ADOBE NA1 DATA CENTER

Hillsboro, OR

Type: Data Center Size: 70,000 SF

Adobe Systems selected AlfaTech to perform design services for its DC1 data center project located in the State of Oregon. This project is a greenfield design of a LEED Certified 70,000 SF steel and precast or tilt-up data center. The data center consists of approximately 30,000 SF of “data hall” space for IT/Server equipment, electrical, mechanical, and mezzanine rooms for critical infrastructure, office space, loading dock, and equipment storage. The design included 7,500 kW of critical IT power to the data hall, which was fed from 12kV main switchgear, new transformers and new UPS modules, new PDU’s and new distribution. HVAC is evaporative cooling plus supplemental direct expansion cooling. Design of hot aisle and cold aisle containment was also included. The construction included the complete building shell and a single 3MW POD with accommodations for expansion of the remaining 4.5MW.

ADOBE DATA CENTER (PHASE 2)

Hillsboro, OR

Type : Data Center Size : 100,000 SF

The firm provided full project management services for over 100,000 SF of mission critical data center infrastructure. This includes configuration of 5+1 block redundant electrical topology with RTU indirect evaporative cooling. Phase II expansion consists of 1.8Mw block and addition of supporting IDEC units, multiple UPS units and generator.

Made with FlippingBook - professional solution for displaying marketing and sales documents online