AlfaTech Qualifications_Takeda San Diego

*Novartis (Chiron)

Emeryville, CA

TYPE:

Tenant Improvement

Architecture and Engineering Design for multiple facility projects including: • Site Wide Energy Efficiency Study • Building 4 Lab Tenant Improvements • Robotics Lab Tenant Improvements • Building 4 Executive Conference Center • Building G&T Chilled Water System Upgrades Concept Design

Aradigm

Hayward, CA

TYPE:

Tenant Improvement 20,000 SF

Aradigm is engaged in the development of novel pulmonary drug delivery systems designed to enhance the delivery and effectiveness of a number of existing and development stage drugs and reduce the need for injectable drug therapy. Clinical trial Phase III quantities of three new products for inhalation therapy will be produced at the new full-scale cGMP clinical and manufacturing facility. AlfaTech also provided services at Aradigm’s 30,000 SF production facility.

The project has extensive clean rooms, including Class 100 laminar flow processing areas; a WFI generation and distribution system; and high purity gas distribution.

ALFATECH EXPERIENCE

* Completed by AlfaTech principal during previous employment

Made with FlippingBook PDF to HTML5