AlfaTech Big Book: Education – K-12
K - 1 2 E D U C AT I O N
CARLMONT HIGH SCHOOL MUS IC & ARTS – LEED GOLD
Belmont, CA
Type: Music & Arts Center Size: 25,000 SF
Provided mechanical, electrical, and plumbing/fire protection engineering services for this new 25,000 SF music center facility with 40 kW Solar PV. The facility will include class rooms and an auditorium along with support areas. This project achieved LEED Gold status.
Aragon High School
CAMPBELL UNION HIGH SCHOOL DISTRICT
San Jose, CA
Type: Performing Arts Centers Size: 5 schools
Projects: • Branham High School • Leigh High School • Del Mar High School
• Prospect High School • Westmont High School
AlfaTech provided mechanical, plumbing, electrical and technology engineering services for five new performing arts centers. Each performing arts center is a new theater complex of 9,000 SF for 200 seat capacities with lobby, seating, main stage, back stage area, green room, changing rooms, AV control room and all necessary supporting areas. Energy efficient “green building” Collaborative for High Performance Schools (CHPS) requirements were incorporated into the base of MEP design and AlfaTech provided MEP document requirements for CHPS certification to the LEED consultant.
Prospect High School
Made with FlippingBook - Online Brochure Maker