Ratcliff Architects -AlfaTech Big Book pps 19122

P U B L I C | C I V I C | T R A N S P O R T A T I O N

VANDENBERG AIR FORCE BASE VEHICLE MAINTENANCE FACILITY

WETA (WATER EMERGENCY TRANSPORTAT ION AUTHOR ITY)

Vandenberg AFB, CA Type: Maintenance Shop, Administrative Office Size: 40,000 SF The firm provided full mechanical, electrical and plumbing/fire protection design services for a 40,000 SF vehicle maintenance facility on base.

Alameda, CA

Type: Operations & Maintenance Facility In order to provide better emergency response to the San Francisco Bay Area, the Water Emergency Transportation Authority (WETA) is building an Operations and Maintenance Facility in addition to a Marine Facility in Alameda. The marine facility that will serve as the main base for WETA’s ferry fleet, administrative offices, Operations Control Center (OCC), and Emergency Operations Center.

NAVAL POSTGRADUATE SCHOOL Monterey, CA Type: Classroom, Administrative Office, Auditorium Size: 108,000 SF

CENTRAL SUBWAY San Francisco, CA

The Central Subway is an extension of the Muni Metro light rail system under construction in San Francisco, California, from the Caltrain commuter rail depot at 4th and King streets to Chinatown, with stops in South of Market (SoMa) and Union Square. Mechanical and plumbing design was provided for the Moscone substation, located below ground level.

The firm provided full engineering design services for a new 3-story Academic Instruction Building at the Naval Postgraduate School in Monterey provided approximately 108,000 SF including new classrooms, lecture spaces, and houses the department of Oceanography, Meteorology and Mathematics, as well as a secure computer facility. The project includes an electronics lab, twelve research labs and teaching labs.

CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHAB ILITAT ION (CDCR ) Stockton, CA

ALAMEDA COUNTY JUVENILE JUSTICE CENTER San Leandro, CA Type: Juvenile Justice Facility Size: 379,000 SF

Type: Detention Facility Size: 220,000 SF

Provided MEP conceptual design for this campus facility with medical building, transitional housings, administration, vocational building and family visiting. Also included the design and implementation of a 30 kW photovoltaic system for the building.

Administration and courts building with capacity for 360 minors. First US detention center achieve LEED Gold status and received a perfect score in Energy and Atmosphere, and Innovation and Design Process categories. Innovative and efficient elements reduced water consumption by 7m gallons annually and saved 500 kW annually (65% more efficient that Title 24 requirements).

Made with FlippingBook flipbook maker