AlfaTech Big Book - Public Civic & Transportation

P UB L I C | C I V I C | T R AN S POR TAT I ON

CENTRAL SUBWAY San Francisco, CA

KOL SHOFAR SYNAGOGUE San Francisco, CA

SFO DRUG ENFORCEMENT AGENCY OFFICE San Francisco, CA

The Central Subway is an extension of the Muni Metro light rail system under construction in San Francisco, California, from the Caltrain commuter rail depot at 4th and King streets to Chinatown, with stops in South of Market (SoMa) and Union Square. Mechanical and plumbing design was provided for the Moscone substation, located below ground level.

Type: Synagogue Size: 52,000 SF

Type: Office Relocation Size: 2,400 SF

The synagogue includes the renovation of the existing buildings spanning 43,751 SF and construction of an additional 7,893 SF. Renovations include the main sanctuary, which was remodeled to enhance it’s aura of spirituality with better site lines, lighting and acoustics. The new multi-purpose room will be divisible into three discrete rooms or one large hall.

Mechanical, electrical & lighting engineering design, fire life safety and telecommunication services for the tenant improvement work for the Drug Enforcement Agency (DEA) Office Relocation Project located within Terminal 3 at the San Francisco International Airport (SFO). The tenant improvement (TI) encompasses the build out of 2,400 square feet at the west end of the ground floor of Terminal 3 at the San Francisco International Airport (SFO) for the Drug Enforcement Agency. The existing space included four individual rooms and exterior entry hall, which were combined into a single tenant space.

CAL IFORNIA DEPARTMENT OF CORRECTIONS AND REHABIL ITATION (CDCR) Stockton, CA

GOLDEN GATE VALLEY BRANCH L IBRARY San Francisco, CA

Type: Detention Facility Size: 220,000 SF

Type: Library Size: 7,432 SF

Provided MEP conceptual design for this campus facility with medical building, transitional housings, administration, vocational building and family visiting. Also included the design and implementation of a 30 kW photovoltaic system for the building.

The firm provided LEED Fundamental Commissioning for this 7,432 square foot historical library. Working with community stakeholders, the design & commissioning team restored and preserved the building's original Beaux Arts architecture including exterior terra cotta, arched windows, and interior shelving, while providing necessary seismic, life-safety, environmental and accessibility upgrades, and a new contemporary building addition.

WETA (WATER EMERGENCY TRANSPORTATION AUTHORITY) Alameda, CA

TERMINAL 1 EXPANSION, SAN FRANCISCO INTERNATIONAL AIRPORT (SFO) San Francisco, CA

Type: Operations & Maintenance Facility

In order to provide better emergency response to the San Francisco Bay Area, the Water Emergency Transportation Authority (WETA) is building an Operations and Maintenance Facility in addition to a Marine Facility in Alameda. The marine facility that will serve as the main base for WETA’s ferry fleet, administrative offices, Operations Control Center (OCC), and Emergency Operations Center.

Type: Expansion

Mechanical and sustainable design for the new expansion to the San Francisco International Terminal 1. Formerly known as the South Terminal, Terminal 1 consists of Boarding Area B (including gates 20-31, 32-32B, 33- 36) and Boarding Area C (gates 40-48).