AlfaTech Big Book: Public / Civic / Transportation

P U B L I C | C I V I C | T R A N S P O R TAT I O N

BERKELEY YMCA-PG&E TEEN CENTER

PRES IDIO ARCHAEOLOGY CENTER

MORGAN HILL MATH INSTITUTE

Berkeley, CA

San Francisco, CA

Morgan Hill, CA

Type: Community Center Size: 3-stories

Type: Historic Renovation Size: 4 buildings

Type: Math Institute Size: 177,570 SF

The new YMCA – PG&E Teen Center in downtown Berkeley reuses the shell of a bill collection center from 1964. The new three-story Teen Center is a vibrant space featuring a rooftop deck and is a great resource for the local youth.

This project consisted of an historic renovation of Buildings 44, 47, 48, and 49, for the Presidio of San Francisco. The buildings were retrofitted and upgraded to accommodate portions of the new Presidio Archaeology Center. In addition, the renovation of the historical Presidio Officer’s Club Building accommodates the Presidio Archaeology Center, historic Adobe Gallery, exhibit hall, and rehabilitated event spaces.

AlfaTech provided construction document designing for a new 177,570 SF Math Institute. The firm also provided mechanical, electrical, and plumbing engineering services for the new facility that included conference rooms, suites, specialty areas, and an auditorium.

COUNTY OF SANTA CLARA GOVERNMENT CENTER, EAST WING – PHASES I & II San Jose, CA

SANTA CLARA COUNTY OFF ICE OF EDUCATION / PARKWAY CHILD DEVELOPMENT CENTER San Jose, CA

OAKLAND FEDERAL BUILDING/ GENERAL SERVICES ADMINISTRATION Oakland, CA

Type: Site Lighting and ADA Upgrade Size: Various

Type: Various Size: 4,800 SF

Type: Government Size: 1,000,000 SF

The firm provided engineering design services for an ADA upgrade and surveyed the site for new walkway lighting to the adjacent Light Rail station.

The firm provided electrical and plumbing services for the remodel of approximately 4,800 SF of existing space in this county facility. The upgrades included new engineering systems for new modular units to accommodate the childcare center facilities.

This 17-story complex in downtown Oakland comprises two towers separated by a central courtyard and connected by a six-story high glass atrium and linked by a skybridge at the thirteenth and fourteenth floors. The firm provided engineering design services for the program’s 10,000 SF data center, office space, courtrooms, auditorium, childcare center, cafeteria, and parking garage. The project received the President’s Award, the highest award issued by the US government for design and process excellence.

COUNTY OF SANTA CLARA San Jose, CA

TRANSBAY DISTRICT San Francisco, CA

Type: Various Size: Various

Provided a planning-level feasibility study evaluating the use of Combined Heat and Power (CHP) in the Transbay District to provide power and more efficient heating and cooling of existing and planned buildings within the District.

AlfaTech provided service for various projects for the county of Santa Clara (not included in concurrent A/E services contract). These include electrical services for the power, fire alarm, security, PA and communication systems, emergency generator fuel tank replacement, and design of a new fire water storage tank.