AlfaTech Qualifications_Takeda San Diego
Bayer Healthcare
Berkeley, CA
Tenant Improvement 40,000 SF
TYPE: SIZE:
AlfaTech was selected to perform design construction management services for the replacement and upgrade of the B55 WFI system. The state-of-the-art replacement WFI system consisted of a single HWFI loop with multiple POU heat exchangers. WFI temperatures at the POUs were controlled using HMI panels. The firm scope of work included: interviews with the users to determine WFI consumption; production of complete WFI design-built and demo bid packages; procurement of owner- furnished components; selection of a design-built contractor; and management of the final design and construction effort.
*Bristol-Myers Squibb
Redwood City, CA
TYPE:
Tenant Improvement
This project consisted of replacement of an aging and inefficient chilled water system serving Autoclaves in the facility’s vivarium. A key project challenge included addressing a widely variable load. The chiller was specified with three compressors to allow efficient coverage of the loads.
ALFATECH EXPERIENCE
* Completed by AlfaTech principal during previous employment
Made with FlippingBook PDF to HTML5