K-12 Education Qualifications

AlfaTech is a consulting engineering firm offering a range of complementary services and expertise in multiple markets. Our services include: Mechanical and Electrical Engineering Design, Technology, Architectural Lighting Design, Commissioning and Energy Solutions, as well as Sustainability.

K-12 Education

ALFATECH LOCATIONS San Jose, California – HQ | San Francisco, California | Monrovia, California | Orange, California | San Diego, California

INNOVATIVE IDEAS | SUSTAINABLE SOLUTIONS | INTEGRATED PARTNERSHIPS

2023

IFM Group joins VelaTech Holding EDG2 joins VelaTech Holding

2022

Verity Commercial joins VelaTech Holding AlfaTech Asia joins VelaTech Holding

COMPANY PROFILE

2021

Vela Tech Holding, Inc. established

AlfaTech acquired S&K Engineering of Monrovia and LFA Lighting of Ventura. 2020

AlfaTech was established in Silicon Valley in 1987 as a mechanical, electrical, and technology (low voltage, security, and A/V) design engineering firm. Responding to client needs, we expanded our service offerings to include architectural lighting design, sustainability, Smart Building, and project management services. In addition, we expanded into five California offices, including San Jose (Silicon Valley), San Francisco, Monrovia, Orange and San Diego. AlfaTech is gaining ground through organic, merger, and acquisition growth. Establishing Vela Tech portfolio with parent company RSBG, our services reach the West Coast to the Midwest and the East Coast from partner offices in Seattle, Chicago, Reston, and Edison. We also have an international presence with offices throughout Europe, Asia, North Africa, and the Middle East. AlfaTech has a solid reputation forged by a corporate commitment to enduring client relationships and service excellence. We provide complete design, design-assist, and design/build project delivery services. Our project experience includes core and shell, tenant improvements, upgrades, repositioning, and restacks. Each AlfaTech project aims to achieve maximum energy performance, resource conservation, and pollution reduction, resulting in the highest energy savings and sustainability at all design phases while creating a balance of preservation, constructability, schedule, and budget. Given the dynamic nature of what we do, our AlfaTech teams are active listeners, and together with their focus on client and partner relations, are true team players.

2018

AlfaTech partners with RAG Stiftung adding strength of 65+ offices throughout Europe, Asia, Middle East, and Africa.

Celebrates 30 Years Success! 2017

30Y

2006 - 2017

AlfaTech expands Regionally Expands San Francisco Office Opens LA Office Opens San Diego Office AlfaTech Expands Services Architectural Lighting Design Sustainability / LEED and Energy Solutions

2004

AT-PD founded

2003

Named one of the Top 100 Largest Private Companies in San Francisco.

2000

Named one of the Top 100 Fastest Growing Companies in Silicon Valley.

Merges with S&H and MPL. Opens San Francisco office 1996

1987

Jeff Fini, PE, founds AlfaTech MEP & Technology Design in Silicon Valley

LOCATIONS ALFATECH is part of Vela Tech Holding portfolio of companies

VELA TECH HOLDING

AT-PD San Francisco, California Monrovia, California Orange, California San Diego, California VERITY COMMERCIAL Seattle,Washington ALFATECH USA San Jose, California San Francisco, California Chicago, Illinois Reston, Virginia Edison, NewJersey EDG2 Bethesda, Maryland Phoenix, Arizona IFM GROUP San Ramon, California San Diego, California

ALFATECH ASIA Singapore Tokyo, Japan Shanghai, China

Australia Malaysia

SISTER COMPANIES

EUROPE Vienna, Austria Kornberg, Austria Saint-Cannat, France Berlin, Germany

ASIA Dhaka, Bangladesh Tangail, Bangladesh Jakarta, Indonesia Amravati, India Chengalpattu, India Dehradun, India Gandhinagar, India Gujarat, India Mumbai, India New Delhi, India Pune, India Ratnagiri, India Solapur, India Tamil Nadu, India

Bitterfeld, Germany Bochum, Germany Darmstadt, Germany Dresden, Germany Dusseldorf, Germany Eisenhüttenstadt, Germany Erfurt, Germany Essen, Germany Frankfurt am Main, Germany Freiburg, Germany Greifswald, Germany Großostheim, Germany Hamburg, Germany Karlsruhe, Germany Kassel, Germany Köln, Germany Kronberg im Taunus, Germany

Yavatmal, India Lao PDR, Laos Makati City, Philippines Singapore Bangkok, Thailand Ho Chi Minh City, Vietnam

Leipzig, Germany Mainz, Germany Mannheim, Germany Munich, Germany

AMERICAS Toronto, Canada Bogotá, Colombia Bosque de chapultepec, Mexico Lima, Peru

Nuremberg, Germany Regensburg, Germany Ribnitz-Damgarten, Germany

MIDDLE EAST Abu Dhabi, UAE

Rostock, Germany Stralsund, Germany Stuttgart, Germany Wiesbaden, Germany Wirges, Germany Würzburg, Germany Athens, Greece Milan, Italy Podgorica, Montenegro Belgrade, Serbia Birmingham, UK Bishop‘s Stortford, UK Bristol, UK Chamberlain, UK Croydon, UK Exeter, UK Leamington Spa, UK Leeds, UK London, UK Luton, UK Manchester, UK Mold, UK Nottingham, UK Stockport, UK Sunderland, UK Wakefield, UK Warwickshire, UK

Al Ain, UAE Dubai, UAE

Madinat Zayed, UAE Ras Al Khaimah, UAE Jeddah, Saudi Arabia Riyadh, Saudi Arabia Al-Zahra City, Gaza Strip Amman, Jordan Baghdad, Iraq Doha, Qatar Istanbul, Turkey Kuwait Sharq, Kuwait Muscat, Oman

AFRICA Algier, Algeria Alexandria, Egypt

Assiut, Egypt Cairo, Egypt Giza, Egypt Dar es Salaam, Tanzania Tunis, Tunisia

Kampala, Uganda Khartoum, Sudan

ALFATECH ENGINEERING

ENGINEERING STUDIO We provide the most advanced, professional engineering services that ensure buildings thrive. We partner with clients to turn their visions into a tangible reality. As one of the leading MEP consultants in the Western U.S., AlfaTech strives to improve the life of hundreds of thousands of Americans every day through the buildings we design. Coining the expression “Innovation & Excellence,” we provide the most advanced, professional engineering services that ensure buildings thrive. We partner with clients to turn their visions into a tangible reality.. To us, conscious design elements are indispensable in meeting the escalating expectations emerging within vibrant and diverse typologies. We believe the highest-efficiency buildings transpire from mirroring the sustainable features inherent to the world around us. Propelling cutting-edge solutions requires a thoughtful design that can interact with the physical environment. Elements like smart buildings, reduced reheat, and synergies before waste initiate perpetual savings. Eager to do our part, we pride ourselves on designing state-of-the-art facilities that reach unprecedented levels of integration. We think that sustainable design is more than just a phrase. It is a perspective. We are committed to rock-solid partnerships with our clients by delivering on our promise always to excel.

OCCUPANCY

DESIGN

CONSTRUCTION

END OF USE

SUSTAINABLITY

PROCESS ENGINEERING DESIGN

MECHANICAL ENGINEERING DESIGN

ELECTRICAL ENGINEERING DESIGN

ARCHITECTURAL LIGHTING DESIGN

TECHNOLOGY

COMMISSIONING / ENERGY SOLUTIONS

RETRO COMMISSIONING

LIFE OF A BUILDING

ARCHITECTURAL LIGHTING DESIGN Lighting and Lighting Controls Lighting Calculations Customized ROI Calculations Sustainable Lighting Design Energy Savings Analysis Custom Lighting Fixtures Custom Lighting Fixtures Design

COMMISSIONING & ENERGY SOLUTIONS Early Quantifiable Energy Study Incentives Energy Star® Assessments Retro-commissioning (RCx) Monitoring Brand Continuous Commissioning (MBCCx) ASHRAE Level 1, 2 and 3 Energy Audits Measurement and Verification (M&V) of installed projects Energy Modeling Net Zero Energy Budgeting HVAC/Chilled Water Plant Optimization SUSTAINABILITY Sustainability Planning (Organizational and Infrastructural) LEED / Green Building Consulting Masterplanning Life Cycle Cost Assessment Occupant Wellness and Comfort Façade Engineering CFD / Wind Studies Wind Studies Thermal Stratification Studies Energy Concept Studies

ELECTRICAL ENGINEERING DESIGN Power Systems Emergency & Standby Power Lighting and Lighting Controls Security Systems 24 / 7 Power Systems (UPS) Power Monitoring Systems Toxic Gas Monitoring Graphic Control and Alarm Panels Grounding and Bonding Industrial Hygiene Systems Low Tolerance Temp Control Title 24 Analysis and Design Heat Recovery Systems Central Utility Plants Air Handlers HVAC System Controls PLC Programming Fire Protection and Plumbing MECHANICAL ENGINEERING DESIGN HVAC Heating Systems Water and Gas Cooling Systems / Chilled Water Dehumidification Systems Contamination Sensitive Areas

TECHNOLOGY CONSULTING AND DESIGN

Low Voltage Design Audio Visual Design

Security Systems Design Architectural Acoustics Wireless Design & Modeling

Distributed Antenna Systems (DAS) Integrated Building Management Systems BMS Network Integration Telco Facilities and Services Voice Systems and Applications Relocation & Data Center Migration Services Strategic Planning and Analysis Project Management Management Consulting

Energy Management Energy Conservation Fire Alarm Systems Public Address Systems Plug Loads Control

ALFATECH PROJECT EXPERIENCE

ALFATECH Northern California

Milpitas USD, Mabel Mattos Elementary School

Milpitas, CA

TYPE: SIZE:

New Construction 63,500 SF

AlfaTech provided mechanical, electrical and plumbing engineering design for the new Mabel Mattos Elementary School which is in the Milpitas Unified School District. The neighborhood is in Milpitas and serves 800 Prek- 5 students. The new school is 63,500 SF and being built as a center for “22 nd century learning” with classrooms referred to as learning communities that support 96 to 120 students with four to five teachers leading a grade level. Phase 2 of this project encompassed three (3) new two-story buildings, classrooms C, D and E as well as a multi purpose/kitchen in building F and 30’x40’ lunch canopy. Services included HVAC, plumbing including site gas piping, electrical limited to power, lighting, site lighting and path of travel, fire alarm, clock paging system and IT data cabling and Title 24 for the MEP systems.

AlfaTech also provided electrical engineering services for eight (8) 24’x40’ interim classroom portables

Learning by Design Outstanding Project, 2021

East Side UHSD, Santa Teresa High, Learning Center & Building 800

San Jose, CA

TYPE: SIZE:

New Construction 20,500 SF

AlfaTech is providing mechanical, electrical and plumbing engineering design for the new 9,650 SF learning center and classroom building which will provide social and emotional spaces along with an educational resource to students. It features a learning resource center, café, counseling and break out rooms with the addition of three studio classrooms. The building will serve as a beacon in the center of campus and host a learning resource center, counseling and tech support offices, and two classrooms for digital art or science programs.

AlfaTech is also providing mechanical, electrical and plumbing engineering design for the modernization of Building 800, into a 3,500 SF maker’s space, digital media and science classrooms. 9,600 SF

East Side UHSD, Evergreen Valley High School, Performing Arts Center

San Jose, CA

TYPE: SIZE

New Construction 50,000 SF

AlfaTech provided mechanical, plumbing, electrical, & lighting engineering for a new one-story performing arts center for Evergreen Valley High School in the East Side Union High School District. The new two-story Visual Art building of roughly 24,000 SF and multi-purpose building approximately 26,000 SF has a 493-seat capacity auditorium with audio, sound, lighting, acoustics, and orchestra pit. Other amenities include space for band, choral room, dance, television studio, costume instruction and preparation, dressing rooms, ticket office, and public restrooms.

East Side UHSD, Silver Creek High School, Building K

San Jose, CA

TYPE: SIZE:

New Construction, Design-Build 20,000 SF

AlfaTech provided mechanical, electrical, plumbing and fire alarm engineering for a new classroom building K for East Side Union High School District’s Silver Creek High School. The project consists of building a new 20,000 SF two-story classroom and will be completed as a design build team partnership with Rodan Builders, CAW Architects and others.

East Side UHSD, Piedmont Hills High School, Gymnasium

San Jose, CA

TYPE: SIZE:

New Construction 10,000 SF

AlfaTech provided mechanical and plumbing engineering services to the Piedmont Hills High School Gym. The project consists of a new one-story auxiliary gymnasium approximately 10,000 SF that received a HVAC and plumbing engineering services evaluation.

Campbell UHSD, Performing Arts Centers San Jose, CA

TYPE: SIZE: Five schools, 45,000 SF total New Construction

AlfaTech provided mechanical, plumbing, electrical, and technology engineering services for five new performing arts centers on the campuses of Branham High School, Leigh High School, Del Mar High School, Prospect High School, and Westmont High School. Each performing arts center is a new theater complex of 9,000 SF for 200-seat capacity with lobby, seating, main stage, backstage area, green room, changing rooms, AV control room, and all necessary supporting areas. Energy efficient “green building” Collaborative for High Performance Schools (CHPS) requirements were incorporated into the base of MEP design, and AlfaTech provided MEP document requirements for CHPS certification to the LEED consultant. AlfaTech also provided MEP engineering for five other schools in the CUHSD.

Fremont Union High School District

Cupertino, CA

TYPE: SIZE:

Various Projects Three Schools

Projects that have been completed by the firm for Fremont Union High School District have encompassed electrical and low-voltage design for numerous schools and a swimming pool facility at Lynbrook High School.

Projects : • Lynbrook High School • Cupertino High School • Fremont High School

Gilroy USD, Christopher High School

Gilroy, CA

TYPE: SIZE:

New Campus 140,000 SF

AlfaTech completed MEP design for the new 140,000 SF Gilroy Unified School District’s Christopher High School and was recognized by the Collaborative for High Performance Schools (CHPS). The campus includes classrooms, a cafeteria, a gym, and a performing arts building.

Phase I of this project received the Award of Excellence at the 2011 Leroy F. Greene Design and Planning Awards.

San Francisco Friends School

San Francisco, CA

TYPE:

Historic, Change-Use

SIZE: ACCREDITATION LEED Silver 80,000 SF

Awards: •

The firm provided services for this extensive change-use project, a retrofit of the original Levi Strauss building that transformed it from factory to an 80,000 SF K-8 school. Built in 1906, the factory required substantial updates, but the historical integrity of the building was retained. This 3-story structure includes a cafeteria, classrooms, admin spaces, a library, a gym, and a theater. Notable sustainable features include four thermal towers and a radiant heating system, both controlled by a BMS. The project achieved LEED Silver

Energy and Sustainability Design Citation Award AIA SF Design Awards, 2009 One of the City's Top Green Projects Office of the Mayor and AIA SF, 2009 Award of Merit AIA CC Savings by Design Awards, 2009

Children’s Day School, St Joseph’s Hall

San Francisco, CA

TYPE: SIZE: 23,000 SF

Tenant Improvement

AlfaTech provided mechanical, electrical, plumbing, and sustainable design for the renovation and classroom additions of the three- story, 23,000 SF St. Joseph’s Hall, which is located at the Children’s Day School in San Francisco. The project consisted of interior and central core renovations, as well as capital repairs to the building.

San Francisco USD, Willie L. Brown Jr. Middle School

San Francisco, CA

TYPE: SIZE

New Construction 70,000 SF

AlfaTech was provided mechanical, electrical, plumbing, technology and solar photovoltaic engineering design services for “bridging” design and related services for a new Willie L. Brown Jr. Middle School. Part of the San Francisco Unified School District, Willie L Brown is located at 2055 Silver Avenue in the Bay View District of San Francisco. The new approximately 70,000 SF middle school replaces an existing school site complex located at the same address that was demolished. The new facility was constructed under a design-build construction delivery method. AlfaTech provided MEP and Technology documents up to level in order to assist design-build contractors in predesign development paring their engineered design build construction documents for DSA approval. The MEP/Technology design-build contractor will be the engineer of record.

Bellarmine College Preparatory High School, Sobrato Center

San Jose, CA

TYPE: SIZE: ACCREDITATION:

New Construction 45,000 SF

LEED Gold

The Sobrato Center for Humanities & the Arts is a 45,000 SF building dedicated to the school’s Art and Music programs and features a thrust-stage and 440-seat theater. The theater facilities also include an orchestra pit, fly space, full off- stage space, and a full shop for set building. A second “Black Box” theatre, which is used for smaller and more experimental productions, Sanguine Humours performances, and student-directed or student-written one-act plays, seats between 90 and 130 people.

San Francisco Unified School District

San Francisco, CA

TYPE: SIZE:

New Buildings, Modernizations Three Schools

Projects for the San Francisco School District have included new construction and modernizations, HVAC, and build review.

Projects : • Dianne Feinstein Elementary • DeAvila Elementary • John F. Kennedy Elementary

San Jose USD, Gunderson High School Gymnasium

San Jose, CA

TYPE:

Evaluation

AlfaTech provided evaluation for the existing fain coil units and the mechanical and structural engineering design for two new rooftop air handling units at the Gunderson High School gymnasium.

San Jose USD, Broadway High School, Classroom Building

San Jose, CA

TYPE: SIZE: ACCREDITATION:

New Construction 3,840 SF

Targeting LEED Gold

AlfaTech provided mechanical, electrical and plumbing engineering services for San Jose Unified School District’s Broadway Hi gh School. The new one-story building is 3,840 SF with a Multi-use / Dining room, warming servery, restrooms and storage. This project is targeting LEED Gold status.

Alum Rock Union School District

San Jose, CA

TYPE: SIZE:

Mechanical System Upgrades, Modernization Eight Schools

The firm completed multiple projects for Alum Rock Union School District, including mechanical system improvements for the overall modernization program. AlfaTech provided engineering services for the assessment of six middle schools and 18 elementary schools. Our services included review of drawings, site surveys and reviews of existing conditions, reports, recommendations, and a final report with the District’s feedback.

Projects : • Arbuckle Elementary School • Dorsa Elementary School • Mathson Middle School • Pala Middle School • Lester Shields Middle School • Myer Elementary School • San Antonio Elementary School Fire Alarm System • Union Elementary School Restroom Upgrade

Berryessa Union School District

San Jose, CA

TYPE: SIZE:

Various Modernizations Ten Schools

Projects for Berryessa USD have included mechanical, electrical, and plumbing systems improvements. The firm completed these projects as one contract with the District. Laneview Elementary was recognized by the Collaborative for High Performance Schools (CHPS).

Projects : • Brooktree School • Cherrywood School • Laneview School • Northwood School

• Piedmont Middle School • Sierramont Middle School • Summerdale School • Toyon Elementary School • Vinci Park School • Youth Center

Berryessa USD, Summerdale Elementary School

San Jose, CA

TYPE:

Modernization

AlfaTech provided mechanical and plumbing engineering design services to the Berryessa Union School District, Summerdale Elementary School. The modernization of the school included new exhaust fans and plumbing fixtures, duct modifications, new drinking fountains, new sinks and faucets, and a new atrium area.

Union School District, District Upgrades

San Jose, CA

TYPE: SIZE:

Tenant Improvement 483,000 SF

Provided design of new Voice Evac fire alarm system for nine (9) schools in the Union School District

Projects : • Alta Vista - 42,400 SF • Athenour – 41,000 SF • Carlton – 44,700 SF • Dartmouth – 95,400 SF • Guadalupe – 42,500 SF • Lietz – 44,600 SF • Noddin – 45,200 SF • Oster – 51, 300 SF • Union – 76,200 SF

Fremont UHSD, Cupertino High School, Gym & Locker Room

Cupertino, CA

TYPE: SIZE:

Modernization 33,700 SF

AlfaTech provided electrical engineering design services to the Cupertino High School Gym and Locker Rooms. The 16,600 SF Large Gym and 17,100 SF Locker Room received an electrical power modernization. Services include fire alarms, paging, and clock systems. Both buildings also received an Interior and exterior general lighting system, Load calculations and power connection to the pool equipment was also provided.

Santa Clara USD, Santa Clara High School, Gymnasium

Santa Clara, CA

TYPE:

Modernization

AlfaTech provided mechanical, electrical, and plumbing engineering and technology services for the modernization the Santa Clara Unified School District’s Santa Clara High School. Services included modernization of the large and small gymnasium. The proj ect required DSA approval.

Santa Clara USD, Santa Clara High School, Buildings B, C & D

Santa Clara, CA

TYPE: SIZE:

Modernization 101,500 SF

AlfaTech provided mechanical, electrical, plumbing, telecom/technology, and fire protection engineering services for the modernization the Santa Clara Unified School District’s Santa Clara High School. Services were conducted on classroom buildin gs B, C, & D on the campus.

Santa Clara USD, Peterson Middle School, Buildings D, E & H

Santa Clara, CA

TYPE: SIZE:

Modernization 23,520 SF

AlfaTech provided mechanical, plumbing, electrical, and telecom/technology engineering services for the Santa Clara Unified School District’s Peterson Middle School. Services include the modernization of Science Building D, Classroom Building E, and Classroom Building H.

Santa Clara USD, Buchser Middle School

Santa Clara, CA

TYPE: SIZE:

Tenant Improvement 21,749 SF

AlfaTech provided mechanical, electrical and plumbing engineering and low voltage design services for the modernization of the main gym at Buchser Middle School Main Gym. The gym also received Title-24 commissioning services. Project required DSA approval.

Santa Clara USD, Wilcox High School, Buildings A & B

Santa Clara, CA

TYPE:

Modernization

AlfaTech provided mechanical, electrical, fire protection, and technology engineering services for the modernization of Santa Clara Unified School District’s Wilcox High School. Buildings A and B (classrooms and administration building) received site utilities, site survey and review of existing conditions, contract documents and specifications, documentation for DSA approval, bidding assistance, and construction administration services.

Santa Clara USD, Wilcox High School, Gym

Santa Clara, CA

TYPE:

Modernization

AlfaTech provided mechanical engineering design services to the Wilcox High School Gym. The mechanical system redesign took place in office G130. A CO2 sensor was installed at the return air duct, and power and telephone/ data installed in Locker Building H. Gas and water redesign and coordination were also completed.

Santa Clara USD, Wilcox High School, Building R

Santa Clara, CA

TYPE: SIZE:

Modernization 33,000 SF

AlfaTech provided MEP, telecom/technology, and fire protection engineering services for the Santa Clara Unified School District’s Wilcox High School. This new three -story classroom building R required demolition of the existing music building and demolition of the end of building C for fire access and related site work.

Pajaro Valley USD, Watsonville High School

Watsonville, CA

TYPE:

Seismic Retrofit

AlfaTech provided seismic retrofit engineering services to the Watsonville High School Gym. The building K retrofit includes converting the former locker room spaces into student and staff spaces, reconfiguring the heating and cooling systems, providing power and low voltage to these new spaces, upgrading the fire alarm, and repurposing the spaces continued efficient school use.

Los Gatos USD, Fisher Middle School

Los Gatos, CA

TYPE: SIZE:

New Construction 15,000 SF

AlfaTech provided mechanical, electrical, plumbing, and fire protection engineering design services for Fisher Middle School. This project included a new 5,000 SF gym addition at the west edge of existing gym including a large moveable wall partition for separation of the two gyms, as well as renovation of the 10,000 SF existing gym. The expanded gymnasium will accommodate up to 1,400 spectators in new bleacher seating dividable by an operable partition at the line of the addition. Main entry doors were relocated, and new restrooms provided adjacent to the entry area. New vertical braces introduced to support the expanded structure and upgrades to HVAC, electrical power, lighting data and signal. New basketball backstops, bleachers, flooring, acoustical treatment, clerestory windows and skylights. The locker room building was demolished and a new 6,500 SF free standing modular locker room with coaches’ offices and studen t restrooms was built at the south edge of the gymnasium. At the east edge of the site, a new 5,000 dance studio and fitness center was built. A new 4,000 SF steel and wood canopy was added to connect the gymnasium entrance and the Dance Studio/Fitness Center. Site work included new landscape and walkway plaza at the west end of the gymnasium and east entrance. Blacktop play area was expanded by 20,000 SF with new exterior play courts and new campus perimeter fencing and rolling gate at the canopy covered walkway. Required DSA review and approval.

Mountain View / Whisman School District

Mountain View, CA

TYPE: SIZE:

Various Projects Four Schools

The firm provided engineering design services for renovation and new construction of the Mountain View Whisman School District. The projects at these schools required engineering services for technology, mechanical, plumbing, and electrical, with emphasis on energy-efficient HVAC systems.

Projects : • Crittenden Middle School

• Monta Loma Elementary School • Theuerkauf Elementary School • Whisman Elementary School

Mountain View / Whisman SD, Graham Middle School (Phase II)

Mountain View, CA

TYPE: SIZE:

Addition and Modernization 17,211 SF

AlfaTech provided mechanical, electrical, plumbing engineering and data cabling services for Phase II addition and modernization of Graham Middle School toward the needs of the 21st century. Project included the conversion of the administration building into a 3,063 SF flexible library/student lounge space with covered patio, alterations to the 2,800 SF staff lounge including addition of student and staff restrooms, conversion of a shade structure to 5,548 SF hi-tech multipurpose room, and new construction of an 8,500 SF, 2-story classroom building with six classrooms that share a collaboration space through folding glass walls.

Morgan Hill Unified School District

Morgan Hill, CA

TYPE: SIZE:

Roofing, HVAC Upgrades Three Schools

AlfaTech provided mechanical and electrical services for the replacement of the existing rooftop HVAC in kind with new rooftop package units, replacement of existing controls with new direct digital control system and miscellaneous electrical work to disconnect the existing power and design new power for the new equipment. Roofing design scope of work included coordination for demolition and replacement of existing roofing system including preparation for re-roofing.

Projects : • Jackson Elementary School • Nordstrom Elementary School • Paradise Valley Elementary School

Santa Clara USD, Peterson Middle School

Sunnyvale, CA

TYPE:

Modernizations

Gym, Locker Room Size: 36,020 SF

Gym, Lobby Size: 21,000 SF

AlfaTech provided electrical engineering design services to the Peterson Middle School's Locker Room and Gymnasium. New fire alarm systems were designed for the existing 14,800 SF Locker Building M and 21,000 SF Gymnasium Building N. Building L received two restrooms totaling 220 SF, a fire alarm system, paging/clock, telephone/data, and security system. The new fire alarm system will be connected to the campus's existing system.

AlfaTech provided electrical engineering design services to the Peterson Middle School Gym. The 21,000 SF facility received new lighting in the gym and main lobby area. A new lighting system includes fixture specifications, circuitry, associated control, and Title 24 prescriptive calculations.

Los Altos Unified School District

Los Altos, CA

TYPE SIZE:

Various Projects Nine Schools

The firm performed engineering studies for the Los Altos Unified School District. Services included budget preparation, to obtain bond-issued project funding, which included modernization of MEP systems

Projects : • Almond Elementary School • Bullis Elementary School • Blach Middle School • Covington Elementary School • Egan Middle School

Los Altos USD, Los Altos High School Fitness Center

Los Altos, CA

TYPE: SIZE:

Tenant Improvement 17,800 SF

AlfaTech provided electrical engineering services to the new Los Altos High School’s Fitness Center. The 15,500 SF complex features locker rooms, team rooms, a wrestling room, coaches’ offices, staff, student restrooms, and an additional 2,300 SF new girls team room and storage space.

San Mateo-Foster City SD, Bowditch Middle School

Foster City, CA

TYPE:

Master Planning Assessment

AlfaTech provided mechanical, electrical, and plumbing engineering services for the San Mateo-Foster City School District. Services included a master planning assessment of Bowditch Middle School.

Bayshore ESD, Districtwide Master Planning

San Mateo, CA

TYPE:

Master Planning Assessment

SIZE:

2 Schools

AlfaTech provided mechanical, electrical, and plumbing engineering services for the Master Planning assessment of Bayshore Elementary School District. Schools included Bayshore Elementary School and Robertson Intermediate School.

San Mateo Union High School District

San Mateo, CA

TYPE: SIZE:

New Buildings, Modernizations Six Schools

The firm has provided engineering design services for San Mateo Unified High School District that has encompassed numerous schools. The firm has provided the District with technology master programming and with mechanical, electrical, and plumbing standards. The firm also provided the design for their modernization and new buildings for Aragon High School, Capuchino High School, Hillsdale High School, and Mills High School.

Projects : • Aragon High School • Burlingame High School • Capuchino High School • Hillsdale High School • Mills High School • San Mateo High School

Berryessa USD, Piedmont Middle School Campus, HVAC

Piedmont, CA

TYPE: SIZE: 73,400 SF

HVAC/Roofing

AlfaTech provided MEP services to assist Berryessa Union School District with the replacement of HVAC units and roofing for several buildings on the Piedmont Middle School campus. The scope included replacement of the existing equipment in the mechanical rooms' rooftop units, replacement of existing controls with a new direct digital control system, and miscellaneous electrical work to disconnect the existing power and to design new power for the new equipment. AlfaTech coordinated with the roofing consultant to incorporate and coordinate the HVAC replacement. The existing conduits and power panels were removed and reinstalled in the same locations on the roof.

Fortuna UHSD, Fortuna High School

Fortuna, CA

TYPE:

Modernization

AlfaTech provided mechanical, electrical, plumbing engineering and audio-visual design services for the Fortuna High School modernization project. This project included modernization to both Damon and Logan gymnasiums, as well as the sports fields, football, track, bleachers and press box, design of stadium lighting for football field, lighting for pathway and parking lot, design for power, fire alarm and low voltage for modular press box, scoreboard and audio system for press box & both gyms, Title 24 analysis and documentation for the gymnasiums, football field lighting, High Performance Incentive (HPI) Grant documentation and DSA approval

Winters Joint USD, Master Planning Assessment

Winters, CA

TYPE: SIZE:

Master Planning Assessment Six Schools

AlfaTech provided mechanical, electrical, and plumbing engineering services for the Master Planning assessment of Winters Joint Unified School District, which includes 6 schools.

Projects : • Waggoner Elementary School, • Shirley Rominger Intermediate School • Winters Middle School • Winters High School • Wolfskill Continuation High School • Winters High School

Sequoia UHSD, Carlmont Performing Arts Center

Belmont, CA

TYPE: SIZE: ACCREDITATION:

Tenant Improvement 25,000 SF LEED Gold

This new high school music and art building includes art galleries, music practice rooms, photo classroom with darkroom, art and ceramics studios, office space, and storage. The 496-seat Main Theater and the 76-seat Studio Theater are equipped with high performance audio visual and stage lighting. Sustainability features include 40 kW solar PV.

Cupertino Union School District

Cupertino, CA

TYPE: SIZE: Nineteen Schools

Various Modernizations

The firm was selected to provide district-wide modernization of both existing and new facilities for 20 schools in the Cupertino Union School District as part of the SB-50 bond measure. Services included mechanical, electrical, plumbing, low-voltage systems, energy management systems, and lighting upgrade. Upgraded facilities include classroom, modular, kitchen, auditorium, and administrative spaces. Previous projects included mechanical, electrical, and plumbing renovations and design for various schools. These includes the Joaquin Miller’s new administration and library building, Lincoln’s new library and renovation of size buildings, McAuliffe’s modernization of six buildings, and Sedgwick’s five new buildings.

Projects: • Blue Hills Elementary School • Carol Murdock Elementary • Collins Elementary • De Vargas Elementary School • Dilworth Elementary School • Eisenhower Elementary School • Faria Elementary School • Joaquin Miller Jr. Middle School • John Muir Elementary School • Lincoln Elementary School • McAuliffe Elementary School • Meyerholz Elementary School • Montclaire Elementary School • Nimitz Elementary School • Portal Elementary School • Regnart Elementary School • Sedgwick Elementary School • Stocklmeir Elementary School • West Valley Elementary School

San Jose Unified School District

San Jose, CA

TYPE: SIZE: Twenty Schools

Various Modernizations

The firm has completed multiple projects for the San Jose Unified School District that have encompassed numerous schools, as well as the District’s administrative offices. Mechanical, electrical, and plumbing system improvements were part of an overall renovation program, with the exception of Ernesto Galarza Elementary and Broadway Continuation High School, which were new schools. The design included an electrical system for interim housing.

Projects: • District Offices • Allen Elementary School

• Almaden Elementary School • Ann Darling Elementary School • Booksin Elementary School

• Broadway High School • San Jose High School

• Carson Elementary School • Edwards Elementary School • Empire Gardens Elementary • Grant Elementary School • Graystone Elementary School • Los Alamitos Elementary • Randol Elementary School • Reed Elementary School • River Glen Elementary School • San Jose Elementary School • Schallenberger Elementary School • Simmonds Elementary School

• Terell Elementary School • Willow Glen High School

ALFATECH Southern California

SPUSD, South Pasadena Unified School District, District Upgrades

South Pasadena, CA

TYPE: SIZE:

Mechanical Assessments Five Schools

The firm provided mechanical, electrical and plumbing engineering services to all 5 schools throughout the South Pasadena Unified School District. At each site we are upgrading all HVAC equipment with newer, more energy efficient equipment. The high school and middle school included new chillers and pumping systems as well as new controls to maximize energy efficiency.

Projects : • South Pasadena High School • South Pasadena Middle School • Arroyo Vista Elementary School • Morengo Elementary School • Monterey Hills Elementary School

SPUSD, Marengo Elementary School

South Pasadena, CA

TYPE: SIZE:

Modernization 4,340 SF

The firm provided utility connections and designed the MEP system in the South Pasadena Unified School District’s Marengo Elementary School. Services to the new buildings included air conditioning to each classroom, lighting and power to each classroom, and plumbing connections. The project consist of three new modular classroom buildings which will house two standard size classrooms and one Arts classroom. The total square foot of the project is approximately 4,340 SF. This project required DSA approval.

SPUSD, Arroyo Vista Elementary School, Classrooms

South Pasadena, CA

TYPE: SIZE:

New Construction 5,280 SF

This project consist of five new modular classroom buildings for the South Pasadena Unified School District’s Arroyo Vista Elementary School. Services included four standard classrooms and an arts classroom. The total square foot of the project is approximately 5,280 SF. The firm provided utility connections and designed the MEP system in the new buildings such air conditioning to each classroom, lighting and power to each classroom, and plumbing connections. This project required DSA approval.

SPUSD, Monterey Hills Elementary School, Modular Buildings

South Pasadena, CA

TYPE: SIZE:

New Construction 9,600 SF

The firm provided engineering design services to the South Pasadena Unified School District’s Monterey Hills Elementary Schoo l. This new two-story modular classroom buildings will contain seven standard size classrooms, a larger arts classroom, a restroom module, and a 960 SF teacher workroom. The firm provided utility connections and designed the MEP system in the new buildings such air conditioning to each classroom, lighting and power to each classroom, and plumbing connections. The total square foot of the project is approximately 9,600 SF plus an elevator. This project required DSA approval

CJUHSD, Chaffey High School, Math & Science Building

Ontario, CA

TYPE: SIZE:

New Construction 50,000 SF

The firm provided mechanical, electrical, and plumbing engineering design services to the Chaffey Joint Union High School District’s Chaffey High School. The new mathematics and science building E consists of three floors and a total of approximately 50,000 SF and has 18 state-of-the-art classrooms and 12 science labs. The new science labs and technology will allow the District to move toward the direction of STEM. The HVAC system consists of two large packaged rooftop units which were selected due to budget constraints and space issues. They serve a Variable Volume Hot Water Reheat system with state-of-the-art Direct Digital Controls. The building also includes several laboratory classrooms with fume hood exhaust. Electrical systems include high efficiency LED lighting and state of the art lighting controls. Daylighting and daylighting controls are also included.

CJUHSD, Chaffey High School, Gardiner W. Spring Auditorium

Ontario, CA

TYPE:

Historic, Modernization

The firm provided engineering design services to the Chaffey Joint Union High School District’s Chaffey High School. The modernization to the Gardiner W. Spring Auditorium at Chaffey High School included a historical restoration and rehabilitation of the exterior, theatrical and acoustical upgrades, new catwalk and steel stairway, addition of two new elevators, accessibility upgrades, lobby restroom expansion, and finish improvements throughout the interior/exterior. The firm provided new central plant with chilled (200 tons) and hot water capacity to serve three new Air Handling Units. We were able to do this and preserve the building’s historical integrity. We also maintained the use of existing wall convection cabinet heaters.

PUSD, District Upgrades

Pomona, CA

TYPE: SIZE: 35 Sites

Mechanical Assessment

The firm provided site visits and assessments of 35 sites throughout the Pomona Unified School District in Pomona, CA. At each site we conducted a survey and assessment of the HVAC equipment to ascertain the suitability of replacement with newer, more energy efficient equipment. Work was prioritized and energy efficiency calculated to assist the District in obtaining Prop. 39 funds.

Mayfield Senior School

Pasadena, CA

TYPE:

Renovation

The firm provided mechanical, electrical and plumbing engineering design services for the renovation of the existing school and a new gymnasium facility at Mayfield Senior Independent college preparatory School for young women grades 9 - 12.

AUSD, Holly Avenue Elementary School, Modular Classroom

Arcadia, CA

TYPE SIZE:

New Construction 16,400 SF

AlfaTech is providing mechanical, electrical and plumbing engineering design services for this new 2-story modular building for Holly Avenue Elementary School. Part of Arcadia Unified School District, the classrooms and restrooms and an elevator total 16,400 SF. Scope includes providing electrical connection to the modular from the site electrical distribution system, and fire alarm design.

MUSD, Joseph Gascon Elementary School

East Los Angeles, CA

TYPE: SIZE:

HVAC Upgrades 37,000 SF

This is a new $7.5 million building for the Montebello Unified School District’s Joseph Gascon Elementary School. We provided complete Mechanical, Electrical, and Plumbing engineering services. The building is primarily classrooms in a two-story structure of approximately 37,000 square feet. A Head Start program is also included in the building. Twenty-eight new classrooms are being provided. The project was submitted to and approved by DSA. The HVAC system consists of small packaged rooftop heating/cooling rooftop units. The units have two compressors each which is unusual for this size (four tons) equipment. However, this does provide redundancy for each classroom and outstanding cooling efficiencies. The Head Start area consists of kitchens as well as training facilities.

High efficiency lighting is provided throughout the building along with state-of-the-art lighting controls.

RUSD, Harrison Elementary School, Classroom Building

Riverside, CA

TYPE:

New Construction

The firm provided engineering design services for the Riverside Unified School District's Harrison Elementary School. The project consists of a new one-story classroom building and modernization of various HVAC, plumbing and electrical systems. This new classroom building will consist of 5 classrooms, two of which will be dedicated to special education. We also provided electrical and IT connections to five modular builds located on the campus.

RUSD, Magnolia Elementary School

Riverside, CA

TYPE:

New Construction, Systems Modernization

The firm provided engineering design services to Riverside Unified School District’s Magnolia Elementary School. The project consists of a new two-story classroom building and modernization of various HVAC, plumbing and electrical systems, along with relocating 4 portable classrooms. We provided utility connections and designed the MEP system in the new buildings such air conditioning to each classroom, lighting and power to each classroom, and plumbing connections.

PUSD, Sierra Madre Elementary School

Sierra Madre, CA

TYPE:

HVAC Upgrade

AlfaTech is providing electrical engineering services for the Pasadena Unified School District’s Sierra Madre Elementary Scho ol. Services included power upgrades to the HVAC units and replacement power to new main chiller. Scope includes power distribution from existing outdoor switchboard and motor control center, power distribution to chiller/pumps, and new power panels.

PSUSD, Raymond Cree Middle School

Palm Springs, CA

TYPE:

HVAC Upgrade

The firm replaced the existing chillers/cooling tower and provided a new 300-ton central plant with new water-cooled chillers to the Palm Springs Unified School District’s Raymond Cree Middle School.

Services included a new two-cell cooling tower and variable speed chilled water pumping was installed. We replaced the existing multi-zone units and added VAV — multi-zone air handling units with single-zone air handling units. Install VAV boxes with terminal reheat in the existing mechanical rooms and use variable speed controls on fans. Install economizers on all units and provide hot water boilers for space heating to eliminate electric heating. Install new natural gas piping to new boilers. Reuse existing ductwork to the extent possible — clean and test ductwork.

OUHSD, Rancho Campana High School*

Camarillo, CA

TYPE: SIZE: ACCREDITATION:

New Building 100,000 SF

Designed for LEED Silver

Provided full design services for all technology infrastructure at the Oxnard Union High School District’s Rancho Campana Hig h School. Services included CCTV mass notification and Audio-Visual digital signage. Facilities included services for 800-student capacity, 100,000 SF state-of-the-art-technology classrooms. Responsibility included full coordination with the design team, development of technology plans specifications and construction management. The project is designed to a minimum LEED Silver standard to assure requirements of the collaborative for high school program (CHPS).

* Completed by AlfaTech principal during previous employment

MUSD, Montebello Gardens Elementary School, Library

Pico Rivera, CA

TYPE: SIZE:

New Construction 4,600 SF

The firm provided mechanical, electrical and plumbing engineering design services for the new ground-up library at Montebello Gardens Elementary School, approximately 4,600 SF.

ALFATECH www.atce.com