Vantage McLaren

Santa Clara, CA

TYPE: SIZE:

Data Center, Office 217,200 SF Data Center / 413,000 SF Total

This project included master planning, product development analysis, and schematic design documents of two four-story buildings including a new substation with three 50 MW transformer sections. IT was designed for a new 69 MW critical IT load data center project.

Cyxtera (formerly Century Link) Phase 2

Data Center 50,000 SF Moses Lake, WA TYPE: SIZE:

AlfaTech provided turn-key project management services for this project including design, management, equipment purchasing, construction and commissioning services. The project consisted of a three-story 50,000-square-foot data center, and supports up to 30 MW of electrical load on the site, with an initial ramp of 8mW of hydroelectric power.