104

1321 Ridder Park Drive, Suite 50 San Jose, CA 95131

619.810.7400

805.453.3565

626.930.1383

213.212.9860

415.403.3000

408.487.1200

Made with FlippingBook Learn more on our blog