AlfaTech Mission Critical Big Book
M I S S I O N C R I T I C A L
EQUINIX SV2 Santa Clara, CA
Type : Data Center Size : 60,000 SF
AlfaTech provided full mechanical, electrical, plumbing, fire protection engineering, technology design services and overall design project management for tenant improvement to this existing operational collocation facility. This $41 million project includes two separate 22,000 SF build-outs with necessary utility infrastructure upgrades. Electrical design includes live conversion of 2N Data Center spaces to a 3+1 block redundant design and redistribution of existing loads. Mechanical design includes payback analysis for rooftop air handlers with air side economizer and central plant chiller upgrades to optimize system efficiency and reliability. AlfaTech acted as the LEED NC program coordinator and developed design and construction strategies to obtain it’s recently awarded LEED Certified Level status. The firm managed the entire application and appeals process without the use of a LEED consultant, including online documentation of sustainable measures implemented for certification. In order to meet the high data center demand in California’s Silicon Valley, Equinix targeted a rapid expansion/ conversion of their existing SV2 facility located in Santa Clara. AlfaTech led the design team and completed the MEP design for this fast- paced project. We were able to complete the project ahead of schedule, reduce the overall project costs, and incorporate sustainable construction practices.
Made with FlippingBook - Online catalogs