AlfaTech Qualifications_White & Case (pps220370)
Goodwin Procter LLP, 5 th Floor 520 Broadway, Santa Monica, CA
TYPE: SIZE:
Tenant Improvement 18,298 SF
AlfaTech provided the mechanical, electrical, plumbing engineering and technology (low voltage, audiovisual and security) design for the tenant relocation space on the 5th floor of 520 Broadway. The firm provided an initial feasibility study of all existing MEP systems and equipment associated with the base building. The scope of work included a combination of multiple private offices, open work areas, conference rooms, coffee bar pantry phone rooms, reception, storage, copy/print areas and IDF room. Project included demolition of existing TI layout, new lighting, new power to furniture, new power to support AV & IT, new plumbing to coffee bar, new HVAC distribution and minor revision/additions to the existing MEP as required per building codes. Technology scope included new low voltage cabling, audio-visual systems and new security system.
ALFATECH EXPERIENCE
Made with FlippingBook - professional solution for displaying marketing and sales documents online