Forge Architects.compressed-2

MI XED USE | RETAI L | HOSP I TAL I TY

TRANSBAY TOWER, 101 1 S T STREET – LEED PLATINUM San Francisco, CA Type : Mixed-Use Size : 1.4M SF

The project consists of approximately 1.4 million SF of Class A office space over 60 floors with a building height of 1,070 feet tall. The building was a mix use of office, transportation, retail, and residential uses. As a project manager Marcus Keay was responsible for the design and coordination of the core and shell Mechanical, Electrical, Plumbing and Fire Protection systems. The construction cost for this project was $1.1 billion. The software used was Revit. The project is pre-certified LEED Platinum and is scheduled to be completed in the fall of 2017.

Facebook

* Completed by AlfaTech principal during previous employment

Made with FlippingBook Online document