AlfaTech Big Book: SoCal – Corporate Office

C O R P O R AT E O F F I C E

WELLS FARGO

350 W. Colorado, Pasadena, CA

Type: Office, Tenant Improvement Size: 84,000 SF

This Wells Fargo building is a premium Class-A office building and is located in Old Town Pasadena. The property consists of a 5-story office tower and 3-story, 275 stall parking garage. AlfaTech provided MEP design engineering for tenant improvements on floors 2, 3 and 4. The project was completed in five separate phases and comprised of private offices, boardroom, conference rooms, open office space, IDF rooms and storage.

ONE WEST BANK

Glendora, CA

Type: Retail/Corporate Size: 3,900 SF

One West Bank is a national bank with 70 retail branches in southern California and with approximately $12 billion in deposits. The project itself consisted of a ground up, new construction building on a 0.5 acre site at the corner of Grand and Route 66 in Glendora, CA. As the offices enjoyed great public sightlines, the engineering team worked carefully to ensure rooftop mechanical systems were hidden from view. Interior features include energy efficient lighting and color matched HVAC diffusers to seamlessly integrate into the aesthetic décor.

Made with FlippingBook - Online catalogs