CORES ITE – TARGET: LEED GOLD Santa Clara, CA

Type: Data Center, Offices Size: 72,000 SF (data center), 18,000 SF (office)

AlfaTech provided mechanical, electrical, plumbing and fire protection design and engineering services for this fast-track project completed in 2011. The project consists of the replacement of an existing single story concrete tilt-up building with a new 2-story building including 72,000 SF of Tier III Data Center space and 18,000 SF of building common, core, and office. The design incorporates hot and cold-aisle containment strategies and is intended to obtain LEED Gold level certification.