Inspur Manufacturing Quals - TEST

R E L E V A N T P R O J E C T S

FLEX (FORMERLY FLEXTRONICS) Austin, TX and Milpitas, CA Type: Manufacturing Size: 228,500 SF

The Austin, TX, project included MEP services for the tenant improvement to approximately 225,000 SF of an existing manufacturing facility, to convert the space to contract manufacturing, assembly, and QA/QC testing of electronics products. The Milpitas, CA, project includes tenant improvements to an existing office space (approximately 3,500 SF) in building M9. The scope of work included removal of some existing interior walls and reconfiguration of spaces to provide open office, enclosed office, and conference spaces. The existing power and HVAC systems were reused and reconfigured to accommodate the new cubicle and office layouts. New lighting fixtures were used with the new ceiling grid and reflected ceiling plan. APPLIED MATERIALS Santa Clara, CA Type: Office, Clean Room, Manufacturing, Assembly, Testing, and General Purpose Size: Over 1,000,000 SF Projects: Buildings B1, B2, B3, B6, B7, B8, B9, B11, B12, B14, B15, B20, B81, B100 As a prime contractor, AlfaTech has provided extensive tool hook-up design including; process/chemical, electrical, and mechanical engineering services. AlfaTech completed a major campus consolidation project in Buildings B2, 6, 11, 12, 81, & 100, which required the relocation of more than half the people in SCLA to consolidate and vacate Central & B108. Additionally the project required a clean-up of the Central campus site and buildings for sale. Installation of 200 mm and 300 mm high temperature film (epitaxial) CVD reactors, as well as for ion implantation prototype systems. In addition, AlfaTech performed a feasibility study for a 300 mm RTP lab that included process utility systems, toxic gas abatement and scrubbed exhaust and power distribution to the tools.

Made with FlippingBook - Online Brochure Maker