VMWARE DATA CENTER - LEED PLATINUM
EQUINIX LA1 IBX FACILITY Los Angeles, CA, USA
Wenatchee, WA
Type : Data Center Size : 61,000 SF
Type: Data Center, Strategic Planning and Programming Size: 85,000 SF total
This $31 million project was completed in one phase and consists of approximately 51,000 SF of collocation space, and 10,000 SF of storage area.
AlfaTech supported both the initial build and multiple expansion phases for the VMware Data Center. The facility was initially completed and put into production in January 2009, providing 20K SF of Tier II Data Center space. During the initial construction, AlfaTech provided project management and technical design peer review. AlfaTech was then retained for the full design and construction management of the first expansion, adding 10K SF of Tier II Data Center space. In 2010 AlfaTech was retained for the full design and to provide construction management of the second expansion, adding 25K SF of Tier III Data Center space. This expansion was completed in January 2012. Both initial phases and the most recent expansion have achieved LEED Platinum status.
The colocation area contains a proposed 530 cabinets, and was designed with stand-alone mechanical and electrical systems with interconnections to the existing 6th floor collocation where necessary for reliability or where indicated in the initial single line and flow diagrams.
EQUINIX New Jersey, Virginia, Los Angeles, Santa Clara
Type: Data Centers Size: 200,000 SF data centers, 320,000 SF total
SYMANTEC DATA CENTER - LEED GOLD North America
AlfaTech has been providing comprehensive overall project/construction management and architectural/engineering services for Equinix data centers (collocation) in four locations, including all related scheduling and cost- estimating. The $80 M Virginia project, the $85 M New Jersey, and the $40 M Santa Clara projects were completed in 2007 and 2008. In addition, we have the $40 M Los Angeles project completed in 2009.
Type: Data Center Size: 34,000 SF (Data Center); 120,000 SF (total)
AlfaTech provided project management, architectural, and engineering services. These include MEP, civil, and structural services for the design of the first phase for a new data center in an existing shell at an undisclosed North America data center site. The base building is approximately 115,000 SF and the build-out is constructed in two phases. Phase 1 design scope of work includes approximately 19,000 SF of data center rack space completely built out (4MW of IT load), infrastructure for an additional 15,000 SF future data center space (4MW of IT load), and a 46kV electrical substation on site. The main equipment and components of certain systems such as HVAC for support rooms and offices, building management systems, life safety and fire alarm systems will be installed in Phase 1. The project includes an N+1 design concept with chilled water and air handling units providing cooling under a raised floor. This project was awarded LEED Gold Certification.
NXTVN DATA CENTER PARK Virginia Beach, VA
Type : Data Farm Size : 250 Acres
The company provided global mission critical strategic planning and support for this large data center park provider. AT-PD is also currently supporting a new proposed 22-building campus in Virginia Beach with new dedicated substations, underground fiber infrastructure, new undersea cable landing station, and data halls capable of supporting 336mW of critical load.