AlfaTech Healthcare BigBook
AlfaTech is a consulting engineering firm offering a range of complementary services and expertise in multiple markets. Our services include: Mechanical and Electrical Engineering Design, Technology, Architectural Lighting Design, Commissioning and Energy Solutions, as well as Sustainability.
INNOVATIVE IDEAS | INTEGRATED SOLUTIONS | SUSTAINABLE PARTNERS
01
OVERVIEW / Profile & Services
02
Sustainability
03
Markets & Relevant Projects
ENTER PPS #
OVERVIEW 01
Profile & Services
P R O F I L E
AlfaTech has built its reputation on providing the most innovative and sustainable engineering solutions from master planning through construction administration. Our presence is not only California and Atlanta, but also internationally. Our clients include numerous large multi-national firms, many ongoing clients we’ve been serving for years. We strive to provide intelligent and innovative strategies starting with project inception, in order to provide maximum benefit to our clients during the entire development process whether it be new high-rise projects, mixed use projects or revitalization of existing communities. Our team provides the most appropriate engineering design solutions which are highly efficient and cost effective, and promotes the greatest possible return on investment for our clients. Our goal is to build the most dynamic relationships, be attentive to the needs of our clients and partners, and be true team players. With this mindset, we’ve built a stellar list of clients.
Uber, Mission Bay 1 & 2
Eventbrite
eBay
UNITED STATES San Francisco San Jose Los Angeles Atlanta
INTERNATIONAL Europe Asia Middle East Latin America Africa
Additional Resources Through Our Sister Companies
60+ locations | 27+ countries | 3,600+ staff
S E R V I C E S
MECHANICAL ENGINEERING DESIGN HVAC
ARCHITECTURAL LIGHTING DESIGN Lighting and Lighting Controls Lighting Calculations
COMMISSIONING | ENERGY SOLUTIONS Early Quantifiable Energy Study Incentives
Heating Systems Water and Gas Cooling Systems / Chilled Water Dehumidification Systems Contamination Sensitive Areas Industrial Hygiene Systems Low Tolerance Temp Control Title 24 Analysis and Design Heat Recovery Systems Central Utility Plants Air Handlers HVAC System Controls PLC Programming Fire Protection and Plumbing
Customized ROI Calculations Sustainable Lighting Design
Energy Star® Assessments Retro-commissioning (RCx) Monitoring Brand Continuous Commissioning (MBCCx) ASHRAE Level 1, 2 and 3 Energy Audits Measurement and Verification (M&V) of installed projects Energy Modeling Net Zero Energy Budgeting HVAC/Chilled Water Plant Optimization
Energy Savings Analysis Custom Lighting Fixtures Design for finishes, fabrics and light sources
TECHNOLOGY DESIGN Low Voltage Design Security Design Audio Visual Design Wireless Design & Modeling
PROCESS Industrial Waste Collection Acid Neutralization Bio-Kill Waste System Process Waste Containment Ultra pure De-ionized Water Systems
Strategic Consulting Project Management Relocation & Migration
ELECTRICAL ENGINEERING DESIGN Power Systems
Emergency & Standby Power Lighting and Lighting Controls Security Systems 24 / 7 Power Systems (UPS) Power Monitoring Systems Toxic Gas Monitoring Graphic Control and Alarm Panels Grounding and Bonding
USP Water WFI Water Specialty Chemicals Chemical Storage
SUSTAINABILITY Sustainability Planning (Organizational and Infrastructural) LEED / Green Building Consulting Masterplanning Life Cycle Cost Assessment Occupant Wellness and Comfort
Lab and Special Gas Systems Ultra High Purity Gas Piping
Bulk & Specialty Gases Toxic Materials Handling Code Compliance Process Distribution Piping Process Cooling Water Medical Gas Medical Vacuum Waste Anesthetic Gas Disposal system (WAGD)
Energy Management Energy Conservation Fire Alarm Systems Public Address Systems Plug Loads Control
Façade Engineering CFD / Wind Studies Wind Studies Thermal Stratification Studies Energy Concept Studies
Dental Vacuum System Dental Water System
S E R V I C E S
GREEN BUILDING
SUSTAINABILITY
LIFE
MECHANICAL ENGINEERING DESIGN
ELECTRICAL ENGINEERING DESIGN
OF A BUILDING RETRO COMMISSIONING
ARCHITECTURAL LIGHTING
TECHNOLOGY
COMMISSIONING / ENERGY SOLUTIONS
CONSTRUCT I ON
OCCUPANCY
END OF USE
DES I GN
C L I E N T S
JDS Uniphase Corporation John Muir Medical Center Johnson & Johnson Johnson Controls JP Morgan Chase JRH Biosciences Juniper Networks Junipero Serra High School Kaiser HealthConnect Kaiser Permanente Kasowitz, Benson, et al
Novell Novellus Systems NVIDIA Ohlone Community College OptiSolar Oracle Orchard Properties Oread Pacific Bell PDL BioPharma PG&E Panattoni Europe Pfizer Philips Semiconductor Pitney Bowes Polycom Port of San Francisco Presidio Trust Price Waterhouse Coopers Qualcomm Queens Medical Center Rambus Raytheon Company
Scripps Memorial Hospital Sequoia Hospital CHW Sequoia UHSD Siemens SLAC National Accelerator Laboratory Solectron Corporation Sony America Spansion Sprint SRI International (Stanford Research) Stanford Healthcare & Clinics Stanford University Stanford University Medical Center
365 Main 3M Company AARP Abbott Biotherapeutics Abbott Laboratories Abbvie Abgenix Abt Associates ACCO Engineered Systems Adaptec AOC Adobe Systems Advanced Micro Devices Advantest America Advent Software Aetna Affymetrix Agilent Technologies Agnes Medical Center Akamai Technologies Alcoa Allen, Matkins, et al Alliance Bernstein, LLP Alta Bates Health System Altera Corporation Alum Rock School District Alza Amazon/Lab 126 Ambiance Associates Ambience Interiors Amdocs American Express Company Amgen Amprius
Bingham McCutchen, LLP Bio-Rad Laboratories BioGenex Biomarin Pharmaceutical BioMed Realty Trust Bloom Energy BMC Software Booz Allen Hamilton Inc
County of Sacramento County of San Mateo County of Santa Clara Credence CSAA
CSU Northridge Cupertino USD Daughters of Charity Health Dell Deloitte Consulting Digital Realty Trust Dignity Health Dominican Hospital Dropbox Dupont East Side Union HSD eBay Eil Lilly & Company Elsevier Inc Emirates National Oil Empire State Development Equinix Equis Corporation Ericsson Ernst & Young LLP Exelixis Ferrari Maserati of Silicon Valley Fidelity Investments Fireman’s Fund Insurance First Franklin Financial Corp Flextronics Foundry Networks Franklin Templeton Investments Genencor Genentech General Dynamics General Electric Genzyme Corporation Gilead Sciences Goldman Sachs Good Samaritan Hospital GSA Harbor UCLA Medical Center Hayward USD
Boston Properties Boston Scientific Bradford Schools Bristol-Myers Squibb Broadcom Broadreach Capital Partners Brocade Buck Institute Stem Cell Research Lab Cadence Design Systems Cal Pacific Med Center California Department of Mental Health CarrAmerica Development Cedars-Sinai Medical Center Chabot Las Positas CCD Charles Schwab Chevron Children’s Hospital, Los Angeles County Children’s Hospital, Oakland Children’s Hospital, Orange County Children’s Hospital, San Antonio Chinese Hospital Cisco Systems Citigroup Realty Services
Kimpton Hotels KLA-Tencor Corp La Clinica De La Raza
Stion Corporation Stryker Endoscopy Stubhub Sun Microsystems SunPower Sutter Health
Lam Research Laney College
Lawrence Berkeley Lab Letterman Digital Arts Levi Strauss & Company Linear Technology LinkedIn Lockheed Martin Corp Logitech Longs Drug Stores Los Gatos Saratoga HSD Lumentum Marriott International Martin Luther King, Jr. Community Hospital Marvell Semiconductor Maxim McKesson Medarex Menlo Park City School District Mercy Southwest Hospital Microsoft
Sybase Inc Symantec Synopsys Inc Sysorex T-Mobile Tencent Tesla Motors The Gap Twitter Uber UC Berkeley UC Davis UC Davis Medical Center UC San Francisco
Regional Medical Center Riverbed Technologies Robert Half International Roche Bioscience Ross Stores Sacramento Municipal Utility District Safeway Saint Francis Memorial Hospital Saint Joseph Hospital Saint Louise Regional Hospital Saint Mary’s Hospital Samaritan Medical Center Samsung San Francisco City Hall San Francisco International Airport San Francisco USD San Jose Medical Center San Jose Redevelopment Agency San Jose State University San Jose USD San Mateo CCCD San Mateo County Office of Education Sandia Laboratories Santa Clara County Health Dept. Santa Clara County Library Santa Clara County Office of Education Santa Clara USD Santa Clara University
City of Cupertino City of Foster City
UC Santa Cruz UC Los Angeles UCLA Outpatient Surgery/Oncology Center UCSF Mission Bay Medical Center Ultratech University of Colorado Hospital
City of Fremont City of Monterey City of Mountain View City of Newark City of Oakland City of Palo Alto City of Sacramento City of San Jose
Amstein + Walthert Anderson Architects Anixter Applied Dynamics Applied Materials Aradigm AT&T Park Clinic Atmel Corp Autodesk Avaya Avid Technology Avidex BAE Systems Bank of America Banuazizi Architects Bayer Healthcare Bechtel Corporation Bell, Rosenberg, et al Berryessa USD
Mills/Peninsula Hospital Mission Oaks Hospital Molecular Devices Monterey Peninsula College Morgan Hill USD Morgan Stanley Morrison & Foerster Motorola Mountain View School District MW Zander NASA-Ames National Semiconductor Network Appliance Nokia Nortel Networks North Bay Medical Center Northrop Grumman Novartis
University of Nevada University of Virginia URS Valley Medical Center Verisign Verity Health Verizon Communications Veteran’s Administration Visa International Vivus VMware Wachovia Bank
City of San Mateo City of Santa Clara City of Saratoga City of South San Francisco City of Sunnyvale College of Contra Costa College of Marin Colliers International Computer Associates Int’l Compuware CoreSite County of Monterey
Hewlett Packard Highland Hospital Hitachi America IBM Impax Laboratories Informatica Corporation Intel InterMune Intuit J&W Scientific
SAP Labs LLC Saratoga USD Savvis
Washington Hospital Xoma Therapeutics Yahoo
SUSTAINABILITY 02
S U S T A I N A B I L I T Y
At AlfaTech, we have a multidisciplinary team of experts to assess and design projects with a holistic approach. Working alongside owners, architects and other stakeholders, we examine every project in a comprehensive, systematic way to meet the client’s sustainability, energy, water and environmental quality goals. AlfaTech goes beyond engineering – our suite of energy, water and sustainability assessment services creates projects that benefit the bottom line. We provide expert studies in all qualitative aspects of the built environment such as day lighting, thermal comfort, advanced lighting control design, and technology integration.
We examine every project with a comprehensive systematic approach to meet the client’s sustainability, energy, water and environmental quality goals.
S U S T A I N A B I L I T Y
ADVANCED SIMULATIONS
We provide various advanced computer simulations to study wind patterns, thermal stratification and comfort issues in spaces, building façade studies and energy modeling to aid architects and owners make key decisions during the early stages of design.
Façade Engineering CFD/Wind Studies
• • • • •
Thermal Stratification Studies
Energy Concept Studies
Energy Modeling
S U S T A I N A B I L I T Y
CASE STUDY:
UBER MB 1 & 2 MISSION BAY HEADQUARTERS
San Francisco, CA
AlfaTech is currently involved in this Uber’s new San Francisco presence which is a new 420,000 square-foot, ground up office building in the Mission Bay area in San Francisco. Our scope of work includes mechanical, electrical, plumbing, technology, security, and sustainability services. AlfaTech assisted the architectural design team with optimizing performance by assessing various utility, façade and wind studies. The project is designed as an innovative, ultra- high performance building that includes a façade that responds to programmatic needs, an under floor air distribution system, a “winter garden” which acts as the main social space incorporating natural ventilation, and a proposed geothermal system to substantially reduce cooling equipment needs. AlfaTech has been providing MEP Engineering and Technology services for this client in the US and Globally for ten sites, including the new corporate headquarters in San Francisco. This is a state of the art new campus with over 420k SF of offices, a full kitchen and cafeteria. The project will include evaluation of all available sustainability features. Sustainability goals: • Significant reduction of building energy cooling needs by the use of geothermal exchange systems • Aggressive rainwater capture and retention • Natural ventilation for main atrium social areas, creating a pleasant, open experience for employees and visitors • Maximize use of day lighting to optimize workspace quality
S U S T A I N A B I L I T Y
CASE STUDY:
LENNAR CANDLESTI CK POINT & HUNTER’S POINT MASTER PLAN San Francisco, CA
The Candlestick Point and Hunter Point Shipyard is a 702-acre development that has the potential to bring most dynamic companies into the area and develop whole communities. This area will house R&D facilities, commercial spaces, multi- use buildings and retail spaces. Parks, trails, and open spaces will be additional features that will attract and enhance the community. The new development will add over 10,000 new residential units in the form of condominiums and low-, mid- and high-rise buildings. There will be over a million square feet of commercial space made available, over three million square feet for Research and Development, as well as over 300,000 square feet of property devoted to community activities. AlfaTech views this holistic approach to community development as an opportunity for Lennar Urban to be at the vanguard of urban design by creating a community infrastructure focused on environmental sustainability, technology, and self- sustaining. This means taking advantage of existing technologies to generate energy with the lowest environmental impact. We conducted a series of sustainable mechanical studies in a master plan scale to help the owners understand the options available to explore the feasibility of Net Zero energy for the new development. Proposed strategies involve:
Geothermal heat rejection systems
•
• High performance chillers and thermal energy storage • Biodigestion system for heat recovery and energy generation • Solar photovoltaic array for electricity generation • Rainwater and gray water capture and treatment
S U S T A I N A B I L I T Y
CASE STUDY:
DELTA PRODUCTS HEADQUARTERS Fremont, CA
Delta Products desired a new headquarters highlighting sustainability and energy efficiency with primary goals to showcase Delta Products’ innovation in a state of the art building blending the natural surroundings with sustainable building design. The Delta Americas Headquarters is a three-story 250,000 SF campus consisting of private offices, administrative, open workspace, conference/auditorium facilities, kitchen/dining areas, labs, office and warehouse. AlfaTech provided sustainable mechanical electrical plumbing engineering design services for this project focusing on the client’s desire to maximize natural ventilation and daylighting reduce water and energy consumption with a geothermal central plant and utilize radiant systems for primary space conditioning. AlfaTech conducted extensive CFD modeling to assist with sizing and locating windows around the building and their integration into a thermal tower ventilation strategy. The project also encompasses a photovoltaic system to balance energy consumption and achieve Net Zero Energy.
Some of the features included are:
Ecological ponds
• • •
Ground source heat pumps
• • • • • • •
EV chargers
Solar energy system Natural ventilation Active chilled beam
Rainwater harvesting
• Elevator power regeneration systems • Energy efficient HVAC system • Energy storage solutions • Hydronic bidirectional heating/cooling flooring systems
LED lighting
Spectrally selective glazing Grass and native plants
We believe making the world a better place is a responsibility we all share. And being able to do our part in the way we work is one of the best ways we can give back and have a positive effect on our environment. This means, not only do we always strive to provide the most sustainable solutions for our clients, but we are also always working on new, innovative and pioneering methods to bring sustainability to the next level, staying ahead of the curve in all types of projects in all the markets we serve.
Let’s leave the world a better place than we found it.
03 MARKETS
& Relevant Projects
HEALTHCARE
H E A LT H C A R E
UCSF MEDICAL CENTER – LEED GOLD
San Francisco, CA
Type: Hospital Size: 869,000 SF
AlfaTech provided services for a new, $1.4 billion, 289-bed hospital located in the Mission Bay area of San Francisco. The facility includes a 183-bed children’s hospital, a 70-bed hospital for cancer patients, a women’s hospital, a central utility, underground tunnel, bridge, helipad, and parking. In addition, the project includes an outpatient building, energy center, support.
H E A LT H C A R E
SANTA CLARA VALLEY MEDICAL CENTER
Santa Clara, CA
Type: Medical Office Building Remodel; Skilled Nursing Facility & Psychiatric Facility; Master Plan and Survey Size: 120,000 SF / 14,000 SF
The firm performed mechanical and electrical engineering design services for this 3- story medical office building which included converting existing office space into medical exam rooms, patient treatment rooms, physical therapy suites and a new pharmacy. An AIDS/ICH treatment clinic was provided; complete with patient treatment "negative pressure" isolation rooms. Significant HVAC upgrades where required for the renovation. New power and telephone/data distribution throughout the entire building was required and new lighting for the upgraded areas. A new fire alarm system was specified and the corridors were upgraded to bring the building up to current code requirements. The 14,000 SF consists of a Feasibility Study of the existing Don Lowe Pavilion to evaluate the potential for this site to be converted.
H E A LT H C A R E
UC DAVIS MEDICAL CENTER
Sacramento, CA
Type: Radiology; Renovations Size: Radiology: 11,300 SF; Medical Center Tower: 72,000 SF Projects: • Radiology Expansion • Medical Center Tower II • Mechanical Infrastructure Analysis
The firm completed three separate projects for UC Davis Medical Center. Electrical design engineering for the conversion of a vacant medical records department to a new radiology suite; preparation of design criteria for the mechanical, electrical and fire protection systems for a new patient medical tower, and; infrastructure analysis of mechanical system in Clinical Lab and Research building.
H E A LT H C A R E
SAINT FRANCIS MEMORIAL HOSPITAL – BOTHIN BURN CENTER
San Francisco, CA
Type: Burn Center Size: 12-story hospital tower
AlfaTech provided engineering design services for several projects at Saint Francis Memorial Hospital, a 12-story, 323-bed hospital tower, located in San Francisco, CA. SFMH is also a Dignity Health network member. Projects included converting an entire floor into the Bothin Burn Center, providing new OR rooms, remodeled psychiatry wing and MRI rooms. Additionally the firm has performed steam boiler and medical gas upgrades, pre-op recovery area, lobby & nurse’s station remodel, refrigerator & freezer replacement and office renovations. The new Bothin Burn Center is a 15,500 SF, 16-bed, intensive care burn unit on the 5th floor of the hospital. Bothin Burn Center is the largest in northern California, treating over 500 burn victims each year. This isolation unit features an independent ventilating system, minimizes the risk of outside contamination and maintains strict room temperature and humidity control.
H E A LT H C A R E
SAINT FRANCIS MEMORIAL HOSPITAL – OPERATING ROOMS
San Francisco, CA
Type: Operating Rooms Size: 12-story hospital tower
AlfaTech provided engineering design services for several projects at Saint Francis Memorial Hospital, a 12-story, 323-bed hospital tower, located in San Francisco, CA. SFMH is also a Dignity Health network member.
Projects included converting an entire floor into the Bothin Burn Center, providing new OR rooms, remodeled psychiatry wing and MRI rooms.
Additionally the firm has performed steam boiler and medical gas upgrades, pre-op recovery area, lobby & nurse’s station remodel, refrigerator & freezer replacement and office renovations.
Saint Francis opens nine new and most advanced operating suites in San Francisco.
H E A LT H C A R E
KAISER PERMANENTE
Bay Area, CA
AlfaTech has been involved in many projects for Kaiser Permanente over the past 20 years. These projects have been for hospitals, as well as medical office buildings, and include modifications, alterations and upgrades for patient rooms, labs, pharmacies, specialty units, and more. These Kaiser locations include:
• Kaiser SSF, MOB Generator • Kaiser SSF, ETO Sterilizer • Kaiser SSF, MOB Generator
• Kaiser Redwood City, HealthConnect • Kaiser San Rafael, HealthConnect
• Kaiser Santa Clara • Kaiser Santa Teresa • Kaiser San Francisco
• Kaiser San Jose • Kaiser Daly City • Kaiser Antioch • Kaiser Oakland • Kaiser Richmond
Kaiser Medical Center, San Jose, CA
H E A LT H C A R E
EL CAMINO HOSPITAL
Los Gatos, CA
Type: Obstetrics, Endoscopy; Renovations Size: 13,650 SF Obstetrics Wing
Formerly the Community Hospital of Los Gatos. AlfaTech provided complete mechanical and electrical engineering design for HVAC, plumbing, medical gases, power, lighting and signaling for the new endoscopy unit. Endoscopy equipment included emergency power systems. The obstetrics wing required a complete remodel with new systems.
Kaiser Medical Center, San Jose, CA
H E A LT H C A R E
KAISER HEALTH FOUNDATION
Oakland, CA
Type: Office, Laboratory, Radiology, Ultrasound; Master Plan & Survey Size: Medical Office Building, 120,000 SF, 5-story, 3900 Broadway, 30,000 SF Projects: • Medical Office Building • 3900 Broadway Offices & Labs • Ultrasound Equipment Installation Design • Building D Ultrasound Equipment Installation Design AlfaTech has completed numerous projects for Kaiser Health Foundation, providing engineering services for a new medical office building, a renovation to a historic landmark office building, and new ultrasound equipment installation design. The two ultrasound rooms required electrical design, power, lighting and signal design with an emphasis on RFI protection.
KAISER PERMANENTE
Santa Rosa, CA
Type: Addition to Existing Medical Facility Size: 350,000 SF
The firm performed mechanical, electrical and plumbing design services for the addition of a new air handling system to serve the labor delivery wing and operating rooms.
H E A LT H C A R E
STANFORD UNIVERSITY MEDICAL CENTER
Menlo Park, CA
Type: Medical Office Building
AlfaTech provided mechanical, electrical and plumbing engineering services for infrastructure upgrades to this medical office building, including: • Electrical Transformer Upgrade & Electrical Distribution • HVAC Upgrade (Unit replacement; not including distribution) • Fire Sprinkler Upgrade, including coordination with Civil Engineer to bring new Fire Services, riser assembly and stub-out for future tenants improvement (TI) services • Plumbing, including replacement of existing plumbing fixtures with new ADA type (where required) • ADA & other Life Safety upgrades as required for City approval, including Fire Alarm and Smoke Detection
LA CLINICA DE LA RAZA
Oakland, CA
Type: Patient Rooms, Treatment Rooms, Laboratory; Renovation Size: 40,000 SF
The facility contains patient examination and equipment/treatment rooms as well as laboratory space. AlfaTech provided mechanical and electrical design for this 3-story healthcare facility in downtown Oakland’s urban center. The program included patient rooms, laboratories, treatment rooms, medical faculty support programs a dental clinic, pharmacy and x-ray.
H E A LT H C A R E
MERCY SOUTHWEST HOSPITAL
Bakersfield, CA
Type: Hospital, Medical Office Building Size: 214,000 SF
This new replacement hospital won a design award from Modern Healthcare magazine. The firm provided engineering design services for this 112,000 SF family care center, a cardiac/cath lab, 44 acute care beds, 18 LDRP beds, 24 sub-acute beds, a 120-bed skilled nursing facility, 22 primary care beds, and two 30,000 SF medical office buildings.
ST. LOUISE REGIONAL HEALTH
Morgan Hill, CA
Type : Replacement Hospital Size : 80,000 SF, 50 beds
The firm provided engineering design services for this 80,000 SF stand-alone hospital.
H E A LT H C A R E
GOOD SAMARITAN HOSPITAL
Los Gatos and San Jose, CA
Type: Isolation, NICU, Skilled Nursing, Cardiac Cath Lab; Hospital Expansion, Master Plan and Survey Size : 520 beds
The firm performed systems analysis and recommended improvements for several projects at Good Samaritan Hospital. A complete infrastructure review and analysis was provided for the hospital mechanical, electrical, plumbing, and medical gas systems. Engineering documents for the proposed new NICU were reviewed for compatibility with the existing infrastructure, code compliance and constructability.
VETERAN’S ADMINISTRATION
Various Locations, CA
Type: Hospital, Clinic, Laboratory, Radiology Size: Various
AlfaTech has completed numerous projects for the Veterans Administration at sites throughout Northern California. These have ranged in size and scope from an 8,000 SF clinical lab renovation to an 180,000 SF primary care/ambulatory care center. Engineering services have included mechanical, electrical, plumbing, fire protection, and telecommunication systems design, as well as infrastructure analysis.
H E A LT H C A R E
SEQUOIA HOSPITAL
UNIVERSITY HOSPITAL OF DENVER
VALLEY MEDICAL CENTER
Redwood City, CA
Denver, CO
San Jose, CA
Type: IDF Rooms
Type: Acute Care Hospital Size: 320 beds
Type: Hospital; Fire Detection System Upgrade
AlfaTech provided architectural design, mechanical, electrical, plumbing and structural engineering for the space conversions for six new IDF rooms, and upgrades and modifications to five existing IDF rooms, including the existing MDF and Data Center, the addition of display tracking board monitors in various departments, and a new underground conduit for fiber connection to Building 2900 from the main hospital building.
The firm designed and documented an upgrade to this medical facility’s Building H-4 fire detection system.
The firm performed a mechanical system analysis and documented findings and recommended improvements in a detailed report. The report addressed current infrastructure characteristics and ability to meet current and future load demands, and potential phasing and intertie issues. The firm also recommended how to improve operating efficiencies and take advantage of energy conservation opportunities.
ST. MARY’S HOSPITAL San Francisco, CA
Type: Hospital Size: 12,000 SF
CHILDREN’S HOSPITAL OAKLAND RESEARCH INSTITUTE Oakland, CA
WASHINGTON HOSPITAL Fremont, CA
Mechanical and electrical services were provided to upgrade hospital wing 4 West. A study of existing HVAC systems was performed to determine the best way to upgrade them to serve the additional load. Existing supply fan systems were upgraded with new variable frequency drives to replace inefficient inlet dampers for constant volume control.
Type: Hospital Assessment; Master Plan and Survey Size: 100,000+ SF
Type: Laboratories, Animal Facilities, Offices Size: 13,000 SF
The firm performed site surveys and prepared required documentation for the identification of possible Legionelle colonies to be sampled by a testing agency. Facilities included in this study were the Hospital Tower, 1900 Mowry building, Mobil Surgery Unit, Cooling Tower, Laundry and Central Plant facilities and the Washington West building.
AlfaTech provided engineering design services for the remodel conversion of an historic high school building into the state-of-the-art Dr. Ames Research Laboratory. The project included a large animal facility, labs, lab support, library, and offices. AlfaTech designed the HVAC, fume exhaust, building automation, and plumbing/process piping systems.
ST. MARY’S HOSPITAL San Francisco, CA
Type: Patient Care Upgrades Size: Various
NATIVIDAD MEDICAL CENTER Salinas, CA
CHILDREN’S HOSPITAL OF SAN ANTONIO San Antonio, TX
The firm completed various projects for St. Mary’s including Mechanical and Electrical design for renovation of patient care areas; Mechanical & Electrical design for generator cooling system revision; Mechanical Engineering for medical air and vacuum projects and Mechanical and Electrical design of new central plant equipment.
Type: Hospital
Type : Hospital Size : 521,000 SF
Feasibility study to provide 3 options: (1) PV’s on parking canopies only, yielding only 30% (2.2 MW system) of the campus’ annual electric usage; (2) combination of building roofs and parking canopies (3.2 MW system); and (3) how much additional space required, and where, in order for the system to pay for 50% of the campus’ annual electric usage (3.4 MW system).
The firm performed engineering design services for a building extension. The hospital has 7,000 patient visits annually and 196 staffed beds.
H E A LT H C A R E
SOUTH VALLEY MEDICAL
MEDICAL ARTS CENTER
AT&T PARK CLINIC
Gilroy, CA
Campbell, CA
San Francisco, CA
Type: Medical Office Building, Exam Rooms, Procedure Rooms Size: 30,000 SF
Type: Medical Office Building, Exam Rooms, Procedure Rooms Size: 40,000 SF
Type: Clinic Size: 5,500 SF
The firm performed engineering mechanical and electrical design services for this new 2-story medical office building.
The firm performed engineering design services for this new 4-story medical office building containing outpatient surgery and general services, CAT scanner, and doctors’ suites with individual examination and office areas.
The firm performed engineering design services for tenant improvement work to install a clinic in a baseball stadium.
MISSION OAKS HOSPITAL Los Gatos, CA
CALIFORNIA DEPARTMENT OF MENTAL HEALTH Coalinga, CA
NORTH BAY MEDICAL CENTER Fairfield, CA
Type: Secure Treatment Facility Size: 1,000,000 SF
Type : Oncology, Isolation Room, Breast Center, Size : 4,000 SF
Type: Laboratory, Pediatric Renovation Size: 6,500 SF
AlfaTech provided mechanical and electrical engineering design, including construction administration services for this new 1,500 bed, 1,000,000 SF secure treatment facility with over 40 buildings and construction budget of $300M.
The firm worked on several projects for Mission Oaks Hospital: conversion of a pain clinic to a breast center; an isolation room system study; and a sterilizer room study. Isolation room mechanical and electrical systems were surveyed for OSHPD-compliance and a report was submitted that documented findings and recommended improvements. The firm also evaluated sterilizer systems against current code requirements. The final report contained information about existing system issues, equipment requirements, and the necessary mechanical and electrical system modifications.
The firm performed engineering design services for the remodel of clinical laboratory and pediatric unit. Project scope included a cafeteria expansion and renovations to the nurses’ lounge and workroom, nourishment station, medication area and office space. Full mechanical, electrical, plumbing and fire protection design.
NAPA STATE HOSPITAL – BLDG COMPLEX 195 Napa, CA
EL CAMINO HOSPITAL Mountain View, CA
Type: Patient Rooms Size: 60,000 SF
Type: Clinic; Dialysis Center, Renovations Size: New Clinic, 5,000 SF; 15 stations Projects: • Dialysis Center • Endoscopy Suite, 8,000 SF • Pedestrian Tunnel Upgrade • Patient Tower 2nd Floor Headwall • SPECT Camera Installation
O’CONNOR HOSPITAL San Jose, CA
The firm prepared mechanical and electrical construction documents involving the remodel of patient residential buildings to create double occupancy sleeping rooms. Work included upgrading of HVAC, electrical and fire and life safety systems.
Type: Remodel Existing Medical Facility Size: 5,000 SF
The firm performed full design services for new endovascular suite/operating room in existing hospital. Ongoing projects include recent cardiac/cath lab remodel, and mechanical and electrical design for future remodel/expansion projects.
H E A LT H C A R E
KAISER PERMANENTE
KAISER HOSPITAL
DOMINICAN HOSPITAL
Santa Cruz, CA
Daly City, CA
Redwood City, CA
Type: Gas Sterilizers, Washer/ Decontaminator Size: Various
Type : Laboratory, Acute Care Size : Clinical Lab, 8,000 SF; Acute Care, 35,000 SF Projects :
Type : Medical Office Building Size : 120,000 SF
The firm performed electrical engineering design services to replace existing equipment. For the Gas Sterilizers, AlfaTech replaced existing ETO, ABTOC, and 20” steam sterilizer with two gas sterilizers and provided two new chemical sterilizers. For the washer/decontaminators the firm replaced two existing decontaminators with two new washer/decontaminator units. The project involved demolition of existing power services and installation of new power services to accommodate the new equipment.
• Clinical Laboratory Remodel • Acute Care Rehab Center • CT Scanner Hook-up • Mammography Relocation • Nursery Isolation Remodel • Underground Diesel Fuel Tanks
The firm performed engineering design services for the conversion of a new leased spec office building into a fully functioning 120,000 SF medical office building with exam rooms, patient rooms, doctor’s offices, and one floor of conferencing center.
KAISER OAKLAND DISTRIBUTION Oakland, CA
The firm has completed numerous projects for Dominican Hospital. The two largest were renovations to a clinical lab and addition of a new acute care rehabilitation center, which included renovating adjacent patient rooms. The fume exhaust and air handling systems were upgraded, and provision was made for an improved gas supply system.
KAISER PERMANENTE SANTA TERESA HOSPITAL PHARMACY San Jose, CA
Type: Conversion to Pharmaceutical Distribution Center Size: 350,000 SF
Mechanical, electrical and plumbing design for the renovation of a 350,000 SF warehouse into a pharmaceutical distribution facility. Our design included cold storage with humidity control, narcotics storage, and server rooms.
Type : Pharmacy Expansion
CALIFORNIA PACIFIC MEDICAL CENTER San Francisco, CA
AlfaTech provided MEP engineering for the expansion of the Inpatient Pharmacy and Discharge Patient Pharmacy at Santa Teresa Hospital. The goal of the project was to construct the expanded pharmacies in spaces presently designated for other uses. The design incorporated phasing to facilitate moving the discharge patient pharmacy into the inpatient pharmacy in an interim configuration, prior to the final build out of the discharge patient pharmacy.
KAISER HEALTH CONNECT Redwood City, CA
Type : Various Projects Size : Various
Type: Medical Office Building
Formerly St. Luke’s Hospital. AlfaTech provided MEP engineering design for the MEP system, Life Safety and Fire Protection system upgrades.
The firm performed engineering design services for the remodel of an existing three TR rooms as part of the medical office building HealthConnect IT closets upgrades. The project consists of design of interior lighting and associated controls in existing TR rooms.
H E A LT H C A R E
REGIONAL HEALTH CENTER OF SAN JOSE
REGIONAL HEALTH CENTER OF SAN JOSE
REGIONAL HEALTH CENTER OF SAN JOSE
San Jose, CA
San Jose, CA
San Jose, CA
Type: Renovation / Remodel Size: Various
Type: HVAC Upgrade, Renovations Size: 70,000+ SF
Type: X-Ray Equipment Upgrade, Renovations Size: Various
The firm provided design for Mechanical Engineering services for the remodel of an Endoscopy suite, nuclear medicine camera replacement, mammography suite remodel and additional multiple projects.
The firm prepared the mechanical, electrical and plumbing design for the upgrade of 4 HVAC systems to comply with current OSHPD code requirements. Modifications were made to upgrade the existing domestic water distribution systems; including the incorporation of an instantaneous domestic hot water system. A new condensate return system replaced an existing non-functional system. Modifications to the electrical distribution system were made to accommodate the new equipment. Modifications were made to the existing fire alarm system to achieve OSHPD code compliance.
The firm performed engineering design services to revise the current mechanical, electrical and plumbing design to accommodate the installation of a new GE Advantx HF 65 X-ray machine and support equipment. The HVAC system was modified to comply with current OSHPD requirements. The electrical distribution system was modified to supply power to the new x- ray machine and support equipment. Fire alarm system was made to comply with OSHPD requirements. Our services include a comprehensive electrical systems study at Evergreen Dialysis Clinic, and for a new clinic in central San Jose. The latter was further studied for future expansion to 20 stations. The study included all primary utility power and secondary power distribution with panel boards for each floor.
REGIONAL HEALTH CENTER OF SAN JOSE San Jose, CA
Type: Radiology Rooms 4 & 5, Medical Room Conversion Size: 12,000+ SF
REGIONAL HEALTH CENTER OF SAN JOSE San Jose, CA
AlfaTech prepared the mechanical, electrical and plumbing design for the upgrade of two existing Radiology Rooms, X-ray machines and provided the electrical and mechanical infrastructure for the new X-ray machine and support equipment. The firm designed the mechanical system that supports Radiology Room 4, Radiology Room 5 and Radiology Room 6 in the future. Modifications were made to the existing fire alarm system to achieve OSHPD code compliance.
Type : CT and Radiology Room, Digital Processing Room Size : 14,000+ SF
REGIONAL HEALTH CENTER OF SAN JOSE San Jose, CA
Type: Cath Lab X-Ray Replacement Size: 6,000+ SF
The firm prepared the mechanical, electrical and plumbing design for the upgrade of the CT Scanner Room and Radiology Room 1. A new roof-top air handler and exhaust fan were added. Power was redistributed for X-ray and support equipment. The existing darkroom was relocated and upgraded to a Digital Processing Room. Modifications were made to the existing fire alarm system for OSHPD code compliance.
The firm performed engineering design services for the upgrade of the Cath Lab X-ray machine and support equipment.
H E A LT H C A R E
UCLA OUTPATIENT SURGERY/ONCOLOGY CENTER
CEDARS-SINAI WEST LOS ANGELES URGENT CARE
PALI MOMI HOSPITAL
Santa Monica, CA
Los Angeles, CA
Aiea, HI
Type: Hospital; Master Plan Size: 490,000 SF, 118 beds
Type: Urgent Care Center Size: 8,200 SF
Type : Hospital Size : 50,000 SF
The firm performed mechanical and electrical systems analysis and documented findings and recommended improvements in a detailed report. The report addressed current infrastructure characteristics and ability to meet current and future load demands, and recommendations to improve operating efficiencies and take advantage of energy conservation opportunities.
The firm provided MEP design services for Suite 100 &105, approximately 60% of the overall floor plate. The scope includes urgent care exam rooms, x-ray, infusion rooms, laser dermatology, and dermatology exam.
The firm performed plumbing and electrical engineering design services for this upgrade the hospital clinical building area. The project achieves LEED Gold Certification for New Construction and is the first Outpatient Surgery and Oncology Center in the nation to achieve this rating. All design elements—from planning to materials—were guided by the concept that a more natural, and less clinical, environment promotes healing in patients and supports alert, productive behavior in doctors, staff, and student.
MILLS/PENINSULA HOSPITALS San Diego, CA
KAPI’OLANI WOMEN’S & CHILDREN’S HOSPITAL Honolulu, HI
Type: Hospital Renovations
ST. FRANCIS MEDICAL CENTER Santa Monica, CA
The firm performed engineering design services for the remodel of the seventh floor of Peninsula Hospital. Improvement areas included radiology, physical therapy, labor and delivery rooms, morgue, conference center and mobile lithotripter. Mechanical and electrical engineering services accomplished a utility relocation along with the addition of a 300-ton chiller and associated mechanical/electrical equipment.
Type: Hospital; Master Plan and Survey Size: Various
Type: Brachytherapy Unit
Kapi’olani delivers about 6,000 infants each year. Their other services include a 24-hour emergency room, family services, surgery, and centers for fetal diagnostics, poison control, neonatology, and pediatric arthritis. The firm performed a mechanical system analysis and documented findings and recommended improvements in a detailed report.
Services included an engineering study to convert a surgery suite into a brachytherapy unit.
H E A LT H C A R E
SOUTHERN CALIFORNIA PROJECTS
As of August 1st, 2018, Levine/Seegel Associates (a full service MEP firm in Los Angeles) owners and their staff has joined AlfaTech and moved to the AlfaTech Los Angeles office. Below is a list of projects completed by Levine/ Seegel and the AlfaTech team.
• Shin Imaging Center, Fullerton, CA • Dr. Barrett Plastic Surgery, Beverly Hills, CA • Kaiser Medical Center, Sunset, Los Angeles, CA • Northeast Valley Health Corporation, San Fernando, CA • Glendale Adventist Medical Center, Glendale, CA • Riverside County Jail Medical Building, Riverside, CA • Asian Pacific Health Care Venture, Los Angeles, CA • Health South Rehabilitation Hospital, Bakersfield, CA • St. Joseph Hoag Hospital, Irvine, CA • Riverside Community Hospital, Riverside, CA • City of Hope – Wing One Renovation, Duarte, CA • Barstow Community Hospital, Barstow, CA • St. Joseph Hospital, Brea, CA • Presbyterian Intercommunity Hospital, Whittier, CA • Pomona Valley Hospital, Pomona, CA • 16 th Street Surgery & Oncology Center, Santa Monica, CA • Santa Monica Orthopedic Hospital, Santa Monica, CA
• Cedars-Sinai Medical Center, Los Angeles, CA • Kaiser Permanente South Bay Medical Center, Harbor City, CA • Los Angeles County Children’s Hospital, Los Angeles, CA • Centinela Hospital Medical Center, Inglewood, CA • Harbor UCLA Medical Center, Torrance, CA • LAC + USC Medical Center, Los Angeles, CA • Kaiser Fontana Hospital Replacement, Fontana, CA • Children Hospital Orange County, Orange, CA • Long Beach Memorial Medical Center, Long Beach, CA • Veterans Affairs Long Beach Health Care System, Long Beach, CA • Silverlake Medical Center, Los Angeles, CA • St. John Regional Medical Center, Oxnard, CA • Scripps Memorial Hospital, San Diego, CA • Martin Luther King Jr. Community Hospital, Los Angeles, CA • Westside Pain Specialist, Rancho Cucamonga, CA • Spin and Pain Institute, Irvine, CA • Valley Vascular Association, Santa Clarita, CA • Dr. Daneshrad, Santa Monica, CA
INNOVATIVE IDEAS | INTEGRATED SOLUTIONS | SUSTAINABLE PARTNERS
LOS ANGELES
SAN JOSE
SAN FRANCISCO
510 West 6 th Street, Suite 1105 Los Angeles, CA 90014
One Post Street, Suite 2200 San Francisco, CA 94104
1321 Ridder Park Drive, Suite 50 San Jose, CA 95131
213.212.9860
415.403.3000
408.487.1200
Made with FlippingBook - professional solution for displaying marketing and sales documents online