AlfaTech Big Book - K-12 Education

K - 1 2 EDUCAT I ON

CUPERTINO UNION SCHOOL DISTRICT

ALUM ROCK UNION SCHOOL DISTRICT San Jose, CA

SAN JOSE USD - BROADWAY HIGH SCHOOL San Jose, CA

Cupertino, CA

Type: Elementary, High School modernizations Size: Various Projects:

Type: Mechanical System Upgrades Size: Six Schools Projects:

Type : New Construction Size : 3,840 SF

• Blue Hills Elementary School • Carol Murdock Elementary • Collins Jr. High School • De Vargas Elementary School • Dilworth Elementary School • Eisenhower Elementary School • Faria Elementary School • Joaquin Miller Jr. High School • John Muir Elementary School • Lincoln Elementary School • McAuliffe Elementary School • Meyerholz Elementary School • Montclaire Elementary School • Nimitz Elementary School • Portal Elementary School • Regnart Elementary School • Sedgwick Elementary School • Stocklmeir Elementary School • West Valley Elementary School

• Arbuckle Elementary School • Dorsa Elementary School • Mathson Middle School • Pala Middle School • Lester Shields Middle School • Myer Elementary School • San Antonio Elementary School Fire Alarm System • Union Elementary School Restroom Upgrade

The firm provided mechanical, electrical and plumbing engineering services for this new one story Multi-Purpose building of 3,840 SF with a Multi-use / Dining room, warming server, restrooms and storage. This project is targeting LEED Gold status.

MERCED UNION HIGH SCHOOL DISTRICT Merced, CA

The firm completed multiple projects for Alum Rock Union School District, including mechanical system improvements for the overall modernization program. AlfaTech provided engineering services for the assessment of six middle schools and 18 elementary schools. Our services included review of drawings, site surveys and review of existing conditions, reports, recommendations, and final report with the District’s feedback.

Type: New Campus Size: 53 acres

AlfaTech provided mechanical design services for the new Bellevue Road Area High School campus in Merced.

The firm was selected to provide district-wide modernization of both existing and new facilities for 20 schools as part of the SB-50 bond measure. Services included mechanical, electrical, plumbing, and low voltage systems, energy management systems and lighting upgrade. Upgraded facilities include classroom, modular, kitchen, auditorium and administrative space. Previous projects included mechanical, electrical and plumbing renovations and design for various schools. These include the Joaquin Miller’s new administration and library building; Lincoln’s new library and renovation of 6 buildings; McAuliffe’s modernization of 6 buildings; and Sedgwick’s 5 new buildings.

Made with FlippingBook flipbook maker