AlfaTech Qualifications_Takeda San Diego

Xoma Therapeutics

Berkeley, CA

TYPE: SIZE:

Tenant Improvement 8,000 SF & 10,000 SF

For the Pilot Plant, the project includes conversion of the X-5 pilot plant to a combination of manufacturing and research. Modifications were made to the existing facility, bringing it to current ADA standards, and generally “state -of-the- art” status. For the cGMP warehouse facility, the firm provided full design services which entailed the renovation of an existing facility along with validation support and construction management. The warehouse concept entailed the renovation of an existing facility along with validation support.

Xoma Therapeutics

Berkeley, CA

TYPE: SIZE:

New Construction 5,000 SF & 12,000 SF

For the 5,000 SF Fermentation Suite, AlfaTech provided full design and construction management for its GMP new 2,000-liter fermentation suite along with validation support. Design for the 12,000 SF Suite provided a new cGMP fermentation suite consisting of 50 L, 130L, 500L, 2750L, and 12,000L fermenters. These were fully automated with CIP and SIP capability. In addition, a number of media preparation and purification vessels were specified.

ALFATECH EXPERIENCE

Made with FlippingBook PDF to HTML5