Culture Qualifications
Woodside Priory Theater
New Construction 16,650 SF Portola Valley, CA TYPE: SIZE:
Provided mechanical, electrical and plumbing engineering services for the new single-story, Performing Arts Center building for the Woodside Priory School. The 400-seat auditorium is used for drama plays and musicals, band performances, orchestra concerts, speakers, large meetings, and occasional social and dinner events. In addition, two support buildings for Orchestra/Choir Rehearsal and Shop are also included. This LEED Certified project features a living green roof to offset energy consumption and to blend with the natural surroundings of the school campus.
Made with FlippingBook - Share PDF online