Skilled Nursing Qualifications

AlfaTech is a consulting engineering firm offering a range of complementary services and expertise in multiple markets. Our services include: Mechanical and Electrical Engineering Design, Technology, Architectural Lighting Design, Commissioning and Energy Solutions, as well as Sustainability.

Skilled Nursing

ALFATECH LOCATIONS San Jose, California – HQ | San Francisco, California | Monrovia, California | Orange, California | San Diego, California

INNOVATIVE IDEAS | SUSTAINABLE SOLUTIONS | INTEGRATED PARTNERSHIPS

2023

IFM Group joins VelaTech Holding EDG2 joins VelaTech Holding

2022

Verity Commercial joins VelaTech Holding AlfaTech Asia joins VelaTech Holding

COMPANY PROFILE

2021

Vela Tech Holding, Inc. established

AlfaTech acquired S&K Engineering of Monrovia and LFA Lighting of Ventura. 2020

AlfaTech was established in Silicon Valley in 1987 as a mechanical, electrical, and technology (low voltage, security, and A/V) design engineering firm. Responding to client needs, we expanded our service offerings to include architectural lighting design, sustainability, Smart Building, and project management services. In addition, we expanded into five California offices, including San Jose (Silicon Valley), San Francisco, Monrovia, Orange and San Diego. AlfaTech is gaining ground through organic, merger, and acquisition growth. Establishing Vela Tech portfolio with parent company RSBG, our services reach the West Coast to the Midwest and the East Coast from partner offices in Seattle, Chicago, Reston, and Edison. We also have an international presence with offices throughout Europe, Asia, North Africa, and the Middle East. AlfaTech has a solid reputation forged by a corporate commitment to enduring client relationships and service excellence. We provide complete design, design-assist, and design/build project delivery services. Our project experience includes core and shell, tenant improvements, upgrades, repositioning, and restacks. Each AlfaTech project aims to achieve maximum energy performance, resource conservation, and pollution reduction, resulting in the highest energy savings and sustainability at all design phases while creating a balance of preservation, constructability, schedule, and budget. Given the dynamic nature of what we do, our AlfaTech teams are active listeners, and together with their focus on client and partner relations, are true team players.

2018

AlfaTech partners with RAG Stiftung adding strength of 65+ offices throughout Europe, Asia, Middle East, and Africa.

Celebrates 30 Years Success! 2017

30Y

2006 - 2017

AlfaTech expands Regionally Expands San Francisco Office Opens LA Office Opens San Diego Office AlfaTech Expands Services Architectural Lighting Design Sustainability / LEED and Energy Solutions

2004

AT-PD founded

2003

Named one of the Top 100 Largest Private Companies in San Francisco.

2000

Named one of the Top 100 Fastest Growing Companies in Silicon Valley.

Merges with S&H and MPL. Opens San Francisco office 1996

1987

Jeff Fini, PE, founds AlfaTech MEP & Technology Design in Silicon Valley

LOCATIONS ALFATECH is part of Vela Tech Holding portfolio of companies

VELA TECH HOLDING

AT-PD San Francisco, California Monrovia, California Orange, California San Diego, California VERITY COMMERCIAL Seattle,Washington ALFATECH USA San Jose, California San Francisco, California Chicago, Illinois Reston, Virginia Edison, NewJersey EDG2 Bethesda, Maryland Phoenix, Arizona IFM GROUP San Ramon, California San Diego, California

ALFATECH ASIA Singapore Tokyo, Japan Shanghai, China

Australia Malaysia

SISTER COMPANIES

EUROPE Vienna, Austria Kornberg, Austria Saint-Cannat, France Berlin, Germany

ASIA Dhaka, Bangladesh Tangail, Bangladesh Jakarta, Indonesia Amravati, India Chengalpattu, India Dehradun, India Gandhinagar, India Gujarat, India Mumbai, India New Delhi, India Pune, India Ratnagiri, India Solapur, India Tamil Nadu, India

Bitterfeld, Germany Bochum, Germany Darmstadt, Germany Dresden, Germany Dusseldorf, Germany Eisenhüttenstadt, Germany Erfurt, Germany Essen, Germany Frankfurt am Main, Germany Freiburg, Germany Greifswald, Germany Großostheim, Germany Hamburg, Germany Karlsruhe, Germany Kassel, Germany Köln, Germany Kronberg im Taunus, Germany

Yavatmal, India Lao PDR, Laos Makati City, Philippines Singapore Bangkok, Thailand Ho Chi Minh City, Vietnam

Leipzig, Germany Mainz, Germany Mannheim, Germany Munich, Germany

AMERICAS Toronto, Canada Bogotá, Colombia Bosque de chapultepec, Mexico Lima, Peru

Nuremberg, Germany Regensburg, Germany Ribnitz-Damgarten, Germany

MIDDLE EAST Abu Dhabi, UAE

Rostock, Germany Stralsund, Germany Stuttgart, Germany Wiesbaden, Germany Wirges, Germany Würzburg, Germany Athens, Greece Milan, Italy Podgorica, Montenegro Belgrade, Serbia Birmingham, UK Bishop‘s Stortford, UK Bristol, UK Chamberlain, UK Croydon, UK Exeter, UK Leamington Spa, UK Leeds, UK London, UK Luton, UK Manchester, UK Mold, UK Nottingham, UK Stockport, UK Sunderland, UK Wakefield, UK Warwickshire, UK

Al Ain, UAE Dubai, UAE

Madinat Zayed, UAE Ras Al Khaimah, UAE Jeddah, Saudi Arabia Riyadh, Saudi Arabia Al-Zahra City, Gaza Strip Amman, Jordan Baghdad, Iraq Doha, Qatar Istanbul, Turkey Kuwait Sharq, Kuwait Muscat, Oman

AFRICA Algier, Algeria Alexandria, Egypt

Assiut, Egypt Cairo, Egypt Giza, Egypt Dar es Salaam, Tanzania Tunis, Tunisia

Kampala, Uganda Khartoum, Sudan

Professional Outreach

AlfaTech is dedicated to engaging with various professional organizations to promote knowledge sharing. We believe that by collaborating with organizations, we can develop new and innovative ideas that will benefit our clients. AlfaTech enjoys participating in events and meetings with industry leaders. You’ll find we are actively involved with:

ALFATECH Engineering Studio

ENGINEERING STUDIO We provide the most advanced, professional engineering services that ensure buildings thrive. We partner with clients to turn their visions into a tangible reality. As one of the leading MEP consultants in the Western U.S., AlfaTech strives to improve the lives of hundreds of thousands of people every day through the buildings we design. Coining the expression “Innovation & Excellence,” we provide the most advanced, professional engineering services that ensure buildings thrive. We partner with clients to turn their visions into a tangible reality. To us, conscious design elements are indispensable in meeting the escalating expectations emerging within vibrant and diverse typologies. We believe the highest-efficiency buildings transpire from mirroring the sustainable features inherent to the world around us. Propelling cutting-edge solutions requires a thoughtful design that can interact with the physical environment. Elements like smart buildings, reduced reheat, and synergies before waste initiate perpetual savings. Eager to do our part, we pride ourselves on designing state-of-the-art facilities that reach unprecedented levels of integration. We think that sustainable design is more than just a phrase. It is a perspective. We are committed to rock-solid partnerships with our clients by delivering on our promise always to excel.

OCCUPANCY

DESIGN

CONSTRUCTION

END OF USE

SUSTAINABLITY

PROCESS ENGINEERING DESIGN

MECHANICAL ENGINEERING DESIGN

ELECTRICAL ENGINEERING DESIGN

ARCHITECTURAL LIGHTING DESIGN

TECHNOLOGY

COMMISSIONING / ENERGY SOLUTIONS

RETRO COMMISSIONING

LIFE OF A BUILDING

ARCHITECTURAL LIGHTING DESIGN Lighting and Lighting Controls Lighting Calculations Customized ROI Calculations Sustainable Lighting Design Energy Savings Analysis Custom Lighting Fixtures Custom Lighting Fixtures Design

COMMISSIONING & ENERGY SOLUTIONS Early Quantifiable Energy Study Incentives Energy Star® Assessments Re/Retro-commissioning (RCx) Monitoring Brand Continuous Commissioning (MBCCx) ASHRAE Level 1, 2 & 3 Energy Audits Measurement and Verification (M&V) of installed projects Energy Modeling Net Zero Energy Budgeting HVAC/Chilled Water Plant Optimization

ELECTRICAL ENGINEERING DESIGN Power Systems Emergency & Standby Power Lighting and Lighting Controls Security Systems 24 / 7 Power Systems (UPS) Power Monitoring Systems Toxic Gas Monitoring Graphic Control and Alarm Panels Grounding and Bonding Industrial Hygiene Systems Low Tolerance Temp Control Title 24 Analysis and Design Heat Recovery Systems Central Utility Plants Air Handlers HVAC System Controls PLC Programming Fire Protection and Plumbing MECHANICAL ENGINEERING DESIGN HVAC Heating Systems Water and Gas Cooling Systems / Chilled Water Dehumidification Systems Contamination Sensitive Areas

TECHNOLOGY CONSULTING AND DESIGN

Low Voltage Design Audio Visual Design

Security Systems Design Architectural Acoustics Wireless Design & Modeling

SUSTAINABILITY Sustainability Planning (Organizational and Infrastructural) LEED / Green Building Consulting Master Planning

Distributed Antenna Systems (DAS) Integrated Building Management Systems BMS Network Integration Telco Facilities and Services Voice Systems and Applications Relocation & Data Center Migration Services Strategic Planning and Analysis Project Management Management Consulting

Life Cycle Cost Assessment Occupant Wellness & Comfort Façade Engineering CFD / Wind Studies Wind Studies Thermal Stratification Studies Energy Concept Studies

Energy Management Energy Conservation Fire Alarm Systems Public Address Systems Plug Loads Control

ALFATECH Project Experience

Edenbridge Health

Los Angeles, CA

TYPE: SIZE: 19,000 SF

New Construction

AlfaTech provided mechanical, electrical, and plumbing engineering design services for the build of a medical clinic for seniors to facilitate all-inclusive care for the elderly (PACE) program within an existing 2 story office building, totaling 19,000 SF. The new clinic includes exam rooms, quiet rooms, nurses’ station, exercise rooms, lab, private offices, open offices, meeting rooms, conference rooms, break rooms, clean/dirty utility areas, laundry room, personal care center, reception area, entry area, triage, transit office, oxygen storage and a day room with 88 seats.

Sweetwater Spectrum Community

Sonoma, CA

TYPE: SIZE: ACCREDIATION:

New Construction 16,500 SF

PG&E ZNE Pilot Project

The firm provided MEP engineering design services for this award-winning community which integrates autism spectrum-specific design, universal design and sustainable design strategies. The project includes four 3,250 SF 4-bedroom homes, a 2,300 SF community center with exercise/activity spaces and a teaching kitchen, large therapy pool and spas and an urban farm, orchard and greenhouse. Particular care was taken with the selection of the building materials and systems to promote healthy indoor air quality, acoustical control, and comfortable, super efficient HVAC systems. Since ceiling fans can be a negative stimulus to people on the autism spectrum, a radiant slab heating and cooling system was used with a low-velocity ventilation system. The site was designed to maximize passive solar orientation, daylight, and natural ventilation. All buildings incorporate photovoltaic solar panels and solar hot water. Other energy-saving strategies include high R-value insulation in walls and roofs; high-performance insulated windows; low- reflective “cool” roofs; solar tube skylights at interior halls; sun control where needed with overhangs, trellises, and operable exterior sunshades; high efficiency air-to-water heat pumps; energy-efficient light fixtures; Energy Star appliances; induction cook tops; and a building management system. Overall, these strategies improved energy performance by +30% better than California Title 24 energy requirements. Low-flow plumbing fixtures throughout reduce water consumption. An on-site well was drilled to supply water to all site irrigation systems, including site landscaping and the organic farm and orchards. Drought-tolerant plants minimize irrigation needs, and permeable paving and bioswales manage stormwater.

The project is a Pacific Gas & Electric Zero Net Energy Pilot Project and exceeds the 2030 Commitment designed to reduce energy use by 88% .

Olen Jones Senior Housing

Rancho Cucamonga, CA

TYPE: SIZE:

New Construction 95-Units

Provided mechanical, electrical, plumbing, and fire protection engineering design services for this new multi building, a multi-story residential complex with 95 Unit Apartment project on a 3.2-acre parcel designed for Seniors of limited incomes.

Marriott Assisted Living Facility

Yorba Linda, CA & San Juan Capistrano, CA

TYPE: SIZE:

Tenant Improvement 200,000 SF

The firm provided mechanical, electrical, plumbing, and fire protection engineering design services for these 3-story multi-unit residential projects of approximately 100,000 SF each.

Pacific Gardens Nursing & Rehabilitation Center

Fresno, CA

TYPE: SIZE:

New Construction 20,500 SF

AlfaTech designed the MEP and fire protection systems for the new 34-bed, 20,500 SF skilled nursing facility. The project included nurse call, emergency electrical outlets and lighting, oxygen storage, and a large physical therapy gym.

Casa Bonita Nursing Home

Huntington Park, CA

TYPE: SIZE;

Tenant Improvement 78,910 SF, 80 units

AlfaTech provided mechanical, electrical, and plumbing engineering design for the renovation and remodel of an existing 5-story nursing home located at 6512 Rugby Ave in Huntington Park, CA. The building is constructed in a ‘U’ shape with an open -air central courtyard 2nd through 5th floors comprised of a combination of 6 different units per floor. North and South wings each have their own laundry room on each floor and are connected with a central elevator lobby. The first level contains a parking structure below with an entry lobby leading out to the central courtyard. Common spaces include offices, a fitness room, computer room, restrooms, a community room, a small kitchen, and support spaces.

The Watermark at Westwood Village*

Los Angeles, CA

TYPE: SIZE:

Tenant Improvement 189,000 SF

The Watermark at Westwood Village, a new Watermark Retirement Communities project, is a senior living facility in an historic building that Watermark is completely renovating and upgrading. At 189,000 SF, 14 floors and nearly 200 residences.

* Completed by AlfaTech principal during previous employment

California Department of Mental Health

Coalinga, CA

TYPE:

New Building 1,200,000 SF

SIZE:

AlfaTech provided mechanical and electrical engineering design, including construction administration services for this new 1,500 bed, 1,000,000 SF Acute Care Psychiatric Hospital. The facility provides housing and treatment for 1,500 patients – with over 40 buildings. This new detention and court complex included education, treatment, housing, administration, food service, laundry, hearing room, and visiting areas. This new detention and court complex included education, treatment, housing, administration, food service, laundry, hearing room, and visiting areas. This project represented a new paradigm in the design of a public mental health facility (the largest new facility of its kind in the U.S.). It represented “best practices” for a treatment environment and incorporated the concepts of “Evidence - Based” and “Humanistic” design as a platform.

Construction budget of $314M.

Calaveras County Adult Detention Facility

San Andreas, CA

TYPE: SIZE:

New Construction 120,000 SF

Engineering design services for a new 41,000 SF, 2- story Sherif’s Administration building and new 3 -story, 80,000 SF jail with 12,000 SF dormitory building designed to hold 160 beds between four quadrangles in a day room concept on the second floor and mezzanine levels. Building includes full commercial kitchen and dining, maintenance, storage, medical, dental, booking and release and a vehicle sally-port. MEP system was designed to serve the whole project through the jail utility rooms and jail mechanical yard that contain cooling towers, chillers, boilers, and emergency generators. Energy efficient aspects include photo-voltaic systems, thermo-mass pre-cast panels, domestic water heating solar collecting system, and lighting controls. The jail building contains a comprehensive electronics safety and security package to support an integrated access control system, intercom system, programmable logic controllers and graphical user interface system, video visitation, interview recording system, and video surveillance.

Constructed utilizing California AB900 funding.

San Bernardino Community Hospital, Convalescent Facility San Bernardino, CA

TYPE: Tenant Improvement

The firm was enlisted to perform a study of current building systems including electrical service, emergency power, lighting, fire alarm, nurse call, paging/telephone, cable television, HVAC, plumbing, and fire protection. This effort involved site visits and the preparation of a detailed report. The report included an analysis of current conditions and recommendations for improvement. The firm was commissioned to implement some of the necessary updates, including the design of a new emergency generator system and retrofit of the HVAC system.

US Vets, Veterans Administration Campus Supportive Housing

West Los Angeles, CA

TYPE: SIZE:

Tenant Improvement 4 Buildings - Totaling 262,690 SF

US Vets is a private, non-profit organization providing housing, employment and counseling to veterans across the nation. US Vets project consists of the renovation of 4 buildings on the WLA VA Campus for veterans in need. All 4 buildings will include supportive housing for veterans and 2 of the 4 buildings also include support services for the larger community featuring great halls, community rooms, social gathering areas, dining areas, kitchen, admin and support spaces. The 4 buildings consist of a combination of 2 and 3 floors above a full basement or partially day-lit basement. AlfaTech provided MEP and Technology engineering services.

• Building 300: 72,280 SF; 48 Veterans Housed; 17,300 SF amenity • Building 210: 38,700 SF; 41 Veterans Housed • Building 256: 45,070 SF; 49 Veterans Housed • Building 13: 60,940 SF; 27 Veterans Housed: 28,400 SF amenity

Veteran’s Administration

Various Locations, CA

TYPE: SIZE:

Tenant Improvement Various including 8,000 SF and 180,000 SF

AlfaTech has completed numerous projects for the Veterans Administration at sites throughout Northern California. These have ranged in size and scope from an 8,000 SF clinical lab renovation to a 180,000 SF primary care/ambulatory care center. Engineering services have included mechanical, electrical, plumbing, fire protection, and telecommunication systems design, as well as infrastructure analysis.

VA Homeless Transitional Housing, Building #209

West Los Angeles, CA

TYPE:

Adaptive Reuse, Renovation 51,500 SF LEED Gold

SIZE:

ACCREDIATION

The firm provided mechanical, electrical and plumbing engineering design for the transformation of a historic 1940s-era, 3-story, 51,500-square-foot building into a welcoming haven for veterans through adaptive reuse and renovation. The project involved converting the space into a therapeutic and supportive residential program for homeless veterans, comprising 45 single occupancy and 10 double occupancy apartments. The facility includes essential amenities such as a community kitchen, laundry room, reading room, activity room/counseling area, and a dedicated community room. The HVAC system implemented is an efficient solution utilizing district steam for hot water heating and integrates new local chillers for chilled water cooling. Air Handling Units strategically placed in the spacious attic deliver variable volume air to hot water terminal reheat units, ensuring effective zoning. All AHUs are equipped with full air-side economizer cycles for optimal energy efficiency. The incorporation of low-flow water fixtures, Contributes to a 45% reduction in the building's potable water consumption. To further enhance long-term energy efficiency, the project includes a green cleaning program and the installation of Energy Star appliances, reflecting our dedication to creating a resilient and environmentally conscious living space for veterans.

Awards 2016 AIA Specialized Housing Award 2016 LA Conservancy Preservation Award 2016 LABC, Green Building Award 2015 Sustainable Innovation Award, LA Chapter

Casa Colina Center of Physical Therapy

Azusa, CA

TYPE: SIZE:

Tenant Improvement 6,400 SF

The Casa Colina Azusa Center offers outpatient physical therapy, occupational therapy, and speech-language pathology services for people with functional impairments due to orthopedic or neurological injury or illness. The firm provided MEP engineering for the tenant improvements for the 6,400 SF facility.

MLK Wellness Center

Los Angeles, CA

TYPE: SIZE: ACCREDITATION:

New Construction 52,000 SF

LEED Silver for Core & Shell

AlfaTech provided MEP engineering design for this ground up construction project for a two story, Health Care Access and Information (HCAI), formerly OSHPD 3, medical office building, approx. 52,000 SF. Programming for the first floor includes a primary care clinic with exam and procedure rooms, dental, behavioral health and provider offices. The second floor includes an outpatient ambulatory surgery center with four operating rooms, Pre-Op/PACU and an in-house sterile processing department to support the surgery suite. Additional services include a wound care suite and a telehealth program, offering on-going virtual follow-up support for patients. The remainder of the two floors consists of unfinished shell space that the hospital intends to outfit with vital services that may include dialysis, infusion, imaging, and pharmacy. 250 parking spaces with 6 EVSE charging stations.

This facility reduces the low-acuity patient load to the main hospital, ultimately providing the surrounding area with unprecedented access to health and well-being equity and empowerment.

650 Raymond Avenue, Medical Office Building

Pasadena, CA

TYPE:

New Construction, Core & Shell 42,000 SF

SIZE:

AlfaTech design services included core and shell MEP systems to support the new 4-story mixed-use facility and its 5-level underground parking structure (4 parking, 1 surgical center). Programing includes 32,000 SF of medical space for Specialty Practice, Internal Medicine and Family Practice, Pediatrics, OB/GYN, Lab, Imaging, and Central Scheduling and administrative offices as well as 3,331 SF of retail space. The MEP systems are designed to Health Care Access and Information (HCAI), formerly OSHPD3 standards, and 3,331 SF of retail space is supported with a VRF system.

Cedars-Sinai, Brentwood Urgent Care & Dermatology Clinic

11620 Wilshire Boulevard, Los Angeles, CA

TYPE: SIZE:

Tenant Improvement 7,500 SF

AlfaTech provided mechanical, electrical and plumbing engineering and architectural lighting design services for Suite 100 &105, totaling 7,500 SF, and approximately 60% of the overall floor plate. The scope included addition of urgent care clinic including lobby, exam rooms, x-ray, infusion rooms, as well as upscale Dermatology Practice with full service cosmetic and medical treatment center with laser, and dermatology exam rooms.

Santa Clara Valley Medical Center

Santa Clara, CA

TYPE: SIZE:

Tenant Improvement 120,000 SF

AlfaTech performed mechanical and electrical engineering design services for this 3-story medical office building which included converting existing office space into medical exam rooms, patient treatment rooms, physical therapy suites and a new pharmacy. An AIDS/ICH treatment clinic was provided; complete with patient treatment "negative pressure" isolation rooms. Significant HVAC upgrades where required for the renovation. New power and telephone/data distribution throughout the entire building was required and new lighting for the upgraded areas. A new fire alarm system was specified, and the corridors were upgraded to bring the building up to current code requirements. The project is OSHPD1.

Santa Clara Valley Medical Center, Old Main East & West

Santa Clara, CA

TYPE: SIZE:

Tenant Improvement 23,800 SF

AlfaTech provided mechanical, electrical, plumbing and fire protection engineering services for the structural strengthening of Old Main West and portion of Old Main East – basement through 3rd floors, including the demolition of OM West 4th through 7th floors and demolition of OM East basement through 7th floors. MEP Services included design for rooftop HVAC system design to provide maximum ventilation and exhaust systems to the three-story building and basement, and ventilation of the corridors running down the center of the building, two new elevators and exit stairs.

Santa Clara Valley Medical Center, North Loop Extension

Santa Clara, CA

TYPE:

Site Improvement

AlfaTech provided mechanical and electrical engineering services for the design and construction for the North Loop Utility Extension of the high voltage 12kV, high pressure steam, chilled water and low voltage system to the rehab buildings at Santa Clara Valley Medical Center.

UCSF Medical Center

San Francisco, CA

TYPE: SIZE:

Peer Review

869,000 SF

AlfaTech provided mechanical, electrical and plumbing peer review engineering services for a new, $1.4 billion, 289-bed hospital located in the Mission Bay area of San Francisco. The facility includes a 183- bed children’s hospital, a 70 -bed hospital for cancer patients, a women’s hospital, a central utility, underground tunnel, bridge, helipad, and parking. In addition, the project i ncludes an outpatient building, energy center, support. The project is OSHPD1.

UC Davis Medical Center

Sacramento, CA

TYPE: SIZE:

Tenant Improvement 83,300 SF

The firm completed three separate projects for UC Davis Medical Center. Electrical design engineering for the conversion of a vacant medical records department to a new radiology suite; preparation of design criteria for the mechanical, electrical and fire protection systems for a new patient medical tower, and; infrastructure analysis of mechanical system in Clinical Lab and Research building. The project is OSHPD1.

Saint Francis Memorial Hospital, Operating Rooms

San Francisco, CA

TYPE:

Tenant Improvement, High-Rise, New OR Rooms

AlfaTech provided engineering design services for several projects at Saint Francis Memorial Hospital, a 12 story, 323-bed hospital tower, located in San Francisco, CA. SFMH is also a Dignity Health network member. Projects included providing nine new OR rooms, including new air handling unit / exhaust system, associated duct work, filtration and control. The project is OSHPD1.

Saint Francis Memorial Hospital, Bothin Burn Center

San Francisco, CA

TYPE: SIZE:

Tenant Improvement, High-Rise 15,500 SF

AlfaTech provided engineering design services for several projects at Saint Francis Memorial Hospital, a 12-story, 323-bed hospital tower, located in San Francisco, CA. SFMH is also a Dignity Health network member.

Projects included converting an entire floor into the Bothin Burn Center, providing new OR rooms, remodeled psychiatry wing and MRI rooms. Additionally, the firm has performed steam boiler and medical gas upgrades, pre-op recovery area, lobby & nurse’s station remodel, refrigerator & freezer replacement and office renovations. The new Bothin Burn Center is a 15,500 SF, 16-bed, intensive care burn unit on the 5th floor of the hospital. Bothin Burn Center is the largest in northern California, treating over 500 burn victims each year. This isolation unit features an independent ventilating system, minimizes the risk of outside contamination and maintains strict room temperature and humidity control.

Sequoia Hospital

Redwood City, CA

TYPE:

Tenant Improvement

AlfaTech provided architectural design, mechanical, electrical, plumbing and structural engineering for the space conversions for six new IDF rooms, and upgrades and modifications to five existing IDF rooms, including the existing MDF and Data Center, the addition of display tracking board monitors in various departments, and a new underground conduit for fiber connection to Building 2900 from the main hospital building. The project is OSHPD1.

Kaiser Permanente Various Locations, CA

Projects : • Kaiser, Los Angeles • Kaiser, Baldwin Park • Kaiser, Fontana

TYPE: SIZE:

Tenant Improvement Multiple Locations

• Kaiser SSF, MOB Generator • Kaiser SSF, ETO Sterilizer • Kaiser SSF, MOB Generator • Kaiser Redwood City, HealthConnect • Kaiser San Rafael, HealthConnect

AlfaTech has been involved in many projects for Kaiser Permanente over the past 20 years. These projects have been for hospitals, as well as medical office buildings, and include modifications, alterations and upgrades for patient rooms, labs, pharmacies, specialty units, and more.

Tier Level 1 – Qualified Vendor

• Kaiser Santa Clara • Kaiser Santa Teresa • Kaiser San Francisco

• Kaiser San Jose • Kaiser Daly City • Kaiser Antioch • Kaiser Oakland • Kaiser Richmond

Kaiser Permanente

Daly City, CA

TYPE: SIZE:

Tenant Improvement 120,000 SF

The firm performed engineering design services for the conversion of a new leased spec office building into a fully functioning 120,000 SF medical office building with exam rooms, patient rooms, doctor’s offices, and one floor of conferencing center.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Santa Rosa, CA

TYPE: SIZE:

Tenant Improvement 350,000 SF

The firm performed mechanical, electrical and plumbing design services for the addition of a new air handling system to serve the labor delivery wing and operating rooms.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Oakland, CA

TYPE:

Historic, Tenant Improvement

AlfaTech provided engineering services for this new medical office building which was a conversion from an historic landmark office building.

Projects : • Offices & Labs • Ultrasound Equipment Installation Design

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Redwood City, CA

TYPE:

Tenant Improvement

The firm performed engineering design services for the remodel of an existing three TR rooms as part of the medical office building HealthConnect IT closets upgrades. The project consists of design of interior lighting and associated controls in existing TR rooms.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Fontana, CA

TYPE:

Tenant Improvements

The firm provided mechanical and electrical engineering design services to the Kaiser Permanente Fontana Medical Center.

Over the years, the firm has worked with several architects on various projects at this medical facility. The first project being with Ware Malcolm in 1996 for a Security Command Center located in the original hospital facility. In 1997, Ware Malcolm again teamed with the firm on some additional projects, including ADA upgrades to toilet room, film storage building, and uninterruptible power supply (UPS) study.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

San Jose, CA

TYPE:

Tenant Improvement

AlfaTech provided MEP engineering for the expansion of the Inpatient Pharmacy and Discharge Patient Pharmacy at Santa Teresa Hospital. The goal of the project was to construct the expanded pharmacies in spaces presently designated for other uses. The design incorporated phasing to facilitate moving the discharge patient pharmacy into the inpatient pharmacy in an interim configuration, prior to the final build out of the discharge patient pharmacy.

Tier Level 1 – Qualified Vendor

Kaiser Permanente Baldwin Park, CA

The firm has worked with several architects to complete more than 30 projects on the Kaiser Baldwin Park Medical Center since 1997. Past work includes telecommunications, PBX and video system upgrades.

The firm was also enlisted to perform a study of the telecommunications room to measure peak electrical demand and subsequently develop documentation to implement an uninterruptable power supply (UPS) and upgraded fire alarm system. This work also included the installation of new cooling to accommodate the new equipment being added to the closet.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Los Angeles, CA

TYPE: SIZE:

Tenant Improvements 8,000 SF

The firm provided equipment replacement and upgrades to multiple locations for Kaiser Permanente Los Angeles Medical Center. The firm supported the Sobin-Harte Architects team on remodels within this sprawling urban campus. The 4910 and 1505 Sunset Blvd. buildings received a replacement of x-ray equipment. 1526 Edgemont building received an 8,000 SF remodel of 6th and 7th floor spaces to accommodate new departments such as GI procedure, recovery, nurse station, exam rooms, offices and conference room.

Tier Level 1 – Qualified Vendor

Stanford University Medical Center

Menlo Park, CA

TYPE:

Tenant Improvement

AlfaTech provided mechanical, electrical and plumbing engineering services for infrastructure upgrades to this medical office building. Services included Electrical Transformer Upgrade & Electrical Distribution, HVAC Upgrade, Fire Sprinkler Upgrade, including coordination with Civil Engineer to bring new Fire Services. Additional services included riser assembly and stub-out for future tenants' improvement (ti) services, plumbing, including replacement of existing plumbing fixtures with new ADA type, & other life safety upgrades as required for city approval, including fire alarm and smoke detection

UCLA Outpatient Surgery And Oncology Center

Santa Monica, CA

TYPE: SIZE: ACCREDITATION:

Tenant Improvement 50,000 SF LEED Gold

The firm performed plumbing and electrical engineering design services for this upgrade to the hospital clinical building area.

The project achieves LEED Gold Certification for New Construction and is the first Outpatient Surgery and Oncology Center in the nation to achieve this rating.

All design elements — from planning to materials — were guided by the concept that a more natural, and less clinical, environment promotes healing in patients and supports alert, productive behavior in doctors, staff, and student.

Good Samaritan Hospital

Los Gatos and San Jose, CA

TYPE:

Tenant Improvements

The firm performed systems analyses and recommended improvements for several projects at Good Samaritan Hospital. A complete infrastructure review and analysis was provided for the hospital mechanical, electrical, plumbing, and medical gas systems. Engineering documents for the proposed new NICU were reviewed for compatibility with the existing infrastructure, code compliance and constructability. The project is OSHPD1.

Good Samaritan Hospital, Mission Oaks Campus

Los Gatos, CA

TYPE: SIZE:

Tenant Improvement 4,000 SF

The firm worked on several projects for Mission Oaks Hospital: conversion of a pain clinic to a breast center; an isolation room system study; and a sterilizer room study. Isolation room mechanical and electrical systems were surveyed for Health Care Access and Information (HCAI), formerly OSHPD-compliance and a report was submitted that documented findings and recommended improvements. The firm also evaluated sterilizer systems against current code requirements. The final report contained information about existing system issues, equipment requirements, and the necessary mechanical and electrical system. The project is OSHPD1.

St. Louise Regional Hospital

Morgan Hill, CA

TYPE: SIZE:

Tenant Improvement 80,000 SF

The firm provided engineering design services for this 80,000 SF stand-alone hospital.

Children’s Hospital, Research Institute

Oakland, CA

TYPE: SIZE:

Tenant Improvement 13,000 SF

The firm performed engineering design services for the remodel conversion of an historic high school building into a modern research laboratory. The project included a large animal facility, labs, lab support, library, and offices. AlfaTech designed the HVAC, fume exhaust, building automation, and plumbing/process piping systems.

Mercy Southwest Hospital

Bakersfield, CA

TYPE: SIZE:

Tenant Improvement 214,000 SF

This new replacement hospital won a design award in 1995 from Modern Healthcare magazine. The firm provided engineering design services for this 112,000 SF family care center, a cardiac/cath lab, 44 acute care beds, 18 LDRP beds, 24 sub-acute beds, a 120-bed skilled nursing facility, 22 primary care beds, and two 30,000 SF medical office buildings.

Napa State Hospital, Building Complex 195

Napa, CA

TYPE: SIZE:

Tenant Improvement 60,000 SF

The firm prepared mechanical and electrical construction documents involving the remodel of patient residential buildings to create double occupancy sleeping rooms. Work included upgrading of HVAC, electrical and fire and life safety systems.

La Clinica De La Raza

Oakland, CA

SIZE: TYPE:

New Construction 40,000 SF

AlfaTech provided mechanical and electrical design for this 3-story, 40,000 SF healthcare facility in downtown Oakland’s urban center. The program on the first floor included a community room/overflow waiting area, dentistry, pharmacy, radiology and lab. Second floor programming includes women’s health, pediatrics and family medicine, 40 exam rooms and provider offices that are organized in two concentric circles, three medical assistant stations adjacent to the provider offices, staff lounge with a kitchen, locker room and shower, conference rooms, balconies library and resource center. Third floor contains 2,300 SF medical records space supported by a dumbwaiter system that moves medical records to and from the second floor’s clinic space, as well as space for billing and registration, medical administration, and multi-functional conference rooms for health education classes, media events and staff training.

South Valley Medical

Gilroy, CA

TYPE: SIZE:

New Construction 30,000 SF

The firm performed engineering mechanical and electrical design services for this new medical office building.

Regional Medical Center

San Jose, CA

TYPE:

Tenant Improvement

AlfaTech provided mechanical, electrical, plumbing and fire protection engineering design services for the design and construction for sterile processing upgrades. The project included tenant improvements for replacing sinks with Steris height adjustable sinks and Steris wash, as well as adding/reconnecting DI water, decontamination sink, relocating eye wash, removing the janitor sing and capping/relocating plumbing, removing single occupancy toilet to make storage room, upgrading the lighting and adding additional lighting, power and maintain negative air pressure. The scope included design for the HVAC distribution for code required ventilation and comfort cooling/heating, electrical normal and emergency power system, and plumbing system. The project is OSHPD1.

St. Mary’s Hospital

San Francisco, CA

TYPE: SIZE:

Tenant Improvement 12,000 SF

The firm performed engineering design services for this mechanical and electrical services were provided to upgrade hospital wing. A study of existing HVAC systems was performed to determine the best way to upgrade them to serve the additional load. Existing supply fan systems were upgraded with new variable frequency drives to replace inefficient inlet dampers for constant volume control.

Dominican Hospital

Santa Cruz, CA

TYPE: SIZE:

Tenant Improvement 43,000 SF

The firm has completed numerous projects for Dominican Hospital. The two largest were renovations to a clinical lab and addition of a new acute care rehabilitation center, which included renovating adjacent patient rooms.

The fume exhaust and air handling systems were upgraded, and provision was made for an improved gas supply system.

Mills/Peninsula Hospital

San Diego, CA

TYPE:

Tenant Improvement

The firm performed engineering design services for the remodel of the seventh floor of Peninsula Hospital. Improvement areas included radiology, physical therapy, labor and delivery rooms, morgue, conference center and mobile lithotripter. Mechanical and electrical engineering services accomplished a utility relocation along with the addition of a 300-ton chiller and associated mechanical/electrical equipment.

Southern California Projects

In 2018, Los Angeles based Levine/Seegel Associates, a full-service MEP firm, joined AlfaTech Consulting Engineers. Below is a partial list of projects completed by Levine/ Seegel and the AlfaTech team.

• Cedars-Sinai Medical Center, Los Angeles, CA • Kaiser Permanente South Bay Medical Center, Harbor

• Spine And Pain Institute, Irvine, CA

• Valley Vascular Association, Santa Clarita, CA

City, CA

• Dr. Daneshrad, Santa Monica, CA

• Los Angeles County Children’s Hospital, Los Angeles,

• Shin Imaging Center, Fullerton, CA

CA

• Dr. Barrett Plastic Surgery, Beverly Hills, CA

• Centinela Hospital Medical Center, Inglewood, CA

• Kaiser Medical Center, Sunset, Los Angeles, CA

• Harbor UCLA Medical Center, Torrance, CA

• Northeast Valley Health Corporation, San Fernando, CA

• LAC + USC Medical Center, Los Angeles, CA

• Glendale Adventist Medical Center, Glendale, CA

• Kaiser Fontana Hospital Replacement, Fontana, CA

• Riverside County Jail Medical Building, Riverside, CA

• Children Hospital Orange County, Orange, CA

• Asian Pacific Health Care Venture, Los Angeles, CA

• Long Beach Memorial Medical Center, Long Beach, CA

• Health South Rehabilitation Hospital, Bakersfield, CA

• Veterans Affairs Long Beach Health Care System,

• St. Joseph Hoag Hospital, Irvine, CA

Long Beach, CA

• Riverside Community Hospital, Riverside, CA

• Silverlake Medical Center, Los Angeles, CA

• City Of Hope – Wing One Renovation, Duarte, CA

• St. John Regional Medical Center, Oxnard, CA

• Barstow Community Hospital, Barstow, CA

• Scripps Memorial Hospital, San Diego, CA

• St. Joseph Hospital, Brea, CA

• Martin Luther King Jr. Community Hospital, Los

• Presbyterian Intercommunity Hospital, Whittier, CA

Angeles, CA

• Pomona Valley Hospital, Pomona, CA

• Westside Pain Specialist, Rancho Cucamonga, CA

• 16th Street Surgery & Oncology Center, Santa Monica, CA

• Santa Monica Orthopedic Hospital, Santa Monica, CA

ALFATECH Sustainability Studio

SUSTAINABLE DESIGN REQUIRES A HOLISTIC APPROACH

SUSTAINABLE DESIGNS REQUIRE A HOLISTIC APPROACH

As our world increasingly focuses on Sustainability, the most critical part of designing a building is choosing materials and systems that are environmentally friendly and will help to conserve resources. AlfaTech focuses on the mechanical, electrical, and plumbing systems required to run a building. Our designers and engineers must consider the occupants’ needs while also considering the impact of the materials and systems on the environment. AlfaTech’s MEP design services aim for sustainable buildings that use less energy and water and generate less waste. We identify synergies and

The ever-increasing demand for resources is a multifaceted issue that requires comprehensive solutions. AlfaTech enables meaningful and lasting design integration through our interdisciplinary team of subject matter experts throughout the U.S. and World-Wide. We measure our success by the resource efficiency, cost savings, and ecological footprint that is delivered to each project.

We take pride in our designs and ensure that the following principles align in our approach to every project:

• Environmental impacts, carbon footprint reduction

• Greenhouse Gases and Carbon

• Imbalance between energy resource and energy use

• Interstate or local differences

• The water and energy nexus

• Waste and ecology

opportunities early in the design process to guide projects toward sustainability and resiliency.

THE VALUE OF BUILDING PERFORMANCE

When it comes to commercial buildings, sustainability is not just about being environmentally friendly. As operating expenses continue to escalate, conservation becomes a necessity rather than a priority. The technical energy savings potential equals the annual energy savings relative to “typical new” equipment. These options are characterized by their technical energy-savings potential, development status, non-energy benefits, and other factors affecting end user acceptance and ability to compete with conventional HVAC technologies. Commercial building owners can create environmentally friendly and cost-effective structures by taking advantage of these new technologies. This will benefit the environment and the bottom line in the long run.

ALFATECH’S SUSTAINABLITY STUDIO

LEED AND WELL ACCREDITATION

Our Sustainability Studio comprises a multi disciplinary team of experts who collaborate to evaluate projects with an integrated approach. Working with owners, architects, and other stakeholders, the team takes a comprehensive, systematic approach to mapping key programming targets. Once a project’s sustainability goals are established, energy, water, and air quality requirements are prioritized collaboratively. The latest system technologies are explored, and concepts suitable to project application are determined. Life cycle analysis, system simulations, and models are utilized for validation. The project team reviews the proposed system concepts to determine impacts and financial benefits at the early design stage.

LEED and WELL are two globally recognized rating systems that measure building performance across several categories. LEED (Leadership in Energy and Environmental Design) is a points based system that assesses a building’s energy efficiency and environmental sustainability. WELL (the WELL Building Standard) focuses on human health and well being, measuring factors such as air quality, daylight, acoustics, and thermal comfort. Although LEED has been around for longer, WELL has gained importance in recent years as more people become aware of the importance of indoor air quality and other factors that affect human health. LEED and WELL certifications can help improve building performance and create a

healthier, more sustainable environment for occupants.

OUR TRACK RECORD

LEED-ACCREDITED PROFESSIONALS

AlfaTech has over 30 employees that are currently USGBC LEED-Accredited professional with several staff members slated to take the test soon.

AlfaTech has experience working with the following:

Photovoltaic Power Generation

Geothermal Water-Source Mechanical System

Enthalpy Wheel Energy Recovery

Non-Chemical Water Treatment

Highly Efficient Plumbing Fixtures

Solar Thermal Systems

Lab/ Hospital Energy Recovery System, including Run Around coil

Underfloor Air Distribution System

Passive Natural Ventilation.

ALFATECH LEED & WELL ACCREDITED PROJECTS

ACCREDIATION

PROJECT

Lucas Museum of Narrative Arts, Los Angeles, CA Delta Products, Fremont, CA

LEED Platinum LEED Platinum, Net Zero LEED Platinum, Net Zero LEED Platinum, WELL Gold

West Berkeley Public Library, Berkeley, CA Uber Mission Bay 1 & 2, San Francisco, CA LinkedIn, 222 2nd Street, San Francisco, CA 23andMe Headquarters, Sunnyvale, CA VMWare, Wenatchee, WA [Confidential Client] Central & Wolfe Campus, Sunnyvale, CA Ohlone Community College, Health Science & Technology Center, Newark, CA University of California - Davis, Gallagher Hall, Davis, CA Station Center Family Housing, Union Center, CA YMCA PG&E Teen Center, Berkeley, CA

LEED Platinum LEED Platinum LEED Platinum LEED Platinum LEED Platinum LEED Platinum LEED Platinum LEED Platinum LEED Platinum

Glendale Pacific Park, Glendale, CA 300 Grant Avenue, San Francisco, CA 750 Second Street, San Francisco, CA 38 Dolores Street/2001 Market, San Francisco, CA PG&E, 77 Beale Street, San Francisco, CA Uber Mission Bay 3 & 4, San Francisco, CA Uber, 200 Matilda, Sunnyvale, CA BART Headquarters, 2150 Webster, Oakland, CA LinkedIn Headquarters, Sunnyvale, CA LinkedIn, 1030 W Maude, Sunnyvale, CA eBay, Building 17, San Jose, CA Tapestry Fulfillment Center, North Las Vegas, NV Visa, 385 Sherman Ave, Palo Alto, CA Okta Headquarters, 100 First Street, San Francisco, CA Okta, 123 N Wacker, 4 th & 5 th Floor, Chicago, IL Okta, Experience Center, New York, NY Charles Schwab, Various Locations ARM Semiconductor, San Jose, CA Aruba Networks, Santa Clara, CA Proofpoint Headquarters, Pathline Park, Sunnyvale, CA CoreSite, Santa Clara, CA

LEED Gold LEED Gold LEED Gold LEED Gold LEED Gold, WELL Platinum LEED Gold Targeting LEED Gold

LEED Gold LEED Gold LEED Gold LEED Gold LEED Gold

Targeting LEED Gold, WELL Silver Targeting LEED Gold, WELL Silver LEED Gold, WELL Silver LEED Gold LEED Gold, WELL Platinum

LEED Gold LEED Gold LEED Gold