AlfaTech Big Book: Corporate Office
C O R P O R AT E O F F I C E
NETFL IX
Los Gatos, CA
AlfaTech provided expertise in building assessment plus evaluation / recommendations to resolve issues at the Los Gatos site for over 900,000 sf of building space. AlfaTech assessment included:
• Interview Client on facility issues and expectations.
• Assess all existing MEP systems for reliability.
• Review equipment life expectancy / longevity.
• Provide power quality and load assessment
• Recommendations for MEP sustainable system replacement.
• Present in-depth reports and executive summary.
• Project specific maintenance prevention report based on system evaluations.
• Ongoing MEP support with existing facilities systems.
The scope of work included the following buildings. Electrical evaluation for (6) buildings including:
100 Winchester Blvd, Building 'A'
•
131 Albright Way, Building 'D'
•
121 Albright Way, Building 'E'
•
111 Albright Way, Building 'F'
•
101 Albright Way, Building 'G'
•
160 Albright Way, Garage
•
Made with FlippingBook flipbook maker