AlfaTech NorCal Higher Education Expertise

College of Marin, Diamond PE Complex

Kentfield, CA

TYPE: SIZE: ACCREDIATION:

New Construction, Additions, and Modernizations 42,388 SF LEED Gold

AlfaTech was selected to provide all up-front engineering services relating to all planned bond projects including the master planning, district-wide energy modeling, district-wide mechanical, electrical and plumbing facility assessments, and design standards for the District with projects totaling over 170,000 SF. The firm provided engineering design services and construction administration for the renovation of the Diamond PE existing complex including the men’s and women’s locker room buildings, an office/exercise room building and a gymnasium. The project included new HVAC and electrical distribution. An energy management control system (EMCS) links directly to the new central campus EMCS system on the central part of the Kentfield campus. The project also includes a photovoltaic system that will either provide electrical for distribution in the building or supplemental hot water for the swimming pool and series of sixteen new photovoltaic solar array panels in the adjacent parking lot.

This project has achieved LEED Gold certification.

Made with FlippingBook Annual report maker