AlfaTech Corporate Office Big Book

AlfaTech is a consulting engineering firm offering a range of complementary services and expertise in multiple markets. Our services include: Mechanical and Electrical Engineering Design, Technology, Architectural Lighting Design, Commissioning and Energy Solutions, as well as Sustainability.

INNOVATIVE IDEAS | INTEGRATED SOLUTIONS | SUSTAINABLE PARTNERS

01

OVERVIEW / Profile & Services

02

Sustainability

03

Markets & Relevant Projects

11.8.19

OVERVIEW 01

Profile & Services

P R O F I L E

AlfaTech has built its reputation on providing the most innovative and sustainable engineering solutions from master planning through construction administration. Our presence is not only California and Atlanta, but also internationally. Our clients include numerous large multi-national firms, many ongoing clients we’ve been serving for years. We strive to provide intelligent and innovative strategies starting with project inception, in order to provide maximum benefit to our clients during the entire development process whether it be new high-rise projects, mixed use projects or revitalization of existing communities. Our team provides the most appropriate engineering design solutions which are highly efficient and cost effective, and promotes the greatest possible return on investment for our clients. Our goal is to build the most dynamic relationships, be attentive to the needs of our clients and partners, and be true team players. With this mindset, we’ve built a stellar list of clients.

Uber, Mission Bay 1 & 2

Eventbrite

eBay

UNITED STATES San Francisco San Jose Los Angeles Atlanta

INTERNATIONAL Europe Asia Middle East Latin America Africa

Additional Resources Through Our Sister Companies

65+ locations | 30 countries | 6,000+ staff

S E R V I C E S

MECHANICAL ENGINEERING DESIGN HVAC

ARCHITECTURAL LIGHTING DESIGN Lighting and Lighting Controls Lighting Calculations

COMMISSIONING | ENERGY SOLUTIONS Early Quantifiable Energy Study Incentives

Heating Systems Water and Gas Cooling Systems / Chilled Water Dehumidification Systems Contamination Sensitive Areas Industrial Hygiene Systems Low Tolerance Temp Control Title 24 Analysis and Design Heat Recovery Systems Central Utility Plants Air Handlers HVAC System Controls PLC Programming Fire Protection and Plumbing

Customized ROI Calculations Sustainable Lighting Design

Energy Star® Assessments Retro-commissioning (RCx) Monitoring Brand Continuous Commissioning (MBCCx) ASHRAE Level 1, 2 and 3 Energy Audits Measurement and Verification (M&V) of installed projects Energy Modeling Net Zero Energy Budgeting HVAC/Chilled Water Plant Optimization

Energy Savings Analysis Custom Lighting Fixtures Design for finishes, fabrics and light sources

TECHNOLOGY DESIGN Low Voltage Design Security Design Audio Visual Design Wireless Design & Modeling

PROCESS Industrial Waste Collection Acid Neutralization Bio-Kill Waste System Process Waste Containment Ultra pure De-ionized Water Systems

Strategic Consulting Project Management Relocation & Migration

ELECTRICAL ENGINEERING DESIGN Power Systems

Emergency & Standby Power Lighting and Lighting Controls Security Systems 24 / 7 Power Systems (UPS) Power Monitoring Systems Toxic Gas Monitoring Graphic Control and Alarm Panels Grounding and Bonding

USP Water WFI Water Specialty Chemicals Chemical Storage

SUSTAINABILITY Sustainability Planning (Organizational and Infrastructural) LEED / Green Building Consulting Masterplanning Life Cycle Cost Assessment Occupant Wellness and Comfort

Lab and Special Gas Systems Ultra High Purity Gas Piping

Bulk & Specialty Gases Toxic Materials Handling Code Compliance Process Distribution Piping Process Cooling Water Medical Gas Medical Vacuum Waste Anesthetic Gas Disposal system (WAGD)

Energy Management Energy Conservation Fire Alarm Systems Public Address Systems Plug Loads Control

Façade Engineering CFD / Wind Studies Wind Studies Thermal Stratification Studies Energy Concept Studies

Dental Vacuum System Dental Water System

S E R V I C E S

GREEN BUILDING

SUSTAINABILITY

LIFE

MECHANICAL ENGINEERING DESIGN

ELECTRICAL ENGINEERING DESIGN

OF A BUILDING RETRO COMMISSIONING

ARCHITECTURAL LIGHTING

TECHNOLOGY

COMMISSIONING / ENERGY SOLUTIONS

CONSTRUCT I ON

OCCUPANCY

END OF USE

DES I GN

C L I E N T S

JDS Uniphase Corporation John Muir Medical Center Johnson & Johnson Johnson Controls JP Morgan Chase JRH Biosciences Juniper Networks Junipero Serra High School Kaiser HealthConnect Kaiser Permanente Kasowitz, Benson, et al

Novell Novellus Systems NVIDIA Ohlone Community College OptiSolar Oracle Orchard Properties Oread Pacific Bell PDL BioPharma PG&E Panattoni Europe Pfizer Philips Semiconductor Pitney Bowes Polycom Port of San Francisco Presidio Trust Price Waterhouse Coopers Qualcomm Queens Medical Center Rambus Raytheon Company

Scripps Memorial Hospital Sequoia Hospital CHW Sequoia UHSD Siemens SLAC National Accelerator Laboratory Solectron Corporation Sony America Spansion Sprint SRI International (Stanford Research) Stanford Healthcare & Clinics Stanford University Stanford University Medical Center

365 Main 3M Company AARP Abbott Biotherapeutics Abbott Laboratories Abbvie Abgenix Abt Associates ACCO Engineered Systems Adaptec AOC Adobe Systems Advanced Micro Devices Advantest America Advent Software Aetna Affymetrix Agilent Technologies Agnes Medical Center Akamai Technologies Alcoa Allen, Matkins, et al Alliance Bernstein, LLP Alta Bates Health System Altera Corporation Alum Rock School District Alza Amazon/Lab 126 Ambiance Associates Ambience Interiors Amdocs American Express Company Amgen Amprius

Bingham McCutchen, LLP Bio-Rad Laboratories BioGenex Biomarin Pharmaceutical BioMed Realty Trust Bloom Energy BMC Software Booz Allen Hamilton Inc

County of Sacramento County of San Mateo County of Santa Clara Credence CSAA

CSU Northridge Cupertino USD Daughters of Charity Health Dell Deloitte Consulting Digital Realty Trust Dignity Health Dominican Hospital Dropbox Dupont East Side Union HSD eBay Eil Lilly & Company Elsevier Inc Emirates National Oil Empire State Development Equinix Equis Corporation Ericsson Ernst & Young LLP Exelixis Ferrari Maserati of Silicon Valley Fidelity Investments Fireman’s Fund Insurance First Franklin Financial Corp Flextronics Foundry Networks Franklin Templeton Investments Genencor Genentech General Dynamics General Electric Genzyme Corporation Gilead Sciences Goldman Sachs Good Samaritan Hospital GSA Harbor UCLA Medical Center Hayward USD

Boston Properties Boston Scientific Bradford Schools Bristol-Myers Squibb Broadcom Broadreach Capital Partners Brocade Buck Institute Stem Cell Research Lab Cadence Design Systems Cal Pacific Med Center California Department of Mental Health CarrAmerica Development Cedars-Sinai Medical Center Chabot Las Positas CCD Charles Schwab Chevron Children’s Hospital, Los Angeles County Children’s Hospital, Oakland Children’s Hospital, Orange County Children’s Hospital, San Antonio Chinese Hospital Cisco Systems Citigroup Realty Services

Kimpton Hotels KLA-Tencor Corp La Clinica De La Raza

Stion Corporation Stryker Endoscopy Stubhub Sun Microsystems SunPower Sutter Health

Lam Research Laney College

Lawrence Berkeley Lab Letterman Digital Arts Levi Strauss & Company Linear Technology LinkedIn Lockheed Martin Corp Logitech Longs Drug Stores Los Gatos Saratoga HSD Lumentum Marriott International Martin Luther King, Jr. Community Hospital Marvell Semiconductor Maxim McKesson Medarex Menlo Park City School District Mercy Southwest Hospital Microsoft

Sybase Inc Symantec Synopsys Inc Sysorex T-Mobile Tencent Tesla Motors The Gap Twitter Uber UC Berkeley UC Davis UC Davis Medical Center UC San Francisco

Regional Medical Center Riverbed Technologies Robert Half International Roche Bioscience Ross Stores Sacramento Municipal Utility District Safeway Saint Francis Memorial Hospital Saint Joseph Hospital Saint Louise Regional Hospital Saint Mary’s Hospital Samaritan Medical Center Samsung San Francisco City Hall San Francisco International Airport San Francisco USD San Jose Medical Center San Jose Redevelopment Agency San Jose State University San Jose USD San Mateo CCCD San Mateo County Office of Education Sandia Laboratories Santa Clara County Health Dept. Santa Clara County Library Santa Clara County Office of Education Santa Clara USD Santa Clara University

City of Cupertino City of Foster City

UC Santa Cruz UC Los Angeles UCLA Outpatient Surgery/Oncology Center UCSF Mission Bay Medical Center Ultratech University of Colorado Hospital

City of Fremont City of Monterey City of Mountain View City of Newark City of Oakland City of Palo Alto City of Sacramento City of San Jose

Amstein + Walthert Anderson Architects Anixter Applied Dynamics Applied Materials Aradigm AT&T Park Clinic Atmel Corp Autodesk Avaya Avid Technology Avidex BAE Systems Bank of America Banuazizi Architects Bayer Healthcare Bechtel Corporation Bell, Rosenberg, et al Berryessa USD

Mills/Peninsula Hospital Mission Oaks Hospital Molecular Devices Monterey Peninsula College Morgan Hill USD Morgan Stanley Morrison & Foerster Motorola Mountain View School District MW Zander NASA-Ames National Semiconductor Network Appliance Nokia Nortel Networks North Bay Medical Center Northrop Grumman Novartis

University of Nevada University of Virginia URS Valley Medical Center Verisign Verity Health Verizon Communications Veteran’s Administration Visa International Vivus VMware Wachovia Bank

City of San Mateo City of Santa Clara City of Saratoga City of South San Francisco City of Sunnyvale College of Contra Costa College of Marin Colliers International Computer Associates Int’l Compuware CoreSite County of Monterey

Hewlett Packard Highland Hospital Hitachi America IBM Impax Laboratories Informatica Corporation Intel InterMune Intuit J&W Scientific

SAP Labs LLC Saratoga USD Savvis

Washington Hospital Xoma Therapeutics Yahoo

SUSTAINABILITY 02

S U S T A I N A B I L I T Y

At AlfaTech, we have a multidisciplinary team of experts to assess and design projects with a holistic approach. Working alongside owners, architects and other stakeholders, we examine every project in a comprehensive, systematic way to meet the client’s sustainability, energy, water and environmental quality goals. AlfaTech goes beyond engineering – our suite of energy, water and sustainability assessment services creates projects that benefit the bottom line. We provide expert studies in all qualitative aspects of the built environment such as day lighting, thermal comfort, advanced lighting control design, and technology integration.

We examine every project with a comprehensive systematic approach to meet the client’s sustainability, energy, water and environmental quality goals.

S U S T A I N A B I L I T Y

ADVANCED SIMULATIONS

We provide various advanced computer simulations to study wind patterns, thermal stratification and comfort issues in spaces, building façade studies and energy modeling to aid architects and owners make key decisions during the early stages of design.

Façade Engineering CFD/Wind Studies

• • • • •

Thermal Stratification Studies

Energy Concept Studies

Energy Modeling

S U S T A I N A B I L I T Y

CASE STUDY:

UBER MB 1 & 2 MISSION BAY HEADQUARTERS

San Francisco, CA

AlfaTech is currently involved in this Uber’s new San Francisco presence which is a new 420,000 square-foot, ground up office building in the Mission Bay area in San Francisco. Our scope of work includes mechanical, electrical, plumbing, technology, security, and sustainability services. AlfaTech assisted the architectural design team with optimizing performance by assessing various utility, façade and wind studies. The project is designed as an innovative, ultra- high performance building that includes a façade that responds to programmatic needs, an under floor air distribution system, a “winter garden” which acts as the main social space incorporating natural ventilation, and a proposed geothermal system to substantially reduce cooling equipment needs. AlfaTech has been providing MEP Engineering and Technology services for this client in the US and Globally for ten sites, including the new corporate headquarters in San Francisco. This is a state of the art new campus with over 420k SF of offices, a full kitchen and cafeteria. The project will include evaluation of all available sustainability features. Sustainability goals: • Significant reduction of building energy cooling needs by the use of geothermal exchange systems • Aggressive rainwater capture and retention • Natural ventilation for main atrium social areas, creating a pleasant, open experience for employees and visitors • Maximize use of day lighting to optimize workspace quality

S U S T A I N A B I L I T Y

CASE STUDY:

LENNAR CANDLESTI CK POINT & HUNTER’S POINT MASTER PLAN San Francisco, CA

The Candlestick Point and Hunter Point Shipyard is a 702-acre development that has the potential to bring most dynamic companies into the area and develop whole communities. This area will house R&D facilities, commercial spaces, multi- use buildings and retail spaces. Parks, trails, and open spaces will be additional features that will attract and enhance the community. The new development will add over 10,000 new residential units in the form of condominiums and low-, mid- and high-rise buildings. There will be over a million square feet of commercial space made available, over three million square feet for Research and Development, as well as over 300,000 square feet of property devoted to community activities. AlfaTech views this holistic approach to community development as an opportunity for Lennar Urban to be at the vanguard of urban design by creating a community infrastructure focused on environmental sustainability, technology, and self- sustaining. This means taking advantage of existing technologies to generate energy with the lowest environmental impact. We conducted a series of sustainable mechanical studies in a master plan scale to help the owners understand the options available to explore the feasibility of Net Zero energy for the new development. Proposed strategies involve:

Geothermal heat rejection systems

• High performance chillers and thermal energy storage • Biodigestion system for heat recovery and energy generation • Solar photovoltaic array for electricity generation • Rainwater and gray water capture and treatment

S U S T A I N A B I L I T Y

CASE STUDY:

DELTA PRODUCTS HEADQUARTERS Fremont, CA

Delta Products desired a new headquarters highlighting sustainability and energy efficiency with primary goals to showcase Delta Products’ innovation in a state of the art building blending the natural surroundings with sustainable building design. The Delta Americas Headquarters is a three-story 250,000 SF campus consisting of private offices, administrative, open workspace, conference/auditorium facilities, kitchen/dining areas, labs, office and warehouse. AlfaTech provided sustainable mechanical electrical plumbing engineering design services for this project focusing on the client’s desire to maximize natural ventilation and daylighting reduce water and energy consumption with a geothermal central plant and utilize radiant systems for primary space conditioning. AlfaTech conducted extensive CFD modeling to assist with sizing and locating windows around the building and their integration into a thermal tower ventilation strategy. The project also encompasses a photovoltaic system to balance energy consumption and achieve Net Zero Energy.

Some of the features included are:

Ecological ponds

• • •

Ground source heat pumps

• • • • • • •

EV chargers

Solar energy system Natural ventilation Active chilled beam

Rainwater harvesting

• Elevator power regeneration systems • Energy efficient HVAC system • Energy storage solutions • Hydronic bidirectional heating/cooling flooring systems

LED lighting

Spectrally selective glazing Grass and native plants

We believe making the world a better place is a responsibility we all share. And being able to do our part in the way we work is one of the best ways we can give back and have a positive effect on our environment. This means, not only do we always strive to provide the most sustainable solutions for our clients, but we are also always working on new, innovative and pioneering methods to bring sustainability to the next level, staying ahead of the curve in all types of projects in all the markets we serve.

Let’s leave the world a better place than we found it.

03 MARKETS

& Relevant Projects

ADI, Santa Clara, CA

CORPORATE OFFICE

C O R P O R AT E O F F I C E

UBER / MISSION BAY 1 & 2 LEED PLATINUM, WELL GOLD

San Francisco, CA

Type: New Site, Two High-Rise Office Buildings Size: 420,000 SF

AlfaTech is currently involved in Uber’s innovative new San Francisco headquarters which is a ground up office building in the Mission Bay district. AlfaTech provided design/bid/build style Mechanical, Electrical, and Plumbing (MEP) engineering, lighting design, and Technology (low voltage, security, audio/visual) services, throughout the entire project. AlfaTech is part of the construction administration effort and served as the engineer-of-record for mechanical and electrical installations. AlfaTech assisted the architectural design team with optimizing performance by assessing various utility, façade and wind studies. Life-cycle cost analysis, energy benchmarking, and computational fluid dynamics were critical tools to inform the design effort. The project is designed as an innovative, ultra-high performance building that focuses on an occupant-centric workplace and includes an elaborate IT infrastructure, a façade that responds to programmatic needs, an under floor air distribution system, a two-building atria system incorporating natural ventilation, and a central treatment system for collecting graywater and rainwater. The interactions between the occupants, the buildings, and the ambient, were at the heart of the architectural and engineering systems; targeting lower environmental metrics of 1,100,000 kWh in reduced energy use and 2,100,000 gallons in reduced water use. The buildings' eco-friendly features consisted of: • Two passively conditioned, interconnected atria • Shaded facade with automated natural ventilation • Chilled sails and occupant-controlled underfloor air-distribution systems • High-performance LED lighting with an occupancy driven network-based lighting control • Graywater reuse and rainwater catchment systems • Integrated building automation, controls and management platforms • Full air-side and water-side economizing • Fuel cells redundantly powering building network operations • Urban garden • Solar domestic hot water system • PV-ready electrical system

Awarded Saving by Design Incentive

C O R P O R AT E O F F I C E

UBER / MISSION BAY 3 & 4

New Warriors Arena, San Francisco, CA

Type : New Site, Two High-Rise Office Buildings Size : 435,000 SF

AlfaTech provided comprehensive engineering and technology design for two new high-rise buildings for Uber’s new headquarters. AT provided design services for full design, MEP, Technology, and lighting system design for the tenant improvements. Scope included administrative office space, full kitchen/cafeteria, conference center and retail space.

C O R P O R AT E O F F I C E

UBER / 1455 MARKET STREET San Francisco, CA

Type : High-Rise Office Tenant Improvements Size : 177,000 SF

AlfaTech provided mechanical, electrical and plumbing engineering design services and commissioning for Uber’s original headquarters in this downtown high-rise. This project encompassed five floors.

UBER / 555 MARKET STREET San Francisco, CA

Type : High Rise Offices Size : 247,000 SF

AlfaTech provided mechanical, electrical, and plumbing engineering design services and commissioning for fifteen floors in this 21-story office building in downtown San Francisco. This project included administrative office space, breakout areas, kitchenettes and conference spaces.

UBER / 685 MARKET STREET

San Francisco, CA

Type : High Rise Offices Size : 154,000 SF

AlfaTech provided mechanical, electrical, and plumbing engineering design service and commissioning for seven floors of this downtown location. This included administrative office space, breakout areas, kitchenettes and conferencing space.

C O R P O R AT E O F F I C E

CONFIDENTIAL CLIENT | GM

345 Spear Street, San Francisco, CA

Type: Tenant Improvement Size: 89,000 SF

MEP services for new 89,000 SF office space on one single floor plate to house this client’s first San Francisco presence. AlfaTech provided MEP Bid Documents and subsequent review of the MEP Design-Build Subcontractors’ Permit and Construction Drawings. This project consists of the 6th floor build out, including new 64,000 SF café, remodel of another 8,000 SF Café and 5th floor remodel. This project included video conference rooms, creative break-out spaces, lunch/break areas, and server room.

CONFIDENTIAL CLIENT | GM

Various Locations

Providing ongoing services for world’s largest search engine company. More than 25 projects in the last 7 years. Provided MEP services for client’s first presence in San Francisco on 385 Spear Street.

Current Projects: • 620 National

• 237 Moffett Park Drive • Moffett Gateway • 2598 Bayshore • 475 Ellis Emulation Labs • 1255 Pear Avenue • Two Rincon • 1625 Plymouth

• 999 Bayhill • 1111 Bayhill • Crittenden Lane Campus

• Brokaw Campus • 1225 Charleston • 1098 Alta

C O R P O R AT E O F F I C E

CONFIDENTIAL CLIENT | AC

Confidential Location

Type : Campus Size : 752,000 SF, 18 acres

AlfaTech has provided full MEP design services with LEED Administration for this confidential client. The project achieved LEED Platinum as per the City of Sunnyvale’s requirements for tenant improvements to all buildings. The project awarded design incentives provided by saving by design. This campus consists of: three interconnected, six-story office buildings with two levels of podium parking on the ground totaling 752,100 SF; 25,000 SF cold core and shell café building with full service commercial kitchen with variable flow system; six-story parking garage; open and collaborative environment with furniture systems; private offices; software/light-hardware labs in buildings 1 and 2 totaling 36,000 SF; server room with cooling redundancy; fitness center and wellness center, 10,000 SF each, in office tower 1 on level 3.

Awarded Saving by Design Incentive

C O R P O R AT E O F F I C E

LINKEDIN

San Francisco, CA

Type : High-Rise Office and mixed-use Size : 450,000 SF

AlfaTech provided mechanical, electrical and plumbing engineering services for this new ground-up project in the heart of SOMA in San Francisco. The project includes tenant improvements to the 26-story office building located at 222 Second Street.

LINKEDIN

Mountain View, CA

Type : Office Size : Approx. 575,000 SF Projects: ▪

Building B: 6 stories, 208,500 SF Building C: 6 stories, 208,500 SF Building D: 4 stories, 152,600 SF Campus Service Building: 5,000 SF

AlfaTech provided mechanical, electrical, plumbing engineering, and lighting design services in support of tenant improvements for three buildings and a campus service building

LinkedIn, San Francisco, CA

C O R P O R AT E O F F I C E

LINKEDIN

New York, NY

Type : Office Size : Approx. 80,000 SF

AlfaTech is providing full design for all technology infrastructure, including structured cabling, and AV systems. Facilities included training rooms, all-hands and various sized meeting spaces, and videoconference rooms. Responsibilities included full coordination with the design team, development of technology plans and specifications, facilitation of the bidding process for low voltage and AV sub- contractors and support during construction. AlfaTech developed and continues to maintain the technology standards for LinkedIn that have been used for this and many other projects globally.

LINKEDIN

Sunnyvale, CA

Type : Office Size : 576,000 SF

AlfaTech provided mechanical, electrical, plumbing engineering and lighting design services for this new ground-up campus including full cafeteria and multipurpose facility.

LinkedIn, New York, NY

C O R P O R AT E O F F I C E

NEW RELIC

San Francisco, CA

Type: Office Size: 73,000 SF

AlfaTech provided MEP design services for this tenant improvement project. The redesign of floors 9, 10, 11 and 12 featured premium corporate office space in a 12- story building in downtown San Francisco. The project included: the remodel of open office areas; addition and modification of conference rooms; workstation densification; coffee bar modification with ventless equipment and outside vendor catering services; and investigation of the enlargement of the 10th floor assembly space.

C O R P O R AT E O F F I C E

OKTA

San Jose, CA

Type : Office Size : 200,700 SF

AlfaTech provided MEP design engineering and Technology services for this high- rise office TI project. Phase 1 of included the 14th floor for a total of 18,544 SF of open office workstations, meeting rooms, conferences, IT rooms and support areas. Phase 2 encompassed floors 4 through 11 and the 15th floor for a total of 182,156 SF. The space including open office workstations, meeting rooms, conferences, IT rooms and support areas. Technology design services consisted of the 5th floor for a total of 20,000 SF of tenant improvements.

C O R P O R AT E O F F I C E

UPTOWN STATION

Oakland, CA

Type : High-Rise Office Building Size : 520,000 SF

AlfaTech provided MEP and Technology Engineering Services for this high-rise building in center of the city. AlfaTech provided full design services for site, shell/core and tenant improvements of standard office space including private and open offices, conference rooms, huddle rooms, telephone rooms, break rooms, training spaces and other support spaces and a central chiller plant and 12kv high voltage power distribution. The First Basement included a variety of garage, large conference/training spaces, labs and potentially a cafeteria, along with utility spaces for electrical distribution. The two lower basements will be used for utility equipment such as fire pumps, boilers, and similar equipment.

C O R P O R AT E O F F I C E

ADI

Santa Clara, CA

Type : Office Size : 356,000 SF

Analog Devices (ADI) relocated its corporate headquarters into two recently completed warm shell buildings in Santa Clara Square. AlfaTech provided MEP design services for this 356,000 SF project encompassing nine of the twelve floors.

The flexible 280,000 SF office space accommodates 950 seats as well as amenities, various lab and specialty program spaces including: 40,000 SF of light electronic labs; 10,000 SF electronic test lab with Class 100,000 clean room; 700 SF of wet labs; 1,200 SF data center; 11,000 SF customer experience center; an executive board room; logistics/shipping/receiving area; and a raised style 60 person auditorium.

C O R P O R AT E O F F I C E

RELATED

Santa Clara, CA

Type: Office Size: 5,000 SF

Related, a renowned and prolific real estate development firms, partnered with the City of Santa Clara to create a LEED-certified, mixed-use destination adjacent to Levi’s Stadium. AlfaTech provided MEP, fire protection, and technology services for this tenant improvement project for Related’s local marketing office which overlooks the new development site. The contemporary space is designed to be impactful for potential tenants, with high ceilings, exposed spiral ductwork and eye-catching features.

C O R P O R AT E O F F I C E

MOLEX

Fremont, CA

Type: Office, Lab, Warehouse Size: 108,600 SF

Molex, a subsidiary of Koch Industries, acquired a 108,600 SF building consisting of office, lab, and warehouse space at 46360 Fremont Blvd. The building was built in 1983 and was in need of updates to the interior as well as exterior façade. AlfaTech provided mechanical, electrical, plumbing, and fire protection engineering services for this extensive tenant improvement project. The transformed space now clearly represents this progressive and innovative high tech company. The project consisted of an open collaborative environment, conference and training rooms, lunch room, fitness center, patio and sport court, clean rooms, pilot line, dry lab and warehouse areas.

C O R P O R AT E O F F I C E

CONFIDENTIAL CLIENT | AM

Sunnyvale, CA

Type : Office Size : 224,490 GSF

AlfaTech provided MEP design services for the world’s largest e-commerce company’s Moffett Towers location. The tenant improvement project encompassed the entire 8-stories of an existing building. The project scope included upgrades to the 1st floor café, open area workstations, private offices, breakout areas, kitchenettes, and conference rooms. The project also included a primary IDF room on one floor, one IDF room on each remaining floor, and one full floor of R&D labs.

C O R P O R AT E O F F I C E

DROPBOX

San Francisco, CA

Type: Office Size: 18,000 SF

AlfaTech provided MEP/FP engineering services for tenant improvements to this 18,000 SF office space in SoMa. This beautiful office has abundant natural light, glass walls around all private offices and conference rooms and is highlighted by open ceiling throughout. The office space includes work stations, meeting rooms, conference rooms and support areas.

C O R P O R AT E O F F I C E

PLAYGROUND GLOBAL

Palo Alto, CA

Type: Office Size: 70,000 SF

AlfaTech provided MEP/FP engineering services for tenant improvements to the 70,000 SF space, which required expansion to house R&D labs, office space, open work plan and hoteling space, as well as specialized meeting and private spaces for employees. The original building consisted of an existing 4-bay single story high-bay warehouse, which is now converted into this office.

C O R P O R AT E O F F I C E

CISCO

San Jose, Milpitas, Santa Clara, CA, Texas & Amsterdam

Type: Office, R&D, Manufacturing Size: 6.3 M+ SF

Site 1: 850,000 SF, eight buildings Site 2: 600,000 SF, four buildings Site 3: 315,000 SF, three buildings Site 4: 3.3 million SF, nineteen buildings Site 5: 1.2 million SF, five buildings

Cisco selected AlfaTech to provide engineering design services for all five sites comprising their world headquarters campus. These buildings, which range from one to four stories, contain a variety of space types, including data center, office, research and development, engineering labs and testing areas, manufacturing, cafeteria, conference, executive briefing, and a fitness center. The firm has been involved with Cisco both nationally and internationally on projects during various stages of engineering services. A substantial PG&E energy rebate resulted from our energy-saving mechanical systems designs, the project also won a separate energy award. Site 1 has a manufacturing plant, and a main engineering and MIS data center. Site 2's data center supports Cisco’s seven day/twenty-four hour online corporate network connectivity, and the infrastructure was designed to support future engineering lab and bench functions. Site 3 buildings required stringent control of temperature and humidity. For Site 4, the firm also performed studies for site utility alternatives including cogeneration.

C O R P O R AT E O F F I C E

EBAY

San Jose, CA

Type: Office, Data Center Size: 109,000 SF

AlfaTech provided full mechanical and electrical upgrades for eBay’s “North Campus” which is affiliated with the Corporate Headquarters facility also located in San Jose. The firm provided engineering design for interior improvements for two 109,000 SF buildings including a 6,000 SF data center and two server rooms for this Fortune 500 Firm.

EBAY / BUILDING 17 – LEED GOLD

San Jose, CA

Type: Campus Building Size: 189,590 SF

AlfaTech provided engineering design services for eBay’s newest North Campus 5- story Building 17 in San Jose. This included a new core and shell and tenant improvements. AlfaTech also prepared electrical infrastructure design for the installation of a roof- mounted 100kW photo-voltaic panel installation. Services included feeder and panel load calculations, code search, electrical plans and coordination with Owner, panel vendors and Contractor to integrate the PV panel system into the 5-story building’s electrical power distribution and grounding systems. This project achieved LEED Gold.

C O R P O R AT E O F F I C E

INTUIT – LEED GOLD

Mountain View, CA

Type : Campus Size : 42,000 SF

AlfaTech was selected to provide mechanical, electrical, and plumbing engineering design services for a 42,000 SF office building conversion to a campus center for Intuit. Amenities include: 15,000 SF cafeteria, 12,000 SF fitness center, 13,000 SF conference center, and 3,000 SF “innovation gallery.” Exterior improvements include a sports court and amphitheater.

C O R P O R AT E O F F I C E

VISA / METRO 1, 2, & 3

Foster City, CA

Type: Offices Size: 349,000+ SF

AlfaTech completed multiple phases of renovations and interior improvements for the Metro One, Two and Three buildings on Visa’s campus, including several floors of office space, the Cafeteria and the Auditorium/Lobby. Services included mechanical, electrical and plumbing engineering, fire protection and construction administration .

VISA / 385 SHERMAN AVENUE – LEED GOLD

Palo Alto, CA

Type: Office Size: 51,000 SF

AlfaTech provided MEP services for this tenant improvement project. The 3-story, mixed use building which also include two subterranean parking levels. The project is LEED Gold certified.

Visa / Metro 1,2,3

C O R P O R AT E O F F I C E

RIVERBED

San Francisco, CA

Type : Office Building Size : 155,833 SF

AlfaTech provided mechanical, electrical and plumbing engineering design services for this project, which consisted of tenant improvement to floors 2 through 7 for a total of 155,833 SF.

The project included open office workstations, meeting rooms, conference rooms, and cafeteria with warm-up kitchen, IT rooms and support areas.

SUNPOWER

Richmond, CA

Type: Manufacturing, Office, RND Size: 180,000 SF office, 65,000 SF manufacturing, 30,000 SF R&D

AlfaTech provided design-build services for SunPower’s expansion into the historic Ford Plant in Richmond, CA. The new facility includes a 65,000 SF manufacturing plant, 180,000 SF office headquarters, and a 30,000 SF R&D facility. Key components of the project include R&D tool installations, manufacturing rack and assembly, and a roof PV plant. Provided project management services during lease and work letter scope definition negotiations with developer’s design build team.

C O R P O R AT E O F F I C E

MORRISON & FOERSTER – LEED GOLD

425 Market Street, San Francisco, CA

Type: Offices Size : 220,500 SF

AlfaTech provided mechanical, plumbing, fire protection, and electrical engineering services for Morrison & Foerster, LLP, (“MoFo”) for the renovation of the 27th through 36th floors, which the law firm occupies at 425 Market Street. The project scope included engineering improvements for final occupancy of approximately 220,500 SF on floors 29 through 36. This project was a complex, fast-paced project. MoFo consolidated from ten floors to eight floors in a four-phase restack, which included utilizing floors 27 and 28 as “swing” spaces for phasing purposes. The restack project included significant renovations.

LATHAM & WATKINS

Menlo Park, CA

Type : Law Offices Size: 120,000 SF

AlfaTech provided mechanical, electrical, and plumbing/fire protection engineering and due diligence services for three buildings (40,000 SF each) on a single campus. The project scope included a review of the existing conditions of the buildings to accommodate a law firm.

C O R P O R AT E O F F I C E

ADOBE HEADQUARTERS

San Jose, CA

Type: Office Size: Three new buildings, 1,000,000 SF total

Building One: 18-story; 440,000 SF Building Two: 15-story, 275,000 SF Building Three: 18-story, 266,000 SF

Now considered a landmark on the San Jose skyline, the Adobe headquarters campus houses more than 2,000 employees. Each of the three buildings has its own parking garage, public lobby, data center, meeting rooms, and mail room. Shared facilities include an auditorium, full-service cafeteria and fitness center. Building Two also features retail space at street level. Additionally, each tower included a data center. The data center design consisted of a 7/24 full generator/UPS backup system for HVAC, lighting and power within the room with 100% redundancy.

LOGITECH - TARGETING LEED SILVER

Newark, CA

Type: Campus relocation Size: 263,500 SF

AlfaTech provided MEP and fire protection engineering services to assist Logitech in relocating their corporate headquarters. The project consisted of the renovation of two 3-story buildings including 246,500 SF of office space and 17,500 SF of labs. Designed to meet LEED Silver.

C O R P O R AT E O F F I C E

ADVANCED MICRO DEVICES (AMD)

Sunnyvale, CA

Type: Corporate Campus: Offices, Data Center, Clean Rooms Size: 1,000,000+ SF

AlfaTech has been providing comprehensive engineering services for AMD for many years. Projects have consisted of new buildings and various renovations, including offices, clean rooms, data centers, and a new 50,000 SF Advance Commons Building. The Commons building, dedicated solely to conference, food service, dining and fitness activities, was the crowning touch in a long-term consolidation of AMD’s headquarters and Northern California research, development and manufacturing functions to one site. The facility contains an auditorium, cafeteria, fitness center, conference center, training rooms, company store, and a travel agency.

MAXIM INTEGRATED

San Jose, CA

Type: Corporate Campus, Relocation, Renovation Size: 430,000 SF

AlfaTech provided MEP, fire protection/life safety, and technology services, including telecommunications and security systems, to assist Maxim in relocating and renovating their headquarters campus which encompassed four buildings surrounding a large courtyard. Facilities included office, conference, administrative, auditoriums, and auxiliary space.

C O R P O R AT E O F F I C E

CONFIDENTIAL CLIENT

ORACLE (FORMERLY BEA SYSTEMS)

SYMANTEC – LEED SILVER

Fremont, CA

San Jose, CA; San Francisco, CA; Walnut Creek, CA; Denver, CO; Chicago, IL

China

Type: Campus Size: 450,000 SF

Type: Campus, Office, Labs, and Data Center Size: 1,000,000 SF+ (total for all three phases)

Type : Offices, Data Center Size : 2M+ SF total

AlfaTech provided MEP, Technology, Lighting, and Commissioning services for this confidential digital data storage company. The sprawling research complex incorporates offices, labs, warehouse and prototype manufacturing and includes 70,000 SF of Class 4 and Class 5 clean room space on a custom four foot raised floor allowing for extensive utility distribution. Most of the occupied space is on the first level, except for a two story office space. The spacious second level houses support infrastructure including electrical distribution, air handling units and technology support.

AlfaTech provided design services for this campus in China consisting of office, data center and manufacturing facilities. The project involved a research & development campus of four buildings including three high-rise buildings and totaling into an occupied area of over one million square feet. The facilities have conventional office spaces, server rooms, MDF rooms, and a cafeteria with full service kitchen. This is a LEED Silver project.

AlfaTech provided services on various projects for Oracle (formerly BEA Systems) for over a decade. For the Corporate Headquarters in San Jose, the firm designed mechanical and electrical systems for the research and development campus, for which the master plan consisted of 10 buildings and over 1M SF. For the San Francisco site, the firm provided MEP engineering services for a new 107,000 SF office space. For the Denver site, AlfaTech designed the new corporate-wide data center at the Metropoint II building. Redundancy and failure analysis were employed to ensure continuous operation of this key facility under a wide variety of facility challenges.

LSI LOGIC Gresham, OR

Type: Office, Wafer Fab, Central Plant Size: 327,000 SF

LSI Logic’s Gresham campus features a 200mm wafer fabrication plant, an office building, engineering and testing areas, a central computer room, cafeteria, and central plant. The complex has 12 kV power distribution with dual feed, 4160V power distribution for utility loads. Services also included electrical and lighting plans, process equipment load coordination, building/site grounding plan, and an isolated grounding plan for the computer room.

C O R P O R AT E O F F I C E

LOCKHEED MARTIN / MISSILES & SPACE

APPLIED MATERIALS

ELECTRONICS FOR IMAGING

Sunnyvale, CA

Santa Clara, CA

Foster City, CA

Type: Offices, Cafeteria, Clean Room, Model Shop, Motion Simulator Facility Size : 1,000,000+ SF

Type: Office, Clean Room, Manufacturing, Assembly, Testing Size: 1,000,000+ SF Projects: Buildings B7, B8, B9, B14, B15, B20

Type: Office, R&D, Laboratory, Food Center, Garage Size: 1,000,000 SF

Office B/578: Model Shop, Office Office B/152: Clean Room, Office

AlfaTech provided overall engineering design when EFI relocated to a 35- acre waterfront site, where they occupied a new, ten-story, 295,000 SF building, the first to be completed in a four-phase campus development plan which incorporated five buildings and a parking structure for 1,100 cars. A substantial PG&E energy rebate was given to the owner for energy-savings due to our mechanical system design.

Since 1990, the firm has been on Applied Materials’ selected prime contractor list, and has provided extensive process/chemical, electrical, and mechanical engineering services for renovations, as well as pre-design and due diligence services.

Office B/576: Motion Simulator, Office Office B/562: High Bay Access, Office Office B/577 and 582: Publication and Anti-sub Warfare, Office Office B/152: Clean Room, Office Office B/153: Utilities Upgrade, Office Office B/156F: Hubble Telescope Clean Room, Office Office B/176: Chemical Storage Facility Consolidation & Renovations, Office Office B156A: Critical Power Upgrade, Office Office B157: Computer Lab and Testing Relocation, Office For more than fifteen years, Lockheed has chosen AlfaTech as the prime design and construction consultant to work on a multitude of high technology projects at their Sunnyvale campus. Most projects entailed the programming, planning, design, and construction management for clean room facilities on this nationally prominent Lockheed site. Numerous projects entailed the upgrading of existing clean space to higher cleanliness levels in support of this company's missile system production. Significant challenges were presented in these typically “high bay” buildings.

GILEAD SCIENCES Foster City, CA

Type : Laboratory, Office, Manufacturing Size : 500,000 SF

AlfaTech provided MEP and telecommunications design for all of Gilead’s campus consisting of 16 buildings including administrative and private offices, development labs, pilot plants and cGMP therapeutic manufacturing / production areas. The firm also provided MEP engineering design services for Gilead’s 35,000 SF pilot plant on the Foster City campus as part of a previous project.

INNOVATIVE IDEAS | INTEGRATED SOLUTIONS | SUSTAINABLE PARTNERS

LOS ANGELES

SAN FRANCISCO

SAN JOSE

510 West 6 th Street, Suite 1105 Los Angeles, CA 90014

One Post Street, Suite 2200 San Francisco, CA 94104

1321 Ridder Park Drive, Suite 50 San Jose, CA 95131

213.212.9860

415.403.3000

408.487.1200

Made with FlippingBook Annual report