AlfaTech BigBook

AlfaTech is a consulting engineering firm offering a range of complementary services and expertise in multiple markets. Our services include: Mechanical and Electrical Engineering Design, Technology, Architectural Lighting Design, Commissioning and Energy Solutions, as well as Sustainability.

INNOVATIVE IDEAS | INTEGRATED SOLUTIONS | SUSTAINABLE PARTNERS

01

OVERVIEW / Profile & Services

02

Sustainability

03

Markets & Relevant Projects

OVERVIEW 01

Profile & Services

P R O F I L E

AlfaTech has built its reputation on providing the most innovative and sustainable engineering solutions from master planning through construction administration. Our presence is not only California and Atlanta, but also internationally. Our clients include numerous large multi-national firms, many ongoing clients we’ve been serving for years. We strive to provide intelligent and innovative strategies starting with project inception, in order to provide maximum benefit to our clients during the entire development process whether it be new high-rise projects, mixed use projects or revitalization of existing communities. Our team provides the most appropriate engineering design solutions which are highly efficient and cost effective, and promotes the greatest possible return on investment for our clients. Our goal is to build the most dynamic relationships, be attentive to the needs of our clients and partners, and be true team players. With this mindset, we’ve built a stellar list of clients.

Uber, Mission Bay 1 & 2

Eventbrite

eBay

UNITED STATES San Francisco San Jose Los Angeles Atlanta

INTERNATIONAL Europe Asia Middle East Latin America Africa

AlfaTech RSBG Infrastructure Dorsch Gruppe Qvest Media SecurView

Additional Resources Through Our Sister Companies

100+ locations | 55+ countries | 3,600+ staff

S E R V I C E S

MECHANICAL ENGINEERING DESIGN HVAC

ARCHITECTURAL LIGHTING DESIGN Lighting and Lighting Controls Lighting Calculations

COMMISSIONING | ENERGY SOLUTIONS Early Quantifiable Energy Study Incentives

Heating Systems Water and Gas Cooling Systems / Chilled Water Dehumidification Systems Contamination Sensitive Areas Industrial Hygiene Systems Low Tolerance Temp Control Title 24 Analysis and Design Heat Recovery Systems Central Utility Plants Air Handlers HVAC System Controls PLC Programming Fire Protection and Plumbing

Customized ROI Calculations Sustainable Lighting Design

Energy Star® Assessments Retro-commissioning (RCx) Monitoring Brand Continuous Commissioning (MBCCx) ASHRAE Level 1, 2 and 3 Energy Audits Measurement and Verification (M&V) of installed projects Energy Modeling Net Zero Energy Budgeting HVAC/Chilled Water Plant Optimization

Energy Savings Analysis Custom Lighting Fixtures Design for finishes, fabrics and light sources

TECHNOLOGY DESIGN Low Voltage Design Security Design Audio Visual Design Wireless Design & Modeling

PROCESS Industrial Waste Collection Acid Neutralization Bio-Kill Waste System Process Waste Containment Ultra pure De-ionized Water Systems

Strategic Consulting Project Management Relocation & Migration

ELECTRICAL ENGINEERING DESIGN Power Systems

Emergency & Standby Power Lighting and Lighting Controls Security Systems 24 / 7 Power Systems (UPS) Power Monitoring Systems Toxic Gas Monitoring Graphic Control and Alarm Panels Grounding and Bonding

USP Water WFI Water Specialty Chemicals Chemical Storage

SUSTAINABILITY Sustainability Planning (Organizational and Infrastructural) LEED / Green Building Consulting Masterplanning Life Cycle Cost Assessment Occupant Wellness and Comfort

Lab and Special Gas Systems Ultra High Purity Gas Piping

Bulk & Specialty Gases Toxic Materials Handling Code Compliance Process Distribution Piping Process Cooling Water Medical Gas Medical Vacuum Waste Anesthetic Gas Disposal system (WAGD)

Energy Management Energy Conservation Fire Alarm Systems Public Address Systems Plug Loads Control

Façade Engineering CFD / Wind Studies Wind Studies Thermal Stratification Studies Energy Concept Studies

Dental Vacuum System Dental Water System

S E R V I C E S

GREEN BUILDING

SUSTAINABILITY

LIFE

MECHANICAL ENGINEERING DESIGN

ELECTRICAL ENGINEERING DESIGN

OF A BUILDING RETRO COMMISSIONING

ARCHITECTURAL LIGHTING

TECHNOLOGY

COMMISSIONING / ENERGY SOLUTIONS

CONSTRUCT I ON

OCCUPANCY

END OF USE

DES I GN

C L I E N T S

JDS Uniphase Corporation John Muir Medical Center Johnson & Johnson Johnson Controls JP Morgan Chase JRH Biosciences Juniper Networks Junipero Serra High School Kaiser HealthConnect Kaiser Permanente Kasowitz, Benson, et al

Novell Novellus Systems NVIDIA Ohlone Community College OptiSolar Oracle Orchard Properties Oread Pacific Bell PDL BioPharma PG&E Panattoni Europe Pfizer Philips Semiconductor Pitney Bowes Polycom Port of San Francisco Presidio Trust Price Waterhouse Coopers Qualcomm Queens Medical Center Rambus Raytheon Company

Scripps Memorial Hospital Sequoia Hospital CHW Sequoia UHSD Siemens SLAC National Accelerator Laboratory Solectron Corporation Sony America Spansion Sprint SRI International (Stanford Research) Stanford Healthcare & Clinics Stanford University Stanford University Medical Center

365 Main 3M Company AARP Abbott Biotherapeutics Abbott Laboratories Abbvie Abgenix Abt Associates ACCO Engineered Systems Adaptec AOC Adobe Systems Advanced Micro Devices Advantest America Advent Software Aetna Affymetrix Agilent Technologies Agnes Medical Center Akamai Technologies Alcoa Allen, Matkins, et al Alliance Bernstein, LLP Alta Bates Health System Altera Corporation Alum Rock School District Alza Amazon/Lab 126 Ambiance Associates Ambience Interiors Amdocs American Express Company Amgen Amprius

Bingham McCutchen, LLP Bio-Rad Laboratories BioGenex Biomarin Pharmaceutical BioMed Realty Trust Bloom Energy BMC Software Booz Allen Hamilton Inc

County of Sacramento County of San Mateo County of Santa Clara Credence CSAA

CSU Northridge Cupertino USD Daughters of Charity Health Dell Deloitte Consulting Digital Realty Trust Dignity Health Dominican Hospital Dropbox Dupont East Side Union HSD eBay Eil Lilly & Company Elsevier Inc Emirates National Oil Empire State Development Equinix Equis Corporation Ericsson Ernst & Young LLP Exelixis Ferrari Maserati of Silicon Valley Fidelity Investments Fireman’s Fund Insurance First Franklin Financial Corp Flextronics Foundry Networks Franklin Templeton Investments Genencor Genentech General Dynamics General Electric Genzyme Corporation Gilead Sciences Goldman Sachs Good Samaritan Hospital GSA Harbor UCLA Medical Center Hayward USD

Boston Properties Boston Scientific Bradford Schools Bristol-Myers Squibb Broadcom Broadreach Capital Partners Brocade Buck Institute Stem Cell Research Lab Cadence Design Systems Cal Pacific Med Center California Department of Mental Health CarrAmerica Development Cedars-Sinai Medical Center Chabot Las Positas CCD Charles Schwab Chevron Children’s Hospital, Los Angeles County Children’s Hospital, Oakland Children’s Hospital, Orange County Children’s Hospital, San Antonio Chinese Hospital Cisco Systems Citigroup Realty Services

Kimpton Hotels KLA-Tencor Corp La Clinica De La Raza

Stion Corporation Stryker Endoscopy Stubhub Sun Microsystems SunPower Sutter Health

Lam Research Laney College

Lawrence Berkeley Lab Letterman Digital Arts Levi Strauss & Company Linear Technology LinkedIn Lockheed Martin Corp Logitech Longs Drug Stores Los Gatos Saratoga HSD Lumentum Marriott International Martin Luther King, Jr. Community Hospital Marvell Semiconductor Maxim McKesson Medarex Menlo Park City School District Mercy Southwest Hospital Microsoft

Sybase Inc Symantec Synopsys Inc Sysorex T-Mobile Tencent Tesla Motors The Gap Twitter Uber UC Berkeley UC Davis UC Davis Medical Center UC San Francisco

Regional Medical Center Riverbed Technologies Robert Half International Roche Bioscience Ross Stores Sacramento Municipal Utility District Safeway Saint Francis Memorial Hospital Saint Joseph Hospital Saint Louise Regional Hospital Saint Mary’s Hospital Samaritan Medical Center Samsung San Francisco City Hall San Francisco International Airport San Francisco USD San Jose Medical Center San Jose Redevelopment Agency San Jose State University San Jose USD San Mateo CCCD San Mateo County Office of Education Sandia Laboratories Santa Clara County Health Dept. Santa Clara County Library Santa Clara County Office of Education Santa Clara USD Santa Clara University

City of Cupertino City of Foster City

UC Santa Cruz UC Los Angeles UCLA Outpatient Surgery/Oncology Center UCSF Mission Bay Medical Center Ultratech University of Colorado Hospital

City of Fremont City of Monterey City of Mountain View City of Newark City of Oakland City of Palo Alto City of Sacramento City of San Jose

Amstein + Walthert Anderson Architects Anixter Applied Dynamics Applied Materials Aradigm AT&T Park Clinic Atmel Corp Autodesk Avaya Avid Technology Avidex BAE Systems Bank of America Banuazizi Architects Bayer Healthcare Bechtel Corporation Bell, Rosenberg, et al Berryessa USD

Mills/Peninsula Hospital Mission Oaks Hospital Molecular Devices Monterey Peninsula College Morgan Hill USD Morgan Stanley Morrison & Foerster Motorola Mountain View School District MW Zander NASA-Ames National Semiconductor Network Appliance Nokia Nortel Networks North Bay Medical Center Northrop Grumman Novartis

University of Nevada University of Virginia URS Valley Medical Center Verisign Verity Health Verizon Communications Veteran’s Administration Visa International Vivus VMware Wachovia Bank

City of San Mateo City of Santa Clara City of Saratoga City of South San Francisco City of Sunnyvale College of Contra Costa College of Marin Colliers International Computer Associates Int’l Compuware CoreSite County of Monterey

Hewlett Packard Highland Hospital Hitachi America IBM Impax Laboratories Informatica Corporation Intel InterMune Intuit J&W Scientific

SAP Labs LLC Saratoga USD Savvis

Washington Hospital Xoma Therapeutics Yahoo

SUSTAINABILITY 02

S U S T A I N A B I L I T Y

At AlfaTech, we have a multidisciplinary team of experts to assess and design projects with a holistic approach. Working alongside owners, architects and other stakeholders, we examine every project in a comprehensive, systematic way to meet the client’s sustainability, energy, water and environmental quality goals. AlfaTech goes beyond engineering – our suite of energy, water and sustainability assessment services creates projects that benefit the bottom line. We provide expert studies in all qualitative aspects of the built environment such as day lighting, thermal comfort, advanced lighting control design, and technology integration.

We examine every project with a comprehensive systematic approach to meet the client’s sustainability, energy, water and environmental quality goals.

S U S T A I N A B I L I T Y

ADVANCED SIMULATIONS

We provide various advanced computer simulations to study wind patterns, thermal stratification and comfort issues in spaces, building façade studies and energy modeling to aid architects and owners make key decisions during the early stages of design.

Façade Engineering CFD/Wind Studies

• • • • •

Thermal Stratification Studies

Energy Concept Studies

Energy Modeling

S U S T A I N A B I L I T Y

CASE STUDY:

UBER MB 1 & 2 MISSION BAY HEADQUARTERS

San Francisco, CA

AlfaTech is currently involved in this Uber’s new San Francisco presence which is a new 420,000 square-foot, ground up office building in the Mission Bay area in San Francisco. Our scope of work includes mechanical, electrical, plumbing, technology, security, and sustainability services. AlfaTech assisted the architectural design team with optimizing performance by assessing various utility, façade and wind studies. The project is designed as an innovative, ultra- high performance building that includes a façade that responds to programmatic needs, an under floor air distribution system, a “winter garden” which acts as the main social space incorporating natural ventilation, and a proposed geothermal system to substantially reduce cooling equipment needs. AlfaTech has been providing MEP Engineering and Technology services for this client in the US and Globally for ten sites, including the new corporate headquarters in San Francisco. This is a state of the art new campus with over 420k SF of offices, a full kitchen and cafeteria. The project will include evaluation of all available sustainability features. Sustainability goals: • Significant reduction of building energy cooling needs by the use of geothermal exchange systems • Aggressive rainwater capture and retention • Natural ventilation for main atrium social areas, creating a pleasant, open experience for employees and visitors • Maximize use of day lighting to optimize workspace quality

S U S T A I N A B I L I T Y

CASE STUDY:

LENNAR CANDLESTI CK POINT & HUNTER’S POINT MASTER PLAN San Francisco, CA

The Candlestick Point and Hunter Point Shipyard is a 702-acre development that has the potential to bring most dynamic companies into the area and develop whole communities. This area will house R&D facilities, commercial spaces, multi- use buildings and retail spaces. Parks, trails, and open spaces will be additional features that will attract and enhance the community. The new development will add over 10,000 new residential units in the form of condominiums and low-, mid- and high-rise buildings. There will be over a million square feet of commercial space made available, over three million square feet for Research and Development, as well as over 300,000 square feet of property devoted to community activities. AlfaTech views this holistic approach to community development as an opportunity for Lennar Urban to be at the vanguard of urban design by creating a community infrastructure focused on environmental sustainability, technology, and self- sustaining. This means taking advantage of existing technologies to generate energy with the lowest environmental impact. We conducted a series of sustainable mechanical studies in a master plan scale to help the owners understand the options available to explore the feasibility of Net Zero energy for the new development. Proposed strategies involve:

Geothermal heat rejection systems

• High performance chillers and thermal energy storage • Biodigestion system for heat recovery and energy generation • Solar photovoltaic array for electricity generation • Rainwater and gray water capture and treatment

S U S T A I N A B I L I T Y

CASE STUDY:

DELTA PRODUCTS HEADQUARTERS Fremont, CA

Delta Products desired a new headquarters highlighting sustainability and energy efficiency with primary goals to showcase Delta Products’ innovation in a state of the art building blending the natural surroundings with sustainable building design. The Delta Americas Headquarters is a three-story 250,000 SF campus consisting of private offices, administrative, open workspace, conference/auditorium facilities, kitchen/dining areas, labs, office and warehouse. AlfaTech provided sustainable mechanical electrical plumbing engineering design services for this project focusing on the client’s desire to maximize natural ventilation and daylighting reduce water and energy consumption with a geothermal central plant and utilize radiant systems for primary space conditioning. AlfaTech conducted extensive CFD modeling to assist with sizing and locating windows around the building and their integration into a thermal tower ventilation strategy. The project also encompasses a photovoltaic system to balance energy consumption and achieve Net Zero Energy.

Some of the features included are:

Ecological ponds

• • •

Ground source heat pumps

• • • • • • •

EV chargers

Solar energy system Natural ventilation Active chilled beam

Rainwater harvesting

• Elevator power regeneration systems • Energy efficient HVAC system • Energy storage solutions • Hydronic bidirectional heating/cooling flooring systems

LED lighting

Spectrally selective glazing Grass and native plants

We believe making the world a better place is a responsibility we all share. And being able to do our part in the way we work is one of the best ways we can give back and have a positive effect on our environment. This means, not only do we always strive to provide the most sustainable solutions for our clients, but we are also always working on new, innovative and pioneering methods to bring sustainability to the next level, staying ahead of the curve in all types of projects in all the markets we serve.

Let’s leave the world a better place than we found it.

03 MARKETS

& Relevant Projects

ADI, Santa Clara, CA

CORPORATE OFFICE

C O R P O R AT E O F F I C E

UBER

AlfaTech has been providing comprehensive engineering design services for nearly 2M SF for Uber since 2014. This includes:

• MEP Design • Architectural lighting design • Architectural Lighting Design • Rainwater Collection System Design • PV and Fuel Cell Design • Technology (Security, IT and A/V) Design • Commissioning

UBER / MISSION BAY 1 & 2

San Francisco, CA

Type : New Site, Two High-Rise Office Buildings Size : 420,000 SF

AlfaTech provided comprehensive engineering and technology design for two new high-rise buildings for Uber’s new headquarters. AT provided design services for initial master planning and building design and then provided full design, MEP, Technology, PV and fuel cell system design for the full shell/core and tenant improvements. Scope included administrative office space, full kitchen/cafeteria, daycare and retail space.

Uber, Mission Bay 1 & 2

C O R P O R AT E O F F I C E

UBER / MISSION BAY 3 & 4

New Warriors Arena, San Francisco, CA

Type : New Site, Two High-Rise Office Buildings Size : 435,000 SF

AlfaTech provided comprehensive engineering and technology design for two new high-rise buildings for Uber’s new headquarters. AT provided design services for full design, MEP, Technology, and lighting system design for the tenant improvements. Scope included administrative office space, full kitchen/cafeteria, conference center and retail space.

C O R P O R AT E O F F I C E

UBER / 1455 MARKET STREET

San Francisco, CA

Type : High-Rise Office Tenant Improvements Size : 177,000 SF

AlfaTech provided mechanical, electrical and plumbing engineering design services and commissioning for Uber’s original headquarters in this downtown high-rise. This project encompassed five floors.

C O R P O R AT E O F F I C E

UBER / 555 MARKET STREET

San Francisco, CA

Type : High Rise Offices Size : 247,000 SF

AlfaTech provided mechanical, electrical, and plumbing engineering design services and commissioning for fifteen floors in this 21-story office building in downtown San Francisco. This project included administrative office space, breakout areas, kitchenettes and conference spaces.

UBER / 685 MARKET STREET

San Francisco, CA

Type : High Rise Offices Size : 154,000 SF

AlfaTech provided mechanical, electrical, and plumbing engineering design service and commissioning for seven floors of this downtown location. This included administrative office space, breakout areas, kitchenettes and conferencing space.

Uber, 555 Market Street

C O R P O R AT E O F F I C E

CONFIDENTIAL CLIENT

Confidential Location

Type : Campus Size : 18 acres

AlfaTech provided full MEP design services with LEED Administration for this confidential client. The project aims to achieve LEED Platinum as per the City’s requirements for tenant improvements to all buildings.

This campus consists of: three interconnected, six-story office buildings with two levels of podium parking on the ground totaling 752,100 SF; 25,000 SF cold core and shell café building; six-story parking garage; open and collaborative environment with furniture systems; private offices; software/light-hardware labs in buildings 1 and 2 totaling 36,000 SF; server room with cooling redundancy; fitness center and wellness center, 10,000 SF each, in office tower 1 on level 3.

C O R P O R AT E O F F I C E

LINKEDIN

San Francisco, CA

Type : High-Rise Office and mixed-use Size : 450,000 SF

AlfaTech provided mechanical, electrical and plumbing engineering services for this new ground-up project in the heart of SOMA in San Francisco. The project includes tenant improvements to the 26-story office building located at 222 Second Street.

LINKEDIN

Mountain View, CA

Type : Office Size : Approx. 575,000 SF Projects: ▪

Building B: 6 stories, 208,500 SF Building C: 6 stories, 208,500 SF Building D: 4 stories, 152,600 SF Campus Service Building: 5,000 SF

AlfaTech provided mechanical, electrical, plumbing engineering, and lighting design services in support of tenant improvements for three buildings and a campus service building

LinkedIn, San Francisco, CA

C O R P O R AT E O F F I C E

NEW RELIC

San Francisco, CA

Type: Office Size: 73,000 SF

AlfaTech provided MEP design services for this tenant improvement project. The redesign of floors 9, 10, 11 and 12 featured premium corporate office space in a 12- story building in downtown San Francisco. The project included: the remodel of open office areas; addition and modification of conference rooms; workstation densification; coffee bar modification with ventless equipment and outside vendor catering services; and investigation of the enlargement of the 10th floor assembly space.

C O R P O R AT E O F F I C E

DROPBOX

San Francisco, CA

Type: Office Size: 18,000 SF

AlfaTech provided MEP/FP engineering services for tenant improvements to this 18,000 SF office space in SoMa. This beautiful office has abundant natural light, glass walls around all private offices and conference rooms and is highlighted by open ceiling throughout. The office space includes work stations, meeting rooms, conference rooms and support areas.

C O R P O R AT E O F F I C E

EBAY

San Jose, CA

Type: Office, Data Center Size: 109,000 SF

AlfaTech provided full mechanical and electrical upgrades for eBay’s “North Campus” which is affiliated with the Corporate Headquarters facility also located in San Jose. The firm provided engineering design for interior improvements for two 109,000 SF buildings including a 6,000 SF data center and two server rooms for this Fortune 500 Firm.

EBAY / BUILDING 17 – LEED GOLD

San Jose, CA

Type: Campus Building Size: 189,590 SF

AlfaTech provided engineering design services for eBay’s newest North Campus 5- story Building 17 in San Jose. This included a new core and shell and tenant improvements. AlfaTech also prepared electrical infrastructure design for the installation of a roof- mounted 100kW photo-voltaic panel installation. Services included feeder and panel load calculations, code search, electrical plans and coordination with Owner, panel vendors and Contractor to integrate the PV panel system into the 5-story building’s electrical power distribution and grounding systems. This project achieved LEED Gold.

C O R P O R AT E O F F I C E

VISA / METRO 1, 2, & 3

Foster City, CA

Type: Offices Size: 349,000+ SF

AlfaTech completed multiple phases of renovations and interior improvements for the Metro One, Two and Three buildings on Visa’s campus, including several floors of office space, the Cafeteria and the Auditorium/Lobby. Services included mechanical, electrical and plumbing engineering, fire protection and construction administration .

VISA / 385 SHERMAN AVENUE – LEED GOLD

Palo Alto, CA

Type: Office Size: 51,000 SF

AlfaTech provided MEP services for this tenant improvement project. The 3-story, mixed use building which also include two subterranean parking levels. The project is LEED Gold certified.

Visa / Metro 1,2,3

C O R P O R AT E O F F I C E

ADVANCED MICRO DEVICES (AMD)

Sunnyvale, CA

Type: Corporate Campus: Offices, Data Center, Clean Rooms Size: 1,000,000+ SF

AlfaTech has been providing comprehensive engineering services for AMD for many years. Projects have consisted of new buildings and various renovations, including offices, clean rooms, data centers, and a new 50,000 SF Advance Commons Building. The Commons building, dedicated solely to conference, food service, dining and fitness activities, was the crowning touch in a long-term consolidation of AMD’s headquarters and Northern California research, development and manufacturing functions to one site. The facility contains an auditorium, cafeteria, fitness center, conference center, training rooms, company store, and a travel agency.

MAXIM INTEGRATED

San Jose, CA

Type: Corporate Campus, Relocation, Renovation Size: 430,000 SF

AlfaTech provided MEP, fire protection/life safety, and technology services, including telecommunications and security systems, to assist Maxim in relocating and renovating their headquarters campus which encompassed four buildings surrounding a large courtyard. Facilities included office, conference, administrative, auditoriums, and auxiliary space.

HEALTHCARE

H E A LT H C A R E

UCSF MEDICAL CENTER – LEED GOLD

San Francisco, CA

Type: Hospital Size: 869,000 SF

AlfaTech provided services for a new, $1.4 billion, 289-bed hospital located in the Mission Bay area of San Francisco. The facility includes a 183-bed children’s hospital, a 70-bed hospital for cancer patients, a women’s hospital, a central utility, underground tunnel, bridge, helipad, and parking. In addition, the project includes an outpatient building, energy center, support.

H E A LT H C A R E

SANTA CLARA VALLEY MEDICAL CENTER

Santa Clara, CA

Type: Medical Office Building Remodel; Skilled Nursing Facility & Psychiatric Facility; Master Plan and Survey Size: 120,000 SF / 14,000 SF

The firm performed mechanical and electrical engineering design services for this 3- story medical office building which included converting existing office space into medical exam rooms, patient treatment rooms, physical therapy suites and a new pharmacy. An AIDS/ICH treatment clinic was provided; complete with patient treatment "negative pressure" isolation rooms. Significant HVAC upgrades where required for the renovation. New power and telephone/data distribution throughout the entire building was required and new lighting for the upgraded areas. A new fire alarm system was specified and the corridors were upgraded to bring the building up to current code requirements. The 14,000 SF consists of a Feasibility Study of the existing Don Lowe Pavilion to evaluate the potential for this site to be converted.

H E A LT H C A R E

UC DAVIS MEDICAL CENTER

Sacramento, CA

Type: Radiology; Renovations Size: Radiology: 11,300 SF; Medical Center Tower: 72,000 SF Projects: • Radiology Expansion • Medical Center Tower II • Mechanical Infrastructure Analysis

The firm completed three separate projects for UC Davis Medical Center. Electrical design engineering for the conversion of a vacant medical records department to a new radiology suite; preparation of design criteria for the mechanical, electrical and fire protection systems for a new patient medical tower, and; infrastructure analysis of mechanical system in Clinical Lab and Research building.

H E A LT H C A R E

SAINT FRANCIS MEMORIAL HOSPITAL – BOTHIN BURN CENTER

San Francisco, CA

Type: Burn Center Size: 12-story hospital tower

AlfaTech provided engineering design services for several projects at Saint Francis Memorial Hospital, a 12-story, 323-bed hospital tower, located in San Francisco, CA. SFMH is also a Dignity Health network member. Projects included converting an entire floor into the Bothin Burn Center, providing new OR rooms, remodeled psychiatry wing and MRI rooms. Additionally the firm has performed steam boiler and medical gas upgrades, pre-op recovery area, lobby & nurse’s station remodel, refrigerator & freezer replacement and office renovations. The new Bothin Burn Center is a 15,500 SF, 16-bed, intensive care burn unit on the 5th floor of the hospital. Bothin Burn Center is the largest in northern California, treating over 500 burn victims each year. This isolation unit features an independent ventilating system, minimizes the risk of outside contamination and maintains strict room temperature and humidity control.

H E A LT H C A R E

SAINT FRANCIS MEMORIAL HOSPITAL – OPERATING ROOMS

San Francisco, CA

Type: Operating Rooms Size: 12-story hospital tower

AlfaTech provided engineering design services for several projects at Saint Francis Memorial Hospital, a 12-story, 323-bed hospital tower, located in San Francisco, CA. SFMH is also a Dignity Health network member.

Projects included converting an entire floor into the Bothin Burn Center, providing new OR rooms, remodeled psychiatry wing and MRI rooms.

Additionally the firm has performed steam boiler and medical gas upgrades, pre-op recovery area, lobby & nurse’s station remodel, refrigerator & freezer replacement and office renovations.

Saint Francis opens nine new and most advanced operating suites in San Francisco.

H E A LT H C A R E

KAISER PERMANENTE

Bay Area, CA

AlfaTech has been involved in many projects for Kaiser Permanente over the past 20 years. These projects have been for hospitals, as well as medical office buildings, and include modifications, alterations and upgrades for patient rooms, labs, pharmacies, specialty units, and more. These Kaiser locations include:

• Kaiser SSF, MOB Generator • Kaiser SSF, ETO Sterilizer • Kaiser SSF, MOB Generator

• Kaiser Redwood City, HealthConnect • Kaiser San Rafael, HealthConnect

• Kaiser Santa Clara • Kaiser Santa Teresa • Kaiser San Francisco

• Kaiser San Jose • Kaiser Daly City • Kaiser Antioch • Kaiser Oakland • Kaiser Richmond

Kaiser Medical Center, San Jose, CA

H E A LT H C A R E

KAISER HEALTH FOUNDATION

Oakland, CA

Type: Office, Laboratory, Radiology, Ultrasound; Master Plan & Survey Size: Medical Office Building, 120,000 SF, 5-story, 3900 Broadway, 30,000 SF Projects: • Medical Office Building • 3900 Broadway Offices & Labs • Ultrasound Equipment Installation Design • Building D Ultrasound Equipment Installation Design AlfaTech has completed numerous projects for Kaiser Health Foundation, providing engineering services for a new medical office building, a renovation to a historic landmark office building, and new ultrasound equipment installation design. The two ultrasound rooms required electrical design, power, lighting and signal design with an emphasis on RFI protection.

KAISER PERMANENTE

Santa Rosa, CA

Type: Addition to Existing Medical Facility Size: 350,000 SF

The firm performed mechanical, electrical and plumbing design services for the addition of a new air handling system to serve the labor delivery wing and operating rooms.

H E A LT H C A R E

STANFORD UNIVERSITY MEDICAL CENTER

Menlo Park, CA

Type: Medical Office Building

AlfaTech provided mechanical, electrical and plumbing engineering services for infrastructure upgrades to this medical office building, including: • Electrical Transformer Upgrade & Electrical Distribution • HVAC Upgrade (Unit replacement; not including distribution) • Fire Sprinkler Upgrade, including coordination with Civil Engineer to bring new Fire Services, riser assembly and stub-out for future tenants improvement (TI) services • Plumbing, including replacement of existing plumbing fixtures with new ADA type (where required) • ADA & other Life Safety upgrades as required for City approval, including Fire Alarm and Smoke Detection

LA CLINICA DE LA RAZA

Oakland, CA

Type: Patient Rooms, Treatment Rooms, Laboratory; Renovation Size: 40,000 SF

The facility contains patient examination and equipment/treatment rooms as well as laboratory space. AlfaTech provided mechanical and electrical design for this 3-story healthcare facility in downtown Oakland’s urban center. The program included patient rooms, laboratories, treatment rooms, medical faculty support programs a dental clinic, pharmacy and x-ray.

H E A LT H C A R E

MERCY SOUTHWEST HOSPITAL

Bakersfield, CA

Type: Hospital, Medical Office Building Size: 214,000 SF

This new replacement hospital won a design award from Modern Healthcare magazine. The firm provided engineering design services for this 112,000 SF family care center, a cardiac/cath lab, 44 acute care beds, 18 LDRP beds, 24 sub-acute beds, a 120-bed skilled nursing facility, 22 primary care beds, and two 30,000 SF medical office buildings.

ST. LOUISE REGIONAL HEALTH

Morgan Hill, CA

Type : Replacement Hospital Size : 80,000 SF, 50 beds

The firm provided engineering design services for this 80,000 SF stand-alone hospital.

H E A LT H C A R E

GOOD SAMARITAN HOSPITAL

Los Gatos and San Jose, CA

Type: Isolation, NICU, Skilled Nursing, Cardiac Cath Lab; Hospital Expansion, Master Plan and Survey Size : 520 beds

The firm performed systems analysis and recommended improvements for several projects at Good Samaritan Hospital. A complete infrastructure review and analysis was provided for the hospital mechanical, electrical, plumbing, and medical gas systems. Engineering documents for the proposed new NICU were reviewed for compatibility with the existing infrastructure, code compliance and constructability.

VETERAN’S ADMINISTRATION

Various Locations, CA

Type: Hospital, Clinic, Laboratory, Radiology Size: Various

AlfaTech has completed numerous projects for the Veterans Administration at sites throughout Northern California. These have ranged in size and scope from an 8,000 SF clinical lab renovation to an 180,000 SF primary care/ambulatory care center. Engineering services have included mechanical, electrical, plumbing, fire protection, and telecommunication systems design, as well as infrastructure analysis.

H E A LT H C A R E

SOUTHERN CALIFORNIA PROJECTS

As of August 1st, 2018, Levine/Seegel Associates (a full service MEP firm in Los Angeles) owners and their staff has joined AlfaTech and moved to the AlfaTech Los Angeles office. Below is a list of projects completed by Levine/ Seegel and the AlfaTech team.

• Shin Imaging Center, Fullerton, CA • Dr. Barrett Plastic Surgery, Beverly Hills, CA • Kaiser Medical Center, Sunset, Los Angeles, CA • Northeast Valley Health Corporation, San Fernando, CA • Glendale Adventist Medical Center, Glendale, CA • Riverside County Jail Medical Building, Riverside, CA • Asian Pacific Health Care Venture, Los Angeles, CA • Health South Rehabilitation Hospital, Bakersfield, CA • St. Joseph Hoag Hospital, Irvine, CA • Riverside Community Hospital, Riverside, CA • City of Hope – Wing One Renovation, Duarte, CA • Barstow Community Hospital, Barstow, CA • St. Joseph Hospital, Brea, CA • Presbyterian Intercommunity Hospital, Whittier, CA • Pomona Valley Hospital, Pomona, CA • 16 th Street Surgery & Oncology Center, Santa Monica, CA • Santa Monica Orthopedic Hospital, Santa Monica, CA

• Cedars-Sinai Medical Center, Los Angeles, CA • Kaiser Permanente South Bay Medical Center, Harbor City, CA • Los Angeles County Children’s Hospital, Los Angeles, CA • Centinela Hospital Medical Center, Inglewood, CA • Harbor UCLA Medical Center, Torrance, CA • LAC + USC Medical Center, Los Angeles, CA • Kaiser Fontana Hospital Replacement, Fontana, CA • Children Hospital Orange County, Orange, CA • Long Beach Memorial Medical Center, Long Beach, CA • Veterans Affairs Long Beach Health Care System, Long Beach, CA • Silverlake Medical Center, Los Angeles, CA • St. John Regional Medical Center, Oxnard, CA • Scripps Memorial Hospital, San Diego, CA • Martin Luther King Jr. Community Hospital, Los Angeles, CA • Westside Pain Specialist, Rancho Cucamonga, CA • Spin and Pain Institute, Irvine, CA • Valley Vascular Association, Santa Clarita, CA • Dr. Daneshrad, Santa Monica, CA

MIXED USE | RETAIL | HOSPITALITY

M I X E D U S E | R E TA I L | H O S P I TA L I T Y

BENTLY HERITAGE DISTILLERY

Minden, NV

MILL BUILDING Type: Manufacturing, Retail Size: 14,700 SF

Bently Heritage Distillery developed the Old Mill District into a state-of-the-art distillery for high grade whisky and spirits. The Mill Building, built in 1908, is the main production facility for fine whiskey.

The structure consists of four, 24’ diameter by 50’ high steel plate silos as well as a 3 stories/ loft/ low basement unreinforced brick masonry structure. The first floor of each distilling silos were conjoined by removing portions of the skin of each silo. Distilling equipment is arranged vertically to enable a gravity fed distilling process. The brick structure contains the private and public tastings rooms and retail spaces. Portions of the existing floors were removed to create multiple height spaces.

CREAMERY BUILDING Type: Manufacturing, Retail Size: 15,000 SF

Bently Heritage Distillery developed the Old Mill District into a state-of-the-art distillery for high grade whisky and spirits. The existing Creamery Building was demolished with the exception of the historic brick façade.

The new building has variable ceiling heights up to 34.5’ high. It houses a small public area, tasting rooms, restrooms, prep kitchen, and a second distillery operation for malting of grains, production of neutral spirits, storage and support functions, bottling, packaging and loading. The building responds to the various specific conditions required for the equipment it houses. A variety of conditions exist: open spaces with natural light and natural ventilation, enclosed high-fire hazard rooms, and tall spaces to house column-stills.

M I X E D U S E | R E TA I L | H O S P I TA L I T Y

AMEX CENTURION LOUNGE SFO International Airport Terminal 3 San Francisco, CA

Type : Hospitality Size : 7,000 SF

AMEX wanted a unique, high-end lounge to accommodate its exclusive members and to be a destination locale within the new international terminal at SFO.

AlfaTech provided mechanical, electrical and plumbing engineering, technology and security services for this high end 7,167 SF tenant improvement project, including kitchen, lounge and restrooms located in the Mezzanine level of Terminal 3.

This is a LEED Platinum project.

M I X E D U S E | R E TA I L | H O S P I TA L I T Y

HANAHAUS

Palo Alto, CA

Type : Co-working Office, Cafe Size : 13,000 SF

This historic reuse project transformed the two story Varsity Theater into a contemporary, efficient cafe and co-working space while preserving original architectural details. A new IDF room and associated new HVAC cooling only system was required as well as a kitchen with extensive warm and serve capabilities for the new café. The design included all new lighting, lighting controls and power and an extensive reconfiguration of the fire sprinkler and fire alarm system.

M I X E D U S E | R E TA I L | H O S P I TA L I T Y

WILLOW GLEN PLAZA

San Jose, CA

Type : Retail Size : 42,000 SF

The firm provided mechanical, electrical, and plumbing engineering services for this project, which consists of approximately 14,360 SF of retail space, and approximately 26,000 SF of offices space. The retail space includes a restaurant. The project was designed to a LEED Silver certification level. Part of the new construction occurred over an existing restaurant and the existing MEP services, including a kitchen hood exhaust needed to accommodate into the new construction.

FERRARI MASERATI OF SILICON VALLEY

Redwood City, CA

Type : Dealership Size : 23,000 SF

The firm provided mechanical, electrical, and plumbing engineering and technology design services for this 23,000 SF luxury car dealership.

M I X E D U S E | R E TA I L | H O S P I TA L I T Y

HUNTINGTON HOTEL / NOB HILL PROPERTIES

San Francisco, CA

Type : Hospitality Size : 10,000 SF

This Nob Hill landmark hotel provides 10,000 SF of health club facilities and treatment rooms for their guests.

Our services included full design services and new HVAC systems, electrical service and life safety systems.

RESORT AT SQUAW CREEK

Squaw Valley, CA

Type : Hospitality Size : 314,000 SF

AlfaTech provided design for a 640 acre, year round destination resort consisting of two mid-rise 314 unit residential building with 16,000 SF of conference facilities and 40,000 SF of shops, restaurants, and parking.

M I X E D U S E | R E TA I L | H O S P I TA L I T Y

W HOTEL

San Francisco, CA

Type : Hospitality Size : 33-stories

The firm provided MEP and Fire Life Safety systems inspection and commissioning on behalf of the City of San Francisco for this award winning 33-story, 428 room hotel at the Moscone Convention Center. Parking for this property is located below grade.

GRAND HYATT SAN FRANCISCO

San Francisco, CA

Type: Hotel Renovation Size: 36-stories

Mechanical, electrical, plumbing and sustainable design for the renovation of all guest rooms, conversion of the 36th floor restaurant into offices, creation of a new restaurant and lounge in the lobby and design of a new hotel spa.

M I X E D U S E | R E TA I L | H O S P I TA L I T Y

GRAND HYATT SANTA CLARA REGENCY CLUB

Santa Clara, CA

Type: Renovation Size: 550 rooms

Mechanical, electrical, and plumbing design as well as Title-24 energy compliance and consultation services for the Grand Hyatt Santa Clara’s expansion of the Regency Club. The project includes the Regency Club expansion and reconfiguration of the current space and expansion into an existing corridor. All of the guest rooms located on floors 3 through 14 will be renovated. There are approximately 50 rooms on each floor and 21 model room types.

HYATT FISHERMAN’S WHARF

San Francisco, CA

Type: Lighting Design

Provided specialty lighting design for the Main Lobby, Conference Lobby, Elevator Lobby and Front Desk remodel and lighting design services for the renovation of the existing fitness room and restroom facilities.

M I X E D U S E | R E TA I L | H O S P I TA L I T Y

BROADMOOR HOTEL

Colorado Springs, CO

Type : Hospitality

The firm provided the mechanical and electrical systems design for this $10 million luxury hotel. The project included a unique solution to the problem of energy cost and fuel availability. Additional projects for this complex included revisions to the entire electrical distribution system for the campus, the Broadmoor Golf Club, and the Equestrian Center.

BEAVERCREEK VILLAGE HALL

Vail, CO

Type : Hospitality Size : 144,000 SF

AlfaTech provided MEP design services for this project, consisting of a new multi- story, 144,000 SF building comprising residential condominium, recreation, and convention hall facilities at Beaver Creek Colorado Ski Resort.

M I X E D U S E | R E TA I L | H O S P I TA L I T Y

SPANISH BAY RESORT

Pebble Beach, CA

Type : Hospitality Size : 270 rooms

This 272,000 SF, 270-room resort hotel, including 80 condominium units is located on the Monterey Peninsula. A golf and tennis club are included on the 40-acre site. Includes fitness, common areas and restaurant facilities.

PORTLAND HILTON HOTEL

Portland, OR

Type : Hospitality

MEP services for public space renovations including podium facade enhancements of this high-rise hotel, new entry lobby and porte cochere, pool enclosure, meeting rooms, fitness center, and Pavilion Room demolition. Special features included a HVAC Systems Analysis which identified considerable cost savings by reusing existing cooling tower and optimizing existing systems. The renovation included a new 300-ton chiller and upgrade to central DDC controls.

RESIDENTIAL | MULTI-FAMILY

R E S I D E N T I A L | MU LT I - FAM I LY

119 7 TH STREET

San Francisco, CA

Type : Residential High Rise Size : 137,712 SF

AlfaTech provided mechanical, electrical, and plumbing design/build engineering services for this new, 12-story high-rise condominium tower.

The project is new construction with a target of 107 units, shared bicycle and car parking spaces at ground level. The overall gross square footage is 137,712.

This project will also be pursuing California Green Point Rating.

R E S I D E N T I A L | MU LT I - FAM I LY

1554-64 MARKET STREET

San Francisco, CA

Type : High-Rise Residential Facility Size : 12 Stories

The firm provided mechanical, electrical, plumbing and fire protection engineering, as well as Title 24 calculations, low voltage and security design services for this new construction 12-story high-rise residential condominium tower.

The facility has a target of 120 units, shared bicycle and car parking spaces at ground level.

R E S I D E N T I A L | MU LT I - FAM I LY

STATION CENTER FAMILY HOUSING

Union City, CA

Type: Residential and Mixed Use Size: 309,315 SF

The firm provided mechanical, plumbing, and fire protection engineering, as well as sustainable design for a 309,315 SF, six-story mixed-use residential development. The project will provide approximately 157 one, two, and three-bedroom units totaling approximately 148,998 SF. Additionally, the development will comprise of ground level flex commercial spaces, which could accommodate a café. Parking for residents and commercial spaces will be provided in a 103,005 SF parking structure.

The goal for the development is to be a low-energy building by beating Title-24 by 15%.

R E S I D E N T I A L | MU LT I - FAM I LY

119 7 TH STREET

San Francisco, CA

Type: Condominiums Size: 60,000 SF

AlfaTech provided mechanical, electrical, plumbing design-build engineering services for this condominium project located on 7 th street in the SoMa district. This 60,000 GSF mid-rise development is a modern 8-story building that will hold 39 condos. The project is located in San Francisco’s epicenter and is just a few blocks away from the high-level tech giants in the City. It is also near a host or urban amenities ranging from first class retail and dining to cultural and entertainment venues as well.

R E S I D E N T I A L | MU LT I - FAM I LY

38 DOLORES / 2001 MARKET

San Francisco, CA

Type : Residential Size : 81 units

The project formerly known as 2001 Market will feature 81 units and a 30,000 SF Whole Foods on the ground floor designed by world renowned architect William McDonough. The building is being touted as “the place for your urban lifestyle” with features like a green roof, on-site car share and bicycle parking.

The development is a model of a transit-oriented, mixed-use, sustainable development in conformance with the new Market & Octavia Neighborhood Plan.

HUNTER’S VIEW DEVELOPMENT

San Francisco, CA

Type : Residential Size : 276 units

Mechanical, plumbing engineering, and sustainable design for phase one of the revitalization of the 22-acre Hunters View site. All existing buildings will be demolished and replaced with 276 new public housing and market rate for-sale units. The goal of the development is to incorporate green strategies and technologies to support the health of the residents, energy efficiency, low water use and environmentally responsible material use. The development aims to achieve LEED Neighborhood Development (LEED-ND) certification.

K-12 EDUCATION

K - 1 2 E D U C AT I O N

CHRISTOPHER HIGH SCHOOL

Gilroy, CA

Type : New Construction Size : 140,000 SF

For the Gilroy Unified School District, the firm completed the full mechanical, electrical, and plumbing design for this new 140,000 SF high school.

The campus includes classrooms, a cafeteria, and a gym. The project which has achieved CHPS status, and Phase I of this project also received the Award of Excellence at the 2011 Leroy F. Greene Design and Planning Awards.

K - 1 2 E D U C AT I O N

SAN FRANCISCO UNIFIED SCHOOL DISTRICT

San Francisco, CA

Type: New Middle School Size: 70,000 SF

AlfaTech was provided mechanical, electrical, plumbing, technology and solar photovoltaic engineering design services for “bridging” design and related services for a new Willie L. Brown Jr. Middle School located at 2055 Silver Avenue in the Bay View District of San Francisco. The new approximately 70,000 SF middle school replaces an existing school site complex located at the same address that was demolished. The new facility was constructed under a Design-Build construction delivery method. AlfaTech provided MEP and Technology documents up to Design Development level in order to assist design-build contractors in preparing their engineered design build construction documents for DSA approval. The MEP/Technology design-build contractor will be the engineer of record.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT

San Francisco, CA

Type: New, Modernizations Projects: • Dianne Feinstein Elementary • DeAvila Elementary • JFK Elementary

Projects for the San Francisco School District have included new and modernizations, HVAC and Build Review projects.

Lincoln High School Willie L. Brown Jr. Middle School

Made with FlippingBook - Online magazine maker