AlfaTech Qualifications_Takeda San Diego

Janssen Pharmaceuticals*

Vacaville, CA

TYPE:

Tenant Improvement

Janssen Pharmaceuticals operates a manufacturing site which was originally constructed in 1985. The HVAC design strategy originally employed consisted of installation of a dedicated HVAC systems for each separate space including each manufacturing suite, clean corridors, QC labs, washrooms, warehousing and administrative spaces. Between 2012 and 2019, Janssen embarked on a multi-year program to replace aging equipment. The effort included developing multiple options for consolidation of systems for cost and space efficiency while ensuring proper air distribution and balancing across the highly diverse environments in the building. Protecting again cross contamination and release of toxic chemicals was a top priority. The program also included goals for energy efficiency achieved by specifying highly efficient units, reviewing and revising required air changes and improving system monitoring and control.

ALFATECH EXPERIENCE

* Completed by AlfaTech principal during previous employment

Made with FlippingBook PDF to HTML5