Culture Qualifications

GUSD, Christopher High School, Performing Arts Center

Gilroy, CA

TYPE: SIZE:

New Construction 21,230 SF; 140,000 SF total

Gilroy Union School District is an ongoing client. One notable project is Christopher High School which achieved Collaborative for High Performance Schools (CHPS) status. Provided mechanical, plumbing, electrical and technology engineering services to create this energy efficient and sustainably designed campus which includes a new two-story performing arts building, classrooms, a cafeteria, and a gym. Phase I of this project received the Award of Excellence at the 2011 Leroy F. Greene Design and Planning Awards. Designed entire campus utilizing the latest technology in integrated lighting control.

Made with FlippingBook - Share PDF online