AlfaTech is a consulting engineering firm offering a range of complementary services and expertise in multiple markets. Our services include: Mechanical and Electrical Engineering Design, Technology, Architectural Lighting Design, Commissioning and Energy Solutions, as well as Sustainability.

T E A M A N D Q U A L I F I C A T I O N S F O R N E T F L I X B U I L D I N G E V A L U A T I O N S / S U R V E Y S E M E A

INNOVATIVE IDEAS | INTEGRATED SOLUTIONS | SUSTAINABLE PARTNERS

01

Team Structure

02

AlfaTech Profile | Services | Notable Projects

Desco Profile | Services | Notable Projects

03

19502

relationship driven

OVERVIEW 01

Team Structure

Partnerships

P R O F I L E

A L F A T E C H + D E S C O Team Structure and Capabilities AlfaTech with partner company Desco will jointly bring Netflix the strongest representation of engineering expertise that is needed to accomplish the building assessments/surveys that are so critical to keeping Netflix’s operations 24/7 across all locations in EMEA. AlfaTech has been providing innovative services for over 30 years, and is well versed in assessments and all levels of engineering for corporate facilities. AlfaTech is currently working with the Netflix team in Los Gatos, California on assessment/survey projects for all buildings on the campus, and has just embarked on a new garage project as well. Desco, home-based in the UK, shares a similar culture to AlfaTech, having developed and excellent reputation for delivering client focused and quality engineering services. For over two decades, Desco has been providing leading mechanical and electrical design services, and today has offices in the UK, Middle East and the Far East, detailed in the following Desco section. It is from these locations that the Desco team in alignment with AlfaTech, is able to provide services for mutual clients in these regions. This enables us to provide the most appropriate services, within needed timeframes and budgets, for our clients wherever our support is needed.

Uber, Mission Bay 1 & 2, San Francisco

Eventbrite

eBay

(See detailed Desco UK map in Desco section)

P R O J E C T T E AM

NETFLIX

MICHAEL ZEUGER AlfaTech Principal, Electrical NETFLIX Project Management Lead

ELIZABETH MONTI, MBA AlfaTech Principal, Director of Business Development NETFLIX Account Lead

KEVIN HALL Desco Operations Director

NEIL CROWE Desco Director

SURVEY TEAM 1

SURVEY TEAM 2

PAUL DAWSON Desco Principal Mechanical Engineer

MARK SWIFT Desco Electrical Associate Director

CRAIG MUNCASTER Desco Principal Electrical Engineer

NEIL ROONEY Desco Senior Mechanical Engineer

A L FAT E C H R E S UME S

AMAZON, Sunnyvale, CA Principal and PM on this 8-story office TI project spanning 244,000 SF including 26,000 SF of LAB and 8,000 SF of commercial kitchen/café facilities. The project consists of evaluation of existing MEP systems and providing major interior, mechanical, plumbing and electrical upgrades for more efficient operations. 23ANDME, Sunnyvale, CA Principal and PM on this 3-story office TI project spanning 144,766 SF and including 7,000 SF of commercial kitchen/café facilities. The project consists of evaluation of existing MEP systems and providing major interior, mechanical, plumbing and electrical upgrades from a warm-shell condition. IRVINE COMPANY, Milpitas, CA Principal and PM on this office TI projects, total 3 separate building TI, totaling 100,000 SF with 20,000 SF of MEP area and 30,000 SF of limited MEP modifications. The project consists of evaluation of existing MEP systems and providing major interior, mechanical, plumbing and electrical upgrades for more efficient operations. The project consists of open and closed offices, conference room, huddle rooms, break rooms, lobby/receptionist area, IT closet, Server rooms, electrical room and back of house areas. CONFIDENTIAL TECH CLIENT, Sunnyvale, CA Principal and PM on this project which consists of designing a prototype power distribution system to support Net Ops standard IDF, MDF and Site Core rooms and equipment. The first prototype was based on an existing facility of 289,000 SF over eight floors. The project scope included providing a more efficient and effective power distribution system at 415/240volt revising the existing electrical distribution system to support all future Net Ops equipment. The team is currently working on multiple additional projects that are installing the new system design. JAZZ PHARMACEUTICALS, Palo Alto, CA Principal and PM on this entire-building office TI project totaling 104,000 SF, located on Stanford University property. The project consists of review and evaluation of existing core and shell MEP systems and providing major interior, mechanical, electrical and plumbing upgrades from a core and shell condition. MCCARTHY CREEKSIDE, Milpitas, CA Principal and PM on this project consisting of 2 new developments, total of (8) buildings over 650,000SF at McCarthy Ranch and Sprig Center with new PG&E services to be provided at each new core and shell building. The McCarthy project includes six buildings and the Sprig Center includes a total of five buildings. Total 800,000SF of space.

ELIZABETH MONTI, MBA

MICHAEL ZEUGER

AlfaTech Principal, Directo r o f Business Development

AlfaTech Principal, Electrical

EDUCATION MBA, Rome Business School, Rome, Italy BA, Communications, SFSU, San Francisco, California

EDUCATION BA, Design & Engineering Carnegie Mellon University, Pittsburgh, Pennsylvania

PROFESSIONAL CAREER 1988 - Present

AFFILIATIONS Illuminating Engineering Society of North America IEEE U.S. Green Building Council SVLG

CoreNet -- Northern California Leadership Group: 6 years

Elizabeth leads Business Development for Northern California, for all divisions of the company. She oversees the marketing team and is Leader, Client Relationship management. Elizabeth is a member of AlfaTech’s Corporate Board Advisory group and a liaison to parent company. Elizabeth oversees all corporate communications/marketing, including branding, marketing collateral, graphic design, event management, Her background in commercial property management, architectural marketing and client development in the corporate construction field provide a unique and beneficial perspective in her current role. Previous client accounts:

PROFESSIONAL CAREER 1991 – Present

Michael is an electrical principal with more than 27 years of experience and is recognized for his continued success performing MEP consultancy, electrical engineering, energy efficient innovative design, complex project management with team integration and leadership. Michael has established regional acknowledgement for expertise in sustainability. He was awarded certifications in professional and sustainable/energy efficient performance building technologies. He emphasizes a complete sustainable design approach on all projects, taking on the leadership role in developing the most efficient, cost effective and practical approach on all projects.

Charles Schwab* Adobe Software* Google*

* denotes project performed with previous firm

D E S C O R E S UME S

KEVIN HALL, BEng (Hons) CEng, MIET , QSAS, CGP Desco Operations Directo r / Principal in Charge

NEIL CROWE , IEng, MIET Desco Directo r

CRAIG MUNCASTER, MIET , HNC Desco Principal Electrical Engineer

Operations Director of Desco, Kevin is a very experienced Chartered Engineer with particular expertise in electrical building services. Kevin started in the industry by serving a trade apprenticeship in electrical contracting, then moved into design having gained a BEng (Hons) degree in mechanical and electrical engineering. He was a design manager for a large national engineering contractor before joining Desco in early 2000. Kevin moved quickly through the ranks to the position of Associate Director leading a design group working on a wide range of projects in a number of sectors before being promoted to Director in January 2007. Kevin was initially responsible for one of the UK design teams in the head office and the technical delivery of projects within the UK. In 2011 he took on the role of Qatar Country Director, based in Doha, responsible for project delivery of work secured in the Middle East. In 2016 he moved back to the UK to become the Operations Director with responsibility for all operational matters and management of resource in the practice.

Director of Desco, Neil is a very experienced engineer who takes responsibility for the technical delivery of projects and management of one of the practice’s design teams in the Sunderland office. Neil has the benefit of having worked in both a contracting and a consulting environment and so has a very pragmatic approach to design. He retains hands on involvement on his projects from project inception to completion. He brings a wealth of experience including performing detailed infrastructure studies, negotiating with utility service providers to determine appropriate and cost-effective site servicing strategies, surveys and feasibility reports through to detailed design. A team player, approachable and responsive, Neil is comfortable and experienced in liaising with stakeholders at all levels - clients, local authorities and other public bodies, end user clients and design and construction team colleagues. He enjoys broad-ranging experience across a variety of sectors and is respected amongst his colleagues and clients for his technical knowledge and open and honest approach.

Craig is a principal electrical engineer, based in our head office at Sunderland. He joined the Desco team having spent twelve years with a global engineering supplier where he developed a wealth of knowledge and practical experience. He enjoys a broad ranging project portfolio including healthcare, universities, colleges and schools, police headquarters, industrial, retail and residential schemes. Craig is a competent engineer who takes great interest in his continued professional development. Since progressing into a senior engineering role, he has taken a lead role in the delivery of a number of the practice’s projects. Craig’s experience in the detailed design of services, and his practical background, means he brings his firm understanding of ensuring initial concept designs are functional and efficient to each project he approaches

27 Years of Experience

CEF IT Headquarters, Durham The Beam Vaux, Sunderland, UK Hebburn Hub, South Tyneside Council Tombola HQ, Sunderland, UK Baltic Business Quarter, Gateshead Durham University, Math & Computer Sciences Building,

33 Years of Experience

30 Years of Experience

Legal & General Buildings A&B Newcastle Heliz, Legal & General Newcastle Civic Centre The Word, South Tyneside Council

Aspire Zon Logistics HQ & FPC, Doha, Qatar Victoria Gate, Woking CEF IT Headquarters, Durham BEIN Sport Channel HQ, Doha, Qatar The Beam Vaux, Sunderland, UK Legal & General Buildings A&B Newcastle Heliz, Legal & General

CEF IT Headquarters, Durham The Beam Vaux, Sunderland, UK Tombola HQ, Sunderland, UK

D E S C O R E S UME S

MARK SWIFT, MSc, BSc (Hons) CEng, MIET Desco Electrical Associate Directo r

NEIL ROONEY, BEng (Hons) Desco Senio r Mechanical Enginee r

PAUL DAWSON, BSc, BEng, MEng, CEng, MCIBSE Desco Principal Mechanical Engineer

Mark joined our growing Leeds design team in early 2017 and takes responsibility for the electrical team. Mark is a Chartered Engineer and a member of the Institute of Engineering and Technology. Mark has a very practical approach to engineering and project management having served a trade apprenticeship as an electrician. He spent several years as project engineer and manager within the glass production industry before moving into engineering consultancy. Mark brings to the team a wealth of experience in electrical design for public sector clients particularly in schools, community healthcare and hospitals. Mark also has wide-ranging experience in infrastructure, energy audits, data centre and manufacturing and production facility design.

Neil joined the Desco team in 2013 having graduated with a BEng degree with honours in building services engineering from Northumbria University. Neil was recently promoted to Senior Mechanical Engineer. During his time as a student Neil had the benefit of a six month placement with a regional contracting practice where he gained valuable practical experience in building services engineering including services design for hospitals, further education as well as a major mixed use town centre development comprising retail, residential and public realm. Since joining Desco his project portfolio has grown to include further education colleges schemes, custodial premises, leisure developments and healthcare facilities. Neil has undertaken a key role in the delivery of a number of refurbishment projects across the Durham University estate and most recently the delivery of the new Rutherford Estates Proton Therapy Centres, across the UK.

Paul recently joined Desco bringing with him a First-Class Honours MEng degree in Building Services. Paul recently became a member of CIBSE, with a Chartered Engineer status. As a Senior Engineer, Paul takes responsibility for the full design works of projects and also attends regular design team meetings. Paul is currently working on some of Desco’s key projects including three new schools in Yorkshire for the Education and Skills Funding Agency, Science Central for Newcastle University, National Horizons Centre for Teesside University and the redevelopment of Newcastle Civic Centre.

11 Years of Experience

29 Years of Experience

University of Leeds, Project Nexus RB (Formerly Rickitt Benckiser), Project Wren Newcastle Civic Centre, Newcastle City Council Bettys & Taylors, Project Prospect Teesside University, National Horizons Centre CEF IT Headquarters, Durham

7 Years of Experience

Project Nexus, University of Leeds CEFCO Doncaster, CEFCO CEF IT Headquarters Durham, City Electrical Factors Project Prospect, Bettys & Taylors National Horizons Centre, Teesside University Legal & General Buildings A&B Newcastle Heliz, Legal & General

Durham University, Math & Computer Sciences Building, Vaux Sunderland

Tombola HQ, Sunderland, UK CEF IT Headquarters, Durham Newcastle Civic Centre The Word, South Tyneside Council

ALFATECH 02

Profile + Services Notable Projects

P R O F I L E

A L F A T E C H

Uber, Mission Bay 1 & 2, San Francisco

Eventbrite

For over 30 years, AlfaTech’s skills and expertise have been pivotal in developing strong, high-level and ongoing client and partner relationships in the US and internationally. We believe our loyalty and excellent service is what sets AlfaTech apart. Careful listening is our first priority, and this enables us to offer the most innovative and appropriate solutions for our clients in any and all locations. It is with this mindset that we’ve built a stellar list of clients, such as Uber, LinkedIn, Visa, Ebay as examples. AlfaTech’s services include mechanical and electrical engineering design, technology, architectural lighting design, commissioning and energy solutions, as well as sustainability. We provide services to assist our clients in in areas such as site selection, building evaluations, surveys and assessments. AlfaTech has over 140 employees and technical experts across our US offices and through our sister companies in EMEA, we have an additional 60+ locations and 4,000 staff members who offer the same and other complimentary services.

eBay

(See detailed Desco UK map in Desco section)

S E R V I C E S

SUSTAINABILITY Sustainability Planning) LEED / Green Building Consulting Masterplanning Life Cycle Cost Assessment Occupant Wellness and Comfort Façade Engineering CFD / Wind Studies Wind Studies Thermal Stratification Studies Energy Concept Studies

MECHANICAL ENGINEERING DESIGN Facility Evaluations and Standards Building Assessments/Surverys HVAC Heating Systems Water and Gas Cooling Systems / Chilled Water Dehumidification Systems Contamination Sensitive Areas Industrial Hygiene Systems Low Tolerance Temp Control Title 24 Analysis and Design Heat Recovery Systems Central Utility Plants Air Handlers HVAC System Controls PLC Programming Fire Protection and Plumbing ELECTRICAL ENGINEERING DESIGN Facility Evaluations and Standards Building Assessments/Surveys Power Systems 24 / 7 Power Systems (UPS) Power Monitoring Systems Toxic Gas Monitoring Graphic Control and Alarm Panels Grounding and Bonding Energy Management and Conservation Fire Alarm Systems Public Address Systems Plug Loads Control Emergency & Standby Power Lighting and Lighting Controls Security Systems

ARCHITECTURAL LIGHTING DESIGN Lighting and Lighting Controls Lighting Calculations

Customized ROI Calculations Sustainable Lighting Design

Energy Savings Analysis Custom Lighting Fixtures Design for finishes, fabrics and light sources

COMMISSIONING | ENERGY SOLUTIONS Early Quantifiable Energy Study Incentives

Multidisciplinary team of experts assess and design with holistic approach Assess every client’s project for energy, water and environmental quality goals Focus on daylighting, thermal comfort, advanced lighting control design, technology integration

Energy Star® Assessments Retro-commissioning (RCx) Monitoring Brand Continuous Commissioning (MBCCx) ASHRAE Level 1, 2 and 3 Energy Audits Measurement and Verification (M&V) of installed projects Energy Modeling Net Zero Energy Budgeting HVAC/Chilled Water Plant Optimization

TECHNOLOGY DESIGN Low Voltage Design Security Design Audio Visual Design Wireless Design & Modeling

Strategic Consulting Project Management Relocation & Migration

S E R V I C E S

SUSTAINABILITY

GREEN BUILDING

CONTINUOUS MEP SYSTEM EVALUATIONS/SURVEYS

LIFE

MECHANICAL ENGINEERING DESIGN

OF A BUILDING

ELECTRICAL ENGINEERING DESIGN

ARCHITECTURAL LIGHTING

TECHNOLOGY

RETRO COMMISSIONING

COMMISSIONING / ENERGY SOLUTIONS

CONSTRUCT I ON

OCCUPANCY

END OF USE

DES I GN

C L I E N T S

JDS Uniphase Corporation John Muir Medical Center Johnson & Johnson Johnson Controls JP Morgan Chase JRH Biosciences Juniper Networks Junipero Serra High School Kaiser HealthConnect Kaiser Permanente Kasowitz, Benson, et al

Novell Novellus Systems NVIDIA Ohlone Community College OptiSolar Oracle Orchard Properties Oread Pacific Bell PDL BioPharma PG&E Panattoni Europe Pfizer Philips Semiconductor Pitney Bowes Polycom Port of San Francisco Presidio Trust Price Waterhouse Coopers Qualcomm Queens Medical Center Rambus Raytheon Company

Scripps Memorial Hospital Sequoia Hospital CHW Sequoia UHSD Siemens SLAC National Accelerator Laboratory Solectron Corporation Sony America Spansion Sprint SRI International (Stanford Research) Stanford Healthcare & Clinics Stanford University Stanford University Medical Center

365 Main 3M Company AARP Abbott Biotherapeutics Abbott Laboratories Abbvie Abgenix Abt Associates ACCO Engineered Systems Adaptec AOC Adobe Systems Advanced Micro Devices Advantest America Advent Software Aetna Affymetrix Agilent Technologies Agnes Medical Center Akamai Technologies Alcoa Allen, Matkins, et al Alliance Bernstein, LLP Alta Bates Health System Altera Corporation Alum Rock School District Alza Amazon/Lab 126 Ambiance Associates Ambience Interiors Amdocs American Express Company Amgen Amprius

Bingham McCutchen, LLP Bio-Rad Laboratories BioGenex Biomarin Pharmaceutical BioMed Realty Trust Bloom Energy BMC Software Booz Allen Hamilton Inc

County of Sacramento County of San Mateo County of Santa Clara Credence CSAA

CSU Northridge Cupertino USD Daughters of Charity Health Dell Deloitte Consulting Digital Realty Trust Dignity Health Dominican Hospital Dropbox Dupont East Side Union HSD eBay Eil Lilly & Company Elsevier Inc Emirates National Oil Empire State Development Equinix Equis Corporation Ericsson Ernst & Young LLP Exelixis Ferrari Maserati of Silicon Valley Fidelity Investments Fireman’s Fund Insurance First Franklin Financial Corp Flextronics Foundry Networks Franklin Templeton Investments Genencor Genentech General Dynamics General Electric Genzyme Corporation Gilead Sciences Goldman Sachs Good Samaritan Hospital GSA Harbor UCLA Medical Center Hayward USD

Boston Properties Boston Scientific Bradford Schools Bristol-Myers Squibb Broadcom Broadreach Capital Partners Brocade Buck Institute Stem Cell Research Lab Cadence Design Systems Cal Pacific Med Center California Department of Mental Health CarrAmerica Development Cedars-Sinai Medical Center Chabot Las Positas CCD Charles Schwab Chevron Children’s Hospital, Los Angeles County Children’s Hospital, Oakland Children’s Hospital, Orange County Children’s Hospital, San Antonio Chinese Hospital Cisco Systems Citigroup Realty Services

Kimpton Hotels KLA-Tencor Corp La Clinica De La Raza

Stion Corporation Stryker Endoscopy Stubhub Sun Microsystems SunPower Sutter Health

Lam Research Laney College

Lawrence Berkeley Lab Letterman Digital Arts Levi Strauss & Company Linear Technology LinkedIn Lockheed Martin Corp Logitech Longs Drug Stores Los Gatos Saratoga HSD Lumentum Marriott International Martin Luther King, Jr. Community Hospital Marvell Semiconductor Maxim McKesson Medarex Menlo Park City School District Mercy Southwest Hospital Microsoft

Sybase Inc Symantec Synopsys Inc Sysorex T-Mobile Tencent Tesla Motors The Gap Twitter Uber UC Berkeley UC Davis UC Davis Medical Center UC San Francisco

Regional Medical Center Riverbed Technologies Robert Half International Roche Bioscience Ross Stores Sacramento Municipal Utility District Safeway Saint Francis Memorial Hospital Saint Joseph Hospital Saint Louise Regional Hospital Saint Mary’s Hospital Samaritan Medical Center Samsung San Francisco City Hall San Francisco International Airport San Francisco USD San Jose Medical Center San Jose Redevelopment Agency San Jose State University San Jose USD San Mateo CCCD San Mateo County Office of Education Sandia Laboratories Santa Clara County Health Dept. Santa Clara County Library Santa Clara County Office of Education Santa Clara USD Santa Clara University

City of Cupertino City of Foster City

UC Santa Cruz UC Los Angeles UCLA Outpatient Surgery/Oncology Center UCSF Mission Bay Medical Center Ultratech University of Colorado Hospital

City of Fremont City of Monterey City of Mountain View City of Newark City of Oakland City of Palo Alto City of Sacramento City of San Jose

Amstein + Walthert Anderson Architects Anixter Applied Dynamics Applied Materials Aradigm AT&T Park Clinic Atmel Corp Autodesk Avaya Avid Technology Avidex BAE Systems Bank of America Banuazizi Architects Bayer Healthcare Bechtel Corporation Bell, Rosenberg, et al Berryessa USD

Mills/Peninsula Hospital Mission Oaks Hospital Molecular Devices Monterey Peninsula College Morgan Hill USD Morgan Stanley Morrison & Foerster Motorola Mountain View School District MW Zander NASA-Ames National Semiconductor NETFLIX Network Appliance Nokia Nortel Networks North Bay Medical Center Northrop Grumman Novartis

University of Nevada University of Virginia URS Valley Medical Center Verisign Verity Health Verizon Communications Veteran’s Administration Visa International Vivus VMware Wachovia Bank

City of San Mateo City of Santa Clara City of Saratoga City of South San Francisco City of Sunnyvale College of Contra Costa College of Marin Colliers International Computer Associates Int’l Compuware CoreSite County of Monterey

Hewlett Packard Highland Hospital Hitachi America IBM Impax Laboratories Informatica Corporation Intel InterMune Intuit J&W Scientific

SAP Labs LLC Saratoga USD Savvis

Washington Hospital Xoma Therapeutics Yahoo

S U S T A I N A B I L I T Y

At AlfaTech, we have a multidisciplinary team of experts to assess and design projects with a holistic approach. Working alongside owners, architects and other stakeholders, we examine every project in a comprehensive, systematic way to meet the client’s sustainability, energy, water and environmental quality goals. AlfaTech goes beyond engineering – our suite of energy, water and sustainability assessment services creates projects that benefit the bottom line. We provide expert studies in all qualitative aspects of the built environment such as day lighting, thermal comfort, advanced lighting control design, and technology integration. Sustainability requirements differ from region to region, and client to client. Our international reach and resources, as well as our deep client relationships, ensure we provide the most appropriate Sustainability solutions for every project. As a standard practice, we provide complete evaluation of building systems to review and achieve the most sustainable and energy efficient systems for all building MEP systems.

We examine every project with a comprehensive systematic approach to meet the client’s sustainability, energy, water and environmental quality goals.

S U S T A I N A B I L I T Y

ADVANCED SIMULATIONS

We provide various advanced computer simulations to study wind patterns, thermal stratification and comfort issues in spaces, building façade studies and energy modeling to aid architects and owners make key decisions during the early stages of design.

Façade Engineering CFD/Wind Studies

• • • • •

Thermal Stratification Studies

Energy Concept Studies

Energy Modeling

S U S T A I N A B I L I T Y

CASE STUDY:

UBER MB 1 & 2 MISSION BAY HEADQUARTERS

San Francisco, CA

AlfaTech is currently involved in this Uber’s new San Francisco presence which is a new 420,000 square-foot, ground up office building in the Mission Bay area in San Francisco. Our scope of work includes mechanical, electrical, plumbing, technology, security, and sustainability services. AlfaTech assisted the architectural design team with optimizing performance by assessing various utility, façade and wind studies. The project is designed as an innovative, ultra- high performance building that includes a façade that responds to programmatic needs, an under floor air distribution system, a “winter garden” which acts as the main social space incorporating natural ventilation, and a proposed geothermal system to substantially reduce cooling equipment needs. AlfaTech has been providing MEP Engineering and Technology services for this client in the US and Globally for ten sites, including the new corporate headquarters in San Francisco. This is a state of the art new campus with over 420k SF of offices, a full kitchen and cafeteria. The project will include evaluation of all available sustainability features. Sustainability goals: • Significant reduction of building energy cooling needs by the use of geothermal exchange systems • Aggressive rainwater capture and retention • Natural ventilation for main atrium social areas, creating a pleasant, open experience for employees and visitors • Maximize use of day lighting to optimize workspace quality

S U S T A I N A B I L I T Y

CASE STUDY:

LENNAR CANDLESTI CK POINT & HUNTER’S POINT MASTER PLAN San Francisco, CA

The Candlestick Point and Hunter Point Shipyard is a 702-acre development that has the potential to bring most dynamic companies into the area and develop whole communities. This area will house R&D facilities, commercial spaces, multi- use buildings and retail spaces. Parks, trails, and open spaces will be additional features that will attract and enhance the community. The new development will add over 10,000 new residential units in the form of condominiums and low-, mid- and high-rise buildings. There will be over a million square feet of commercial space made available, over three million square feet for Research and Development, as well as over 300,000 square feet of property devoted to community activities. AlfaTech views this holistic approach to community development as an opportunity for Lennar Urban to be at the vanguard of urban design by creating a community infrastructure focused on environmental sustainability, technology, and self- sustaining. This means taking advantage of existing technologies to generate energy with the lowest environmental impact. We conducted a series of sustainable mechanical studies in a master plan scale to help the owners understand the options available to explore the feasibility of Net Zero energy for the new development. Proposed strategies involve:

Geothermal heat rejection systems

• High performance chillers and thermal energy storage • Biodigestion system for heat recovery and energy generation • Solar photovoltaic array for electricity generation • Rainwater and gray water capture and treatment

S U S T A I N A B I L I T Y

CASE STUDY:

DELTA PRODUCTS HEADQUARTERS Fremont, CA

Delta Products desired a new headquarters highlighting sustainability and energy efficiency with primary goals to showcase Delta Products’ innovation in a state of the art building blending the natural surroundings with sustainable building design. The Delta Americas Headquarters is a three-story 250,000 SF campus consisting of private offices, administrative, open workspace, conference/auditorium facilities, kitchen/dining areas, labs, office and warehouse. AlfaTech provided sustainable mechanical electrical plumbing engineering design services for this project focusing on the client’s desire to maximize natural ventilation and daylighting reduce water and energy consumption with a geothermal central plant and utilize radiant systems for primary space conditioning. AlfaTech conducted extensive CFD modeling to assist with sizing and locating windows around the building and their integration into a thermal tower ventilation strategy. The project also encompasses a photovoltaic system to balance energy consumption and achieve Net Zero Energy.

Some of the features included are:

Ecological ponds

• • •

Ground source heat pumps

• • • • • • •

EV chargers

Solar energy system Natural ventilation Active chilled beam

Rainwater harvesting

• Elevator power regeneration systems • Energy efficient HVAC system • Energy storage solutions • Hydronic bidirectional heating/cooling flooring systems

LED lighting

Spectrally selective glazing Grass and native plants

N OTA B L E P R O J E C T S | C O R P O R AT E O F F I C E

UBER MISSION BAY 1 & 2 / 420,000 SF – AlfaTech provided comprehensive engineering and technology design for two new high-rise buildings. AlfaTech provided design services for initial master planning and building design and then provided full design, MEP, Technology, PV and fuel cell system design for the full shell/core and interiors. UBER MISSION BAY 3 & 4 / 435,000 SF - AlfaTech provided comprehensive engineering and technology design for two new high-rise buildings--full design, MEP, technology, and lighting system design for the tenant improvements. This includes MEP design engineering services and development of design standards. UBER AlfaTech has been providing comprehensive engineering design services for nearly 2M SF for Uber since 2014. This includes MEP design engineering services and development of design standards. Uber is an ongoing client for AlfaTech providing complete MEP evaluation for the most sustainable and energy efficient systems in all building applications. • MEP Design • Architectural Lighting Design • Rainwater Collection System Design • PV and Fuel Cell Design • Technology (Security, IT and A/V) Design • Commissioning

UBER 1455 MARKET STREET / 177,000 SF - AlfaTech provided facility assessment and evaluation, as well as MEP engineering design services and commissioning for Uber’s new headquarters in this downtown high-rise.

UBER 685 MARKET STREET / 154,000 SF – AlfaTech provided MEP engineering design service and commissioning for seven floors in this downtown location. The project included building assessment and evaluation of all MEP systems, and applied the most energy efficient engineering to the MEP design. UBER 555 MARKET STREET / 247,000 SF - AlfaTech provided MEP engineering design services and commissioning for fifteen floors in this 21-story, 247,000 SF office building. AlfaTech provided building assessment and evaluation of all MEP systems, and applying the most energy efficient engineering to the MEP design.

N OTA B L E P R O J E C T S | C O R P O R AT E O F F I C E

LINKEDIN Multiple locations / Overall

Site assessments and engineering design services for over 2M SF offices across multiple sites, in the US and internationally.

LINKEDIN - San Francisco, California USA

AlfaTech provided mechanical, electrical and plumbing engineering services for a 450,000 SF, new ground-up project in the heart of SOMA in San Francisco. The project includes tenant improvements to the 26-story office building located at 222 Second Street.

LINKEDIN - Mountain View, California USA

AlfaTech provided mechanical, electrical, plumbing engineering, and lighting design services in support of tenant improvements for three buildings and a service building ▪ Building B: 6 stories, 208,500 SF ▪ Building C: 6 stories, 208,500 SF ▪ Building D: 4 stories, 152,600 SF ▪ Campus Service Building: 5,000 SF

LinkedIn, San Francisco, CA

LINKEDIN - Sunnyvale, California USA

AlfaTech provided mechanical, electrical, plumbing engineering and lighting design services for this 576,000 SF, new ground-up campus including full cafeteria and multipurpose facility.

LINKEDIN - New York, New York USA

AlfaTech provided full design for all technology infrastructure, including structured cabling, and AV systems for this 80,000 SF office. Facilities included training rooms, all-hands and various sized meeting spaces, and videoconference rooms. Responsibilities included full coordination with the design team, development of technology plans and specifications, facilitation of the bidding process for low voltage and AV sub-contractors and support during construction.

LinkedIn, New York, NY

N OTA B L E P R O J E C T S | C O R P O R AT E O F F I C E

VISA

AlfaTech has provided building evaluations/surveys and MEP engineering services as well as design standards for this ongoing client over many years.

VISA METRO 1, 2 & 3 / 349,000 SF - AlfaTech completed multiple phases of renovations and interior improvements for 3 Three buildings on Visa’s Foster City, California campus, including several floors of office space, cafeteria and the Auditorium/Lobby. Services MEP engineering, fire protection and CA.

VISA 385 SHERMAN AVENUE / 51,000 SF - AlfaTech provided MEP services for this tenant improvement project in Palo Alto California. The 3-story, mixed use building includes two subterranean parking levels and is LEED Gold.

ANALOG DEVICES Santa Clara, California USA

Analog Devices relocated its corporate headquarters into two recently completed warm shell buildings. AlfaTech provided facility assessment and evaluation/surveys in addition to MEP design services for this 356,000 SF project encompassing nine of the twelve floors, including due diligence and engineering design services for 356k SF, nine floors in two 2-story warm shell buildings for company headquarters.

CONFIDENTIAL TECH CLIENT

Confidential Location, USA

Numerous ongoing projects for world’s largest search engine company. More than 100 projects in past 9 years including site and building assessments/surveys, and design standards. The pictured project included MEP services for new 89,000 SF office space on one single floor plate to house this client’s first presence in this urban environment. AlfaTech provided building assessments, and MEP bid documents and subsequent review of the MEP Design-Build Subcontractors’ Permit and Construction Drawings.

Visa / Metro 1,2,3

N OTA B L E P R O J E C T S | C O R P O R AT E O F F I C E

OKTA

San Jose, California USA

AlfaTech provided building assessment and MEP design engineering and Technology services for this high-rise office TI project. Phase 1 of included the 14th floor for a total of 18,544 SF of open office workstations, meeting rooms, conferences, IT rooms and support areas. Phase 2 encompassed floors 4 through 11 and the 15th floor for a total of 182,156 SF.

The space including open office workstations, meeting rooms, conferences, IT rooms and support areas. Technology design services consisted of the 5th floor for a total of 20,000 SF of tenant improvements.

AMAZON

Sunnyvale, California USA

AlfaTech provided MEP design services site assessment, central plant evaluation, including for the world’s largest e-commerce company’s Moffett Towers location. The tenant improvement project encompassed the entire 8-stories of an existing building, total of 224,490 SF.

The project scope included upgrades to the 1st floor café, open area workstations, private offices, breakout areas, kitchenettes, and conference rooms

MOLEX

Fremont, California USA

Molex, a subsidiary of Koch Industries, acquired a 108,600 SF building consisting of office, lab, and warehouse space at 46360 Fremont Blvd. The building was built in 1983 and was in need of updates to the interior as well as exterior façade.

AlfaTech provided mechanical, electrical, plumbing, and fire protection engineering services and facility evaluation for this 108,600 SF tenant improvement project in Silicon Valley for this extensive tenant improvement project

N OTA B L E P R O J E C T S | C O R P O R AT E O F F I C E

CONFIDENTIAL CLIENT

Confidential Location, USA

AlfaTech has provided full MEP design services with LEED Administration for this confidential client. This 18-acre campus consists of: three interconnected, six-story office buildings with two levels of podium parking on the ground totaling 752,100 SF; 25,000 SF cold core and shell café building with full service commercial kitchen with variable flow system; six-story parking garage; open and collaborative environment with furniture systems; private offices; software/light-hardware labs in buildings 1 and 2 totaling 36,000 SF; server room with cooling redundancy; fitness center and wellness center, 10,000 SF each, in office tower 1 on level 3 The project awarded design incentives provided by saving by design. The project achieved LEED Platinum.

EBAY

Ongoing Client

AlfaTech has completed multiple projects over many years for this global high-tech client, including building assessments and surveys.

NORTH CAMPUS – San Jose, California USA

AlfaTech provided full mechanical and electrical upgrades for eBay’s “North Campus” which is affiliated with the Corporate Headquarters facility.

The firm provided due diligence, and engineering design for interior improvements for two 109,000 SF buildings including a 6,000 SF data center and server rooms.

BUILDING 17 - San Jose, California USA

AlfaTech provided engineering design services for eBay’s newest North Campus 5- story building in San Jose. This included a new core and shell and tenant improvements to building 17 totaling 189,590 SF. AlfaTech also prepared electrical infrastructure design for the installation of a roof-mounted 100kW photo-voltaic panel installation. This project achieved LEED Gold.

03 DESCO

Profile + Services Notable Projects

team

player

mentality

P R O F I L E

D E S C O Desco is an award-winning MEP consulting engineering practice with offices in the UK, Middle East and Far East. Established in the UK in 1998 the practice has the critical mass and importantly, the calibre of people, design tools and effective support systems that allow it to compete with the very best in the industry and work on projects of all sizes.

The business has developed an excellent reputation for delivering a high quality, professional service, and as a result, enjoys long term relationships with an established client base.

G R O U P S T R E N G T H In 2016 Desco joined a larger international engineering group. RAG Stiftung is a German based investment foundation which is developing a family of market leading consulting practices including Pell Frischmann and Dorsch Gruppe, who operate independently across a number of international markets, but have the benefits of being in a larger long-term trading group. Desco is the group’s MEP consulting engineering practice operating independently in the UK as a wholly-owned subsidiary of multi- disciplined engineering firm Pell Frischmann.

S E R V I C E S

Environmental Assessment As MEP consulting engineers we understand the important contribution we can make in helping to achieve sustainable buildings. We are fully conversant with a number of environmental assessment methods and are able to advise and guide clients and design team colleagues through the various processes. We can offer: The building information models we produce are used as shared knowledge resources to support decision-making about a building project from the earliest conceptual stages, through design, construction, installation and operation. BIM Desco’s skilled team of engineers and CAD technicians have been working in the 3D environment for over ten years and have considerable knowledge and the practical experience necessary to produce fully coordinated computer models, incorporating detailed mechanical and electrical services data, architectural and structural information.

MEP Design Our talented team of mechanical, electrical and public health engineers work together to offer the full range of design and consultancy services from surveys and feasibility studies through to detailed design. We work on new build, refurbishment and infrastructure projects of all sizes delivering sustainable, affordable, well-designed building services across a variety of sectors. Our engineers bring broad-ranging knowledge and experience of conventional solutions, as well as fresh thinking on alternative solutions to servicing requirements to provide comfortable, functional environments. Building Physics We utilise modern complex software packages to provide the very best means of testing and shaping the building design. At the conceptual design stage we use the software to develop a ‘model’ of the building. Our experienced engineers can then interrogate this building simulation to help evaluate alternative solutions and establish the most appropriate and energy efficient design. Moving through the design process we employ technology to assist us in the detail design. Our team can deliver projects using traditional 2D drawings through to fully coordinated 3D building models with fly-through functions and clash detection analysis.

CONSULTING • Pre-acquisition surveys and reports • Due diligence surveys and reports • Condition surveys and reports • Vendor surveys and reports • Asset registers and PPM advice • Technical monitoring and assistance duties • Design peer reviews and audit reports

• Value engineering and cost advice • Expert witness advice and support

DESIGN • Energy strategy and planning reports • Infrastructure, utility surveys, negotiations and investigation reports • Thermal modelling and building physics advice • Sustainability, LEED and BREEAM • Feasibility, concept and sketch scheme design advice • Full Detailed Design Duties. ENGINEERING • Performance design duties • Construction stage site monitoring and compliance duties • Resident engineering support • Commissioning and witnessing support • Post occupancy surveys and reviews (soft landings) • Pre-Planning and planning application process • Programme management and performance monitoring

• BREEAM Accredited Professionals • BREEAM Assessors • Energy Performance Certificates (Levels 1 to 5) • LEED Advice • QSAS Green Professionals

Low Carbon We employ fully qualified Low Carbon Consultants and Low Carbon Energy Assessors who perform a fundamental role on projects to minimize the energy use and carbon emissions from buildings both in design and operation. Our consultants ensure that the energy performance of both new and existing buildings meet all regulatory requirements – and in most cases exceed these targets.

K E Y MA R K E T S & P R O J E C T S

• Commercial Office

• Assessments • Surveys • Evaluations

Other

• Public Buildings

• Science and Technology • Education

• Health • Hotel/Leisure • Residential

• Retail

• Sport & Leisure

C L I E N T S

teamwork

LOS ANGELES

SAN FRANCISCO

SAN JOSE

510 West 6 th Street, Suite 1105 Los Angeles, CA 90014

One Post Street, Suite 2200 San Francisco, CA 94104

1321 Ridder Park Drive, Suite 50 San Jose, CA 95131

213.212.9860

415.403.3000

408.487.1200

MANILA OFFICE:

CROYDEN OFFICE:

SUNDERLAND (HEAD OFFICE):

LEEDS OFFICE:

LONDON OFFICE:

17th Floor 6788 Ayala Avenue Oledan Square 1226 Makati City, Philippines

AMP Hours CROYDEN Greater London CRO 2LX

Azure House 2 Azure Court Doxford International Business Park SUNDERLAND SR3 3BE

Prospect House Sovereign Street LEEDS LS1 4BJ

5 Manchester Square LONDON W1U 3PD

Tel: +63 (0) 2 310 9804/5

el: +44 (0) 207 299 2860

Tel: +44 (0) 208 686 5583

Tel: +44 (0) 113 389 1025

Tel: +44 (0) 191 522 2070

Made with FlippingBook - professional solution for displaying marketing and sales documents online