AlfaTech Qualifications_Takeda San Diego

SLAC National Accelerator Laboratory

Palo Alto, CA

TYPE:

Feasibility Study

AlfaTech provided a feasibility study for the FEH Hutches 4, 5 and 6 project to define alternate system solutions for the HVAC design. The project was in the final design phase using a single unit air handling system. The distribution system was going to occupy space that the owner wanted to reserve for future use. We provided a conceptual design study to evaluate how much space could be saved using a different system. The study included pros and cons of each system, sketches for cost estimating and peer review of existing design documents.

*Par, Fairbank OSD

Irvine, CA

TYPE: SIZE:

Master Planning 90,000 SF

Responsible for Master Planning, Options Development, Programming, and Conceptual Design of the facility. For an existing 90,000 SF OSD Facility that includes manufacturing, QC lab, lab support, warehousing and administrative functions

ALFATECH EXPERIENCE

* Completed by AlfaTech principal during previous employment

Made with FlippingBook PDF to HTML5