Wellness Qualifications

AlfaTech is a consulting engineering firm offering a range of complementary services and expertise in multiple markets. Our services include: Mechanical and Electrical Engineering Design, Technology, Architectural Lighting Design, Commissioning and Energy Solutions, as well as Sustainability.

Wellness

ALFATECH LOCATIONS San Jose, California – HQ | San Francisco, California | Monrovia, California | Orange, California | San Diego, California

INNOVATIVE IDEAS | SUSTAINABLE SOLUTIONS | INTEGRATED PARTNERSHIPS

2023

IFM Group joins VelaTech Holding EDG2 joins VelaTech Holding

2022

Verity Commercial joins VelaTech Holding AlfaTech Asia joins VelaTech Holding

COMPANY PROFILE

2021

Vela Tech Holding, Inc. established

AlfaTech acquired S&K Engineering of Monrovia and LFA Lighting of Ventura. 2020

AlfaTech was established in Silicon Valley in 1987 as a mechanical, electrical, and technology (low voltage, security, and A/V) design engineering firm. Responding to client needs, we expanded our service offerings to include architectural lighting design, sustainability, Smart Building, and project management services. In addition, we expanded into five California offices, including San Jose (Silicon Valley), San Francisco, Monrovia, Orange and San Diego. AlfaTech is gaining ground through organic, merger, and acquisition growth. Establishing Vela Tech portfolio with parent company RSBG, our services reach the West Coast to the Midwest and the East Coast from partner offices in Seattle, Chicago, Reston, and Edison. We also have an international presence with offices throughout Europe, Asia, North Africa, and the Middle East. AlfaTech has a solid reputation forged by a corporate commitment to enduring client relationships and service excellence. We provide complete design, design-assist, and design/build project delivery services. Our project experience includes core and shell, tenant improvements, upgrades, repositioning, and restacks. Each AlfaTech project aims to achieve maximum energy performance, resource conservation, and pollution reduction, resulting in the highest energy savings and sustainability at all design phases while creating a balance of preservation, constructability, schedule, and budget. Given the dynamic nature of what we do, our AlfaTech teams are active listeners, and together with their focus on client and partner relations, are true team players.

2018

AlfaTech partners with RAG Stiftung adding strength of 65+ offices throughout Europe, Asia, Middle East, and Africa.

Celebrates 30 Years Success! 2017

30Y

2006 - 2017

AlfaTech expands Regionally Expands San Francisco Office Opens LA Office Opens San Diego Office AlfaTech Expands Services Architectural Lighting Design Sustainability / LEED and Energy Solutions

2004

AT-PD founded

2003

Named one of the Top 100 Largest Private Companies in San Francisco.

2000

Named one of the Top 100 Fastest Growing Companies in Silicon Valley.

Merges with S&H and MPL. Opens San Francisco office 1996

1987

Jeff Fini, PE, founds AlfaTech MEP & Technology Design in Silicon Valley

LOCATIONS ALFATECH is part of Vela Tech Holding portfolio of companies

VELA TECH HOLDING

AT-PD San Francisco, California Monrovia, California Orange, California San Diego, California VERITY COMMERCIAL Seattle,Washington ALFATECH USA San Jose, California San Francisco, California Chicago, Illinois Reston, Virginia Edison, NewJersey EDG2 Bethesda, Maryland Phoenix, Arizona IFM GROUP San Ramon, California San Diego, California

ALFATECH ASIA Singapore Tokyo, Japan Shanghai, China

Australia Malaysia

SISTER COMPANIES

EUROPE Vienna, Austria Kornberg, Austria Saint-Cannat, France Berlin, Germany

ASIA Dhaka, Bangladesh Tangail, Bangladesh Jakarta, Indonesia Amravati, India Chengalpattu, India Dehradun, India Gandhinagar, India Gujarat, India Mumbai, India New Delhi, India Pune, India Ratnagiri, India Solapur, India Tamil Nadu, India

Bitterfeld, Germany Bochum, Germany Darmstadt, Germany Dresden, Germany Dusseldorf, Germany Eisenhüttenstadt, Germany Erfurt, Germany Essen, Germany Frankfurt am Main, Germany Freiburg, Germany Greifswald, Germany Großostheim, Germany Hamburg, Germany Karlsruhe, Germany Kassel, Germany Köln, Germany Kronberg im Taunus, Germany

Yavatmal, India Lao PDR, Laos Makati City, Philippines Singapore Bangkok, Thailand Ho Chi Minh City, Vietnam

Leipzig, Germany Mainz, Germany Mannheim, Germany Munich, Germany

AMERICAS Toronto, Canada Bogotá, Colombia Bosque de chapultepec, Mexico Lima, Peru

Nuremberg, Germany Regensburg, Germany Ribnitz-Damgarten, Germany

MIDDLE EAST Abu Dhabi, UAE

Rostock, Germany Stralsund, Germany Stuttgart, Germany Wiesbaden, Germany Wirges, Germany Würzburg, Germany Athens, Greece Milan, Italy Podgorica, Montenegro Belgrade, Serbia Birmingham, UK Bishop‘s Stortford, UK Bristol, UK Chamberlain, UK Croydon, UK Exeter, UK Leamington Spa, UK Leeds, UK London, UK Luton, UK Manchester, UK Mold, UK Nottingham, UK Stockport, UK Sunderland, UK Wakefield, UK Warwickshire, UK

Al Ain, UAE Dubai, UAE

Madinat Zayed, UAE Ras Al Khaimah, UAE Jeddah, Saudi Arabia Riyadh, Saudi Arabia Al-Zahra City, Gaza Strip Amman, Jordan Baghdad, Iraq Doha, Qatar Istanbul, Turkey Kuwait Sharq, Kuwait Muscat, Oman

AFRICA Algier, Algeria Alexandria, Egypt

Assiut, Egypt Cairo, Egypt Giza, Egypt Dar es Salaam, Tanzania Tunis, Tunisia

Kampala, Uganda Khartoum, Sudan

ALFATECH ENGINEERING

ENGINEERING STUDIO We provide the most advanced, professional engineering services that ensure buildings thrive. We partner with clients to turn their visions into a tangible reality. As one of the leading MEP consultants in the Western U.S., AlfaTech strives to improve the life of hundreds of thousands of Americans every day through the buildings we design. Coining the expression “Innovation & Excellence,” we provide the most advanced, professional engineering services that ensure buildings thrive. We partner with clients to turn their visions into a tangible reality.. To us, conscious design elements are indispensable in meeting the escalating expectations emerging within vibrant and diverse typologies. We believe the highest-efficiency buildings transpire from mirroring the sustainable features inherent to the world around us. Propelling cutting-edge solutions requires a thoughtful design that can interact with the physical environment. Elements like smart buildings, reduced reheat, and synergies before waste initiate perpetual savings. Eager to do our part, we pride ourselves on designing state-of-the-art facilities that reach unprecedented levels of integration. We think that sustainable design is more than just a phrase. It is a perspective. We are committed to rock-solid partnerships with our clients by delivering on our promise always to excel.

OCCUPANCY

DESIGN

CONSTRUCTION

END OF USE

SUSTAINABLITY

PROCESS ENGINEERING DESIGN

MECHANICAL ENGINEERING DESIGN

ELECTRICAL ENGINEERING DESIGN

ARCHITECTURAL LIGHTING DESIGN

TECHNOLOGY

COMMISSIONING / ENERGY SOLUTIONS

RETRO COMMISSIONING

LIFE OF A BUILDING

ARCHITECTURAL LIGHTING DESIGN Lighting and Lighting Controls Lighting Calculations Customized ROI Calculations Sustainable Lighting Design Energy Savings Analysis Custom Lighting Fixtures Custom Lighting Fixtures Design

COMMISSIONING & ENERGY SOLUTIONS Early Quantifiable Energy Study Incentives Energy Star® Assessments Retro-commissioning (RCx) Monitoring Brand Continuous Commissioning (MBCCx) ASHRAE Level 1, 2 and 3 Energy Audits Measurement and Verification (M&V) of installed projects Energy Modeling Net Zero Energy Budgeting HVAC/Chilled Water Plant Optimization SUSTAINABILITY Sustainability Planning (Organizational and Infrastructural) LEED / Green Building Consulting Masterplanning Life Cycle Cost Assessment Occupant Wellness and Comfort Façade Engineering CFD / Wind Studies Wind Studies Thermal Stratification Studies Energy Concept Studies

ELECTRICAL ENGINEERING DESIGN Power Systems Emergency & Standby Power Lighting and Lighting Controls Security Systems 24 / 7 Power Systems (UPS) Power Monitoring Systems Toxic Gas Monitoring Graphic Control and Alarm Panels Grounding and Bonding Industrial Hygiene Systems Low Tolerance Temp Control Title 24 Analysis and Design Heat Recovery Systems Central Utility Plants Air Handlers HVAC System Controls PLC Programming Fire Protection and Plumbing MECHANICAL ENGINEERING DESIGN HVAC Heating Systems Water and Gas Cooling Systems / Chilled Water Dehumidification Systems Contamination Sensitive Areas

TECHNOLOGY CONSULTING AND DESIGN

Low Voltage Design Audio Visual Design

Security Systems Design Architectural Acoustics Wireless Design & Modeling

Distributed Antenna Systems (DAS) Integrated Building Management Systems BMS Network Integration Telco Facilities and Services Voice Systems and Applications Relocation & Data Center Migration Services Strategic Planning and Analysis Project Management Management Consulting

Energy Management Energy Conservation Fire Alarm Systems Public Address Systems Plug Loads Control

ALFATECH PROJECT EXPERIENCE

650 Raymond Avenue, Medical Office Building

Pasadena, CA

TYPE:

New Construction, Core & Shell 42,000 SF

SIZE:

AlfaTech design services included core and shell MEP systems to support the new 4-story mixed-use facility and its 5-level underground parking structure (4 parking, 1 surgical center). Programing includes 32,000 SF of medical space for Specialty Practice, Internal Medicine and Family Practice, Pediatrics, OB/GYN, Lab, Imaging, and Central Scheduling and administrative offices as well as 3,331 SF of retail space. The MEP systems are designed to Health Care Access and Information (HCAI), formerly OSHPD3 standards, and 3,331 SF of retail space is supported with a VRF system.

Cedars-Sinai, Brentwood Urgent Care & Dermatology Clinic

11620 Wilshire Boulevard, Los Angeles, CA

TYPE: SIZE:

Tenant Improvement 7,500 SF

AlfaTech provided mechanical, electrical and plumbing engineering and architectural lighting design services for Suite 100 &105, totaling 7,500 SF, and approximately 60% of the overall floor plate. The scope included addition of urgent care clinic including lobby, exam rooms, x-ray, infusion rooms, as well as upscale Dermatology Practice with full service cosmetic and medical treatment center with laser, and dermatology exam rooms.

MLK Wellness Center

Los Angeles, CA

TYPE: SIZE: ACCREDITATION:

New Construction 52,000 SF

LEED Silver for Core & Shell

AlfaTech provided MEP engineering design for this ground up construction project for a two story, Health Care Access and Information (HCAI), formerly OSHPD 3, medical office building, approx. 52,000 SF. Programming for the first floor includes a primary care clinic with exam and procedure rooms, dental, behavioral health and provider offices. The second floor includes an outpatient ambulatory surgery center with four operating rooms, Pre-Op/PACU and an in-house sterile processing department to support the surgery suite. Additional services include a wound care suite and a telehealth program, offering on-going virtual follow-up support for patients. The remainder of the two floors consists of unfinished shell space that the hospital intends to outfit with vital services that may include dialysis, infusion, imaging, and pharmacy. 250 parking spaces with 6 EVSE charging stations.

This facility reduces the low-acuity patient load to the main hospital, ultimately providing the surrounding area with unprecedented access to health and well-being equity and empowerment.

Indio Behavioral Hospital*

Indio, CA

TYPE: SIZE:

New Construction 75,000 SF

Provided engineering design services for this new behavioral hospital with patient rooms and admin buildings.

* Completed by AlfaTech principal during previous employment

Project Héroe

AlfaTech was part of the interdisciplinary task force led by the USC School of Architecture, the Keck School of Medicine of USC and internationally recognized architecture firm HLW as well as consultants, medical experts, contractors and developers in the development of Project Héroe, a massive, city-scale endeavor as a proactive, rather than reactive approach to addressing future pandemic outbreaks at ground zero with a rapidly deployable, high-tech emergency mobile medical center designed around modular shipping containers that can be quickly deployed in environments ranging from inner cities to the rural countryside. The Project Héroe facility includes six building types: the hospital unit itself with exam rooms, operating rooms and radiology imaging laboratories; patient rooms which spin off the central hub; staff housing; an amenity, such as a cafeteria, fitness area, contact tracing offices, conferencing center, or outdoor garden; a small triage building that can be placed throughout the entire host city; and a storage center that could house security, IT infrastructure, and decontamination. Once each unit is built, it’s self -sufficient. Each room has its own MEP and fire protection system, while each building has its own emergency generator, water tank, and blackwater tank.

Santa Clara Valley Medical Center

Santa Clara, CA

TYPE: SIZE:

Tenant Improvement 120,000 SF

AlfaTech performed mechanical and electrical engineering design services for this 3-story medical office building which included converting existing office space into medical exam rooms, patient treatment rooms, physical therapy suites and a new pharmacy. An AIDS/ICH treatment clinic was provided; complete with patient treatment "negative pressure" isolation rooms. Significant HVAC upgrades where required for the renovation. New power and telephone/data distribution throughout the entire building was required and new lighting for the upgraded areas. A new fire alarm system was specified, and the corridors were upgraded to bring the building up to current code requirements. The project is OSHPD1.

Santa Clara Valley Medical Center, Old Main East & West

Santa Clara, CA

TYPE: SIZE:

Tenant Improvement 23,800 SF

AlfaTech provided mechanical, electrical, plumbing and fire protection engineering services for the structural strengthening of Old Main West and portion of Old Main East – basement through 3rd floors, including the demolition of OM West 4th through 7th floors and demolition of OM East basement through 7th floors. MEP Services included design for rooftop HVAC system design to provide maximum ventilation and exhaust systems to the three-story building and basement, and ventilation of the corridors running down the center of the building, two new elevators and exit stairs.

Santa Clara Valley Medical Center, North Loop Extension

Santa Clara, CA

TYPE:

Site Improvement

AlfaTech provided mechanical and electrical engineering services for the design and construction for the North Loop Utility Extension of the high voltage 12kV, high pressure steam, chilled water and low voltage system to the rehab buildings at Santa Clara Valley Medical Center.

UCSF Medical Center

San Francisco, CA

TYPE: SIZE:

Peer Review

869,000 SF

AlfaTech provided mechanical, electrical and plumbing peer review engineering services for a new, $1.4 billion, 289-bed hospital located in the Mission Bay area of San Francisco. The facility includes a 183- bed children’s hospital, a 70 -bed hospital for cancer patients, a women’s hospital, a central utility, underground tunnel, bridge, helipad, and parking. In addition, the project i ncludes an outpatient building, energy center, support. The project is OSHPD1.

UC Davis Medical Center

Sacramento, CA

TYPE: SIZE:

Tenant Improvement 83,300 SF

The firm completed three separate projects for UC Davis Medical Center. Electrical design engineering for the conversion of a vacant medical records department to a new radiology suite; preparation of design criteria for the mechanical, electrical and fire protection systems for a new patient medical tower, and; infrastructure analysis of mechanical system in Clinical Lab and Research building. The project is OSHPD1.

El Camino Hospital

Los Gatos, CA

TYPE: SIZE:

Tenant Improvement 13,650 SF

Formerly the Community Hospital of Los Gatos. AlfaTech provided complete mechanical and electrical engineering design for HVAC, plumbing, medical gases, power, lighting and signaling for the new endoscopy unit. Endoscopy equipment included emergency power systems. The obstetrics wing required a complete remodel with new systems.

Saint Francis Memorial Hospital, Bothin Burn Center

San Francisco, CA

TYPE: SIZE:

Tenant Improvement, High-Rise Multiple Projects

AlfaTech provided engineering design services for several projects at Saint Francis Memorial Hospital, a 12-story, 323-bed hospital tower, located in San Francisco, CA. SFMH is also a Dignity Health network member.

Projects included converting an entire floor into the Bothin Burn Center, remodeled psychiatry wing and MRI rooms. Additionally, the firm has performed steam boiler and medical gas upgrades, pre- op recovery area, lobby & nurse’s station remodel, refrigerator & freezer replacement and office renovations. The new Bothin Burn Center is a 15,500 SF, 16-bed, intensive care burn unit on the 5th floor of the hospital. Bothin Burn Center is the largest in northern California, treating over 500 burn victims each year. This isolation unit features an independent ventilating system, minimizes the risk of outside contamination and maintains strict room temperature and humidity control. The building is OSHPD1/HCAi1.

Saint Francis Memorial Hospital, Operating Rooms

San Francisco, CA

TYPE:

Tenant Improvement, High-Rise, New OR Rooms

AlfaTech provided engineering design services for several projects at Saint Francis Memorial Hospital, a 12 story, 323-bed hospital tower, located in San Francisco, CA. SFMH is also a Dignity Health network member. Projects included providing nine new OR rooms, including new air handling unit / exhaust system, associated duct work, filtration and control. The project is OSHPD1.

O’Connor Hospital

San Jose, CA

TYPE: SIZE:

Tenant Improvement 5,000 SF

The firm performed full design services for new endovascular suite/operating room in existing hospital. Ongoing projects include recent cardiac/cath lab remodel, and mechanical and electrical design for future remodel/expansion projects. The new MRI imaging room included four restrooms, a break room, a Gurney Room, Storage Rooms, a Prayer Room, a Control Room, a MRI Room, a Dressing Room, a Waiting Room, a Reception Room and an Equipment Room. The project is OSHPD1.

Sequoia Hospital

Redwood City, CA

TYPE:

Tenant Improvement

AlfaTech provided architectural design, mechanical, electrical, plumbing and structural engineering for the space conversions for six new IDF rooms, and upgrades and modifications to five existing IDF rooms, including the existing MDF and Data Center, the addition of display tracking board monitors in various departments, and a new underground conduit for fiber connection to Building 2900 from the main hospital building. The project is OSHPD1.

Kaiser Permanente Various Locations, CA

Projects : • Kaiser, Los Angeles • Kaiser, Baldwin Park • Kaiser, Fontana

TYPE: SIZE:

Tenant Improvement Multiple Locations

• Kaiser SSF, MOB Generator • Kaiser SSF, ETO Sterilizer • Kaiser SSF, MOB Generator • Kaiser Redwood City, HealthConnect • Kaiser San Rafael, HealthConnect

AlfaTech has been involved in many projects for Kaiser Permanente over the past 20 years. These projects have been for hospitals, as well as medical office buildings, and include modifications, alterations and upgrades for patient rooms, labs, pharmacies, specialty units, and more.

Tier Level 1 – Qualified Vendor

• Kaiser Santa Clara • Kaiser Santa Teresa • Kaiser San Francisco

• Kaiser San Jose • Kaiser Daly City • Kaiser Antioch • Kaiser Oakland • Kaiser Richmond

Kaiser Permanente

Daly City, CA

TYPE: SIZE:

Tenant Improvement 120,000 SF

The firm performed engineering design services for the conversion of a new leased spec office building into a fully functioning 120,000 SF medical office building with exam rooms, patient rooms, doctor’s offices, and one floor of conferencing center.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Santa Rosa, CA

TYPE: SIZE:

Tenant Improvement 350,000 SF

The firm performed mechanical, electrical and plumbing design services for the addition of a new air handling system to serve the labor delivery wing and operating rooms.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Oakland, CA

TYPE:

Historic, Tenant Improvement

AlfaTech provided engineering services for this new medical office building which was a conversion from an historic landmark office building.

Projects : • Offices & Labs • Ultrasound Equipment Installation Design

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Redwood City, CA

TYPE:

Tenant Improvement

The firm performed engineering design services for the remodel of an existing three TR rooms as part of the medical office building HealthConnect IT closets upgrades. The project consists of design of interior lighting and associated controls in existing TR rooms.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Fontana, CA

TYPE:

Tenant Improvements

The firm provided mechanical and electrical engineering design services to the Kaiser Permanente Fontana Medical Center.

Over the years, the firm has worked with several architects on various projects at this medical facility. The first project being with Ware Malcolm in 1996 for a Security Command Center located in the original hospital facility. In 1997, Ware Malcolm again teamed with the firm on some additional projects, including ADA upgrades to toilet room, film storage building, and uninterruptible power supply (UPS) study.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

San Jose, CA

TYPE:

Tenant Improvement

AlfaTech provided MEP engineering for the expansion of the Inpatient Pharmacy and Discharge Patient Pharmacy at Santa Teresa Hospital. The goal of the project was to construct the expanded pharmacies in spaces presently designated for other uses. The design incorporated phasing to facilitate moving the discharge patient pharmacy into the inpatient pharmacy in an interim configuration, prior to the final build out of the discharge patient pharmacy.

Tier Level 1 – Qualified Vendor

Kaiser Permanente Baldwin Park, CA

The firm has worked with several architects to complete more than 30 projects on the Kaiser Baldwin Park Medical Center since 1997. Past work includes telecommunications, PBX and video system upgrades.

The firm was also enlisted to perform a study of the telecommunications room to measure peak electrical demand and subsequently develop documentation to implement an uninterruptable power supply (UPS) and upgraded fire alarm system. This work also included the installation of new cooling to accommodate the new equipment being added to the closet.

Tier Level 1 – Qualified Vendor

Kaiser Permanente

Los Angeles, CA

TYPE: SIZE:

Tenant Improvements 8,000 SF

The firm provided equipment replacement and upgrades to multiple locations for Kaiser Permanente Los Angeles Medical Center. The firm supported the Sobin-Harte Architects team on remodels within this sprawling urban campus. The 4910 and 1505 Sunset Blvd. buildings received a replacement of x-ray equipment. 1526 Edgemont building received an 8,000 SF remodel of 6th and 7th floor spaces to accommodate new departments such as GI procedure, recovery, nurse station, exam rooms, offices and conference room.

Tier Level 1 – Qualified Vendor

Stanford University Medical Center

Menlo Park, CA

TYPE:

Tenant Improvement

AlfaTech provided mechanical, electrical and plumbing engineering services for infrastructure upgrades to this medical office building. Services included Electrical Transformer Upgrade & Electrical Distribution, HVAC Upgrade, Fire Sprinkler Upgrade, including coordination with Civil Engineer to bring new Fire Services. Additional services included riser assembly and stub-out for future tenants' improvement (ti) services, plumbing, including replacement of existing plumbing fixtures with new ADA type, & other life safety upgrades as required for city approval, including fire alarm and smoke detection

UCLA Outpatient Surgery And Oncology Center

Santa Monica, CA

TYPE: SIZE: ACCREDITATION:

Tenant Improvement 50,000 SF LEED Gold

The firm performed plumbing and electrical engineering design services for this upgrade to the hospital clinical building area.

The project achieves LEED Gold Certification for New Construction and is the first Outpatient Surgery and Oncology Center in the nation to achieve this rating.

All design elements — from planning to materials — were guided by the concept that a more natural, and less clinical, environment promotes healing in patients and supports alert, productive behavior in doctors, staff, and student.

Good Samaritan Hospital

Los Gatos and San Jose, CA

TYPE:

Tenant Improvements

The firm performed systems analyses and recommended improvements for several projects at Good Samaritan Hospital. A complete infrastructure review and analysis was provided for the hospital mechanical, electrical, plumbing, and medical gas systems. Engineering documents for the proposed new NICU were reviewed for compatibility with the existing infrastructure, code compliance and constructability. The project is OSHPD1.

Good Samaritan Hospital, Mission Oaks Campus

Los Gatos, CA

TYPE: SIZE:

Tenant Improvement 4,000 SF

The firm worked on several projects for Mission Oaks Hospital: conversion of a pain clinic to a breast center; an isolation room system study; and a sterilizer room study. Isolation room mechanical and electrical systems were surveyed for Health Care Access and Information (HCAI), formerly OSHPD-compliance and a report was submitted that documented findings and recommended improvements. The firm also evaluated sterilizer systems against current code requirements. The final report contained information about existing system issues, equipment requirements, and the necessary mechanical and electrical system. The project is OSHPD1.

St. Louise Regional Hospital

Morgan Hill, CA

TYPE: SIZE:

Tenant Improvement 80,000 SF

The firm provided engineering design services for this 80,000 SF stand-alone hospital.

Children’s Hospital, Research Institute

Oakland, CA

TYPE: SIZE:

Tenant Improvement 13,000 SF

The firm performed engineering design services for the remodel conversion of an historic high school building into a modern research laboratory. The project included a large animal facility, labs, lab support, library, and offices. AlfaTech designed the HVAC, fume exhaust, building automation, and plumbing/process piping systems.

Mercy Southwest Hospital

Bakersfield, CA

TYPE: SIZE:

Tenant Improvement 214,000 SF

This new replacement hospital won a design award in 1995 from Modern Healthcare magazine. The firm provided engineering design services for this 112,000 SF family care center, a cardiac/cath lab, 44 acute care beds, 18 LDRP beds, 24 sub-acute beds, a 120-bed skilled nursing facility, 22 primary care beds, and two 30,000 SF medical office buildings.

Napa State Hospital, Building Complex 195

Napa, CA

TYPE: SIZE:

Tenant Improvement 60,000 SF

The firm prepared mechanical and electrical construction documents involving the remodel of patient residential buildings to create double occupancy sleeping rooms. Work included upgrading of HVAC, electrical and fire and life safety systems.

La Clinica De La Raza

Oakland, CA

SIZE: TYPE:

New Construction 40,000 SF

AlfaTech provided mechanical and electrical design for this 3-story, 40,000 SF healthcare facility in downtown Oakland’s urban center. The program on the first floor included a community room/overflow waiting area, dentistry, pharmacy, radiology and lab. Second floor programming includes women’s health, pediatrics and family medicine, 40 exam rooms and provider offices that are organized in two concentric circles, three medical assistant stations adjacent to the provider offices, staff lounge with a kitchen, locker room and shower, conference rooms, balconies library and resource center. Third floor contains 2,300 SF medical records space supported by a dumbwaiter system that moves medical records to and from the second floor’s clinic space, as well as space for billing and registration, medical administration, and multi-functional conference rooms for health education classes, media events and staff training.

South Valley Medical

Gilroy, CA

TYPE: SIZE:

New Construction 30,000 SF

The firm performed engineering mechanical and electrical design services for this new medical office building.

Regional Medical Center

San Jose, CA

TYPE:

Tenant Improvement

AlfaTech provided mechanical, electrical, plumbing and fire protection engineering design services for the design and construction for sterile processing upgrades. The project included tenant improvements for replacing sinks with Steris height adjustable sinks and Steris wash, as well as adding/reconnecting DI water, decontamination sink, relocating eye wash, removing the janitor sing and capping/relocating plumbing, removing single occupancy toilet to make storage room, upgrading the lighting and adding additional lighting, power and maintain negative air pressure. The scope included design for the HVAC distribution for code required ventilation and comfort cooling/heating, electrical normal and emergency power system, and plumbing system. The project is OSHPD1.

St. Mary’s Hospital

San Francisco, CA

TYPE: SIZE:

Tenant Improvement 12,000 SF

The firm performed engineering design services for this mechanical and electrical services were provided to upgrade hospital wing. A study of existing HVAC systems was performed to determine the best way to upgrade them to serve the additional load. Existing supply fan systems were upgraded with new variable frequency drives to replace inefficient inlet dampers for constant volume control.

Dominican Hospital

Santa Cruz, CA

TYPE: SIZE:

Tenant Improvement 43,000 SF

The firm has completed numerous projects for Dominican Hospital. The two largest were renovations to a clinical lab and addition of a new acute care rehabilitation center, which included renovating adjacent patient rooms.

The fume exhaust and air handling systems were upgraded, and provision was made for an improved gas supply system.

Mills/Peninsula Hospital

San Diego, CA

TYPE:

Tenant Improvement

The firm performed engineering design services for the remodel of the seventh floor of Peninsula Hospital. Improvement areas included radiology, physical therapy, labor and delivery rooms, morgue, conference center and mobile lithotripter. Mechanical and electrical engineering services accomplished a utility relocation along with the addition of a 300-ton chiller and associated mechanical/electrical equipment.

Burbank Pacific Medical Center

Burbank, CA

TYPE: SIZE:

Tenant Improvement 60,000 SF

Engineering design services for the 498-bed 60,000 SF medical office building. The project focused on a core and shell infrastructure upgrade.

Casa Colina Center of Physical Therapy

Azusa, CA

TYPE: SIZE:

Tenant Improvement 6,000 SF

Engineering design services for the 6,000 SF space. The building is equipped with private treatment rooms and a comprehensive range of exercise equipment, including treadmills, stationary upright bikes, recumbent bikes, elliptical cross trainers, and a Power Plate machine. The facility also features various weight machines, the latest FreeMotion and Life Fitness equipment, free weights, and medicine balls. The center also provides electrical stimulation and ultrasound therapy.

Pacific Gardens Nursing and Rehabilitation Center

Fresno, CA

TYPE:

Tenant Improvement

Engineering design services for the 180-bed rehabilitation center. The facility offers amenities such as Pharmacy services, a laboratory, podiatry, optometry, and hospice.

Eastland Skilled Nursing Facility

El Monte, CA

TYPE: SIZE:

Tenant Improvement 12,000 SF

Engineering design services for the substantial healthcare facility with 139 beds under individual, for-profit ownership is distinct from continuing care retirement communities. This project involved a Tenant Improvement effort that spans approximately 12,000 SF, transforming the space into a sub-acute care facility.

Marriott Assisted Living Skilled Nursing Facility

San Juan Capistrano & Yorba Linda, CA

TYPE: SIZE:

Tenant Improvement 180,000 SF

San Juan Capistrano: Engineering design services to the 2-story, 90,000 SF assisted living with memory care and SNF sections. The 45-bed care community is located at 31741 Rancho Viejo Road. The nursing facility offers services such as Physical Therapy, Pharmaceutical Service, Occupational Therapy, Radiation Therapy, and 24-hour Nurse Assistance. Yorba Linda: Engineering design services to the 2-story, 90,000 SF assisted living with memory care and SNF sections. The complex has 90 apartments and 45 beds for nursing care, plus 25 additional suites for people with Alzheimer’s disease and other memory -related disorders. The center is at 17803 Imperial Highway in Yorba Linda, CA.

The Children’s Hospital of San Antonio

San Antonio, TX

TYPE: SIZE:

Tenant Improvement 521,000 SF

The firm performed engineering design services for 521,000 SF building extension in 12 floor. They provide roughly 7,000 patient visits annually with 196 staffed beds.

San Quentin State Prison, Central Health Services Building

San Quentin, CA

TYPE: SIZE: ACCREDIATION:

Design-Build, Historic 5-story, 132,00 SF LEED Gold

AlfaTech provided mechanical and plumbing design services Including Construction Administration for the design-build new 132,000 SF five-story Central Health Services Building at San Quentin State Prison which is an OSHPD Compliant state-of-the-art medical, dental and mental health care services to more than 5,200 inmates. Focus areas include outpatient clinical services, specialty clinical services, licensed inpatient care (Correctional Treatment Center), outpatient housing care, pharmacy, medical records, administration and support. The fifth floor provides administrative spaces for the professional staff working at the facility and provides training rooms and conference spaces that overlook Mount Tamalpais. Situated within the maximum-security perimeter of San Quentin State Prison and adjacent to the inmate recreation yard and housing units, the facility also serves as Northern California’s Receive and Release facility. The project also included significant amounts of infrastructure and site improvements, demolition of existing buildings, and seismic upgrades for two historic structures including an 1850’s Stone Dungeon. The project is OSHPD-compliant. The project is OSHPD 3.

Kaiser Permanente Santa Teresa Hospital Pharmacy

San Jose, CA

TYPE: SIZE:

Tenant Improvement

AlfaTech provided MEP engineering for the expansion of the Inpatient Pharmacy and Discharge Patient Pharmacy at Santa Teresa Hospital. The goal of the project was to construct the expanded pharmacies in spaces presently designated for other uses. The design incorporated phasing to facilitate moving the discharge patient pharmacy into the inpatient pharmacy in an interim configuration, prior to the final build out of the discharge patient pharmacy.

North Bay Medical Center

Fairfield, CA

TYPE SIZE:

Tenant Improvement 6,500 SF

The firm performed engineering design services for the remodel of clinical laboratory and pediatric unit. Project scope included a cafeteria expansion and renovations to the nurses’ lounge and workroom, nourishment station, medication area and office space. Full mechanical, electrical, plumbing and fire protection design.

Medical Arts Center

Campbell, CA

TYPE: SIZE:

New Construction 40,000 SF

The firm performed engineering design services for this new 4-story medical office building containing outpatient surgery and general services, CAT scanner, and doctors’ suites with individual examination and office areas.

Mission Oaks Hospital

Los Gatos, CA

TYPE: SIZE:

New Construction 4,000 SF

The firm worked on several projects for Mission Oaks Hospital: conversion of a pain clinic to a breast center; an isolation room system study; and a sterilizer room study. Isolation room mechanical and electrical systems were surveyed for Health Care Access and Information (HCAI), formerly OSHPD-compliance and a report was submitted that documented findings and recommended improvements. The firm also evaluated sterilizer systems against current code requirements. The final report contained information about existing system issues, equipment requirements, and the necessary mechanical and electrical system modifications.

Regional Health Center Of San Jose

San Jose, CA

TYPE: SIZE:

Tenant Improvement 70,000 SF

The firm prepared the mechanical, electrical and plumbing design for the upgrade of 4 HVAC systems to comply with Health Care Access and Information (HCAI), formerly OSHPD code requirements. Modifications were made to upgrade the existing domestic water distribution systems; including the incorporation of an instantaneous domestic hot water system. A new condensate return system replaced an existing non-functional system. Modifications to the electrical distribution system were made to accommodate the new equipment. Modifications were made to the existing fire alarm system to achieve HCAI code compliance.

Regional Health Center Of San Jose

San Jose, CA

TYE:

Tenant Improvement

The firm performed engineering design services to revise the current mechanical, electrical and plumbing design to accommodate the installation of a new GE Advantx HF 65 X-ray machine and support equipment. The HVAC system was modified to comply with current Health Care Access and Information (HCAI), formerly OSHPD requirements. The electrical distribution system was modified to supply power to the new x-ray machine and support equipment. Fire alarm system was made to comply with HCAI requirements. Our services include a comprehensive electrical systems study at Evergreen Dialysis Clinic, and for a new clinic in central San Jose. The latter was further studied for future expansion to 20 stations. The study included all primary utility power and secondary power distribution with panel boards for each floor.

Regional Health Center Of San Jose

San Jose, CA

TYPE: SIZE:

Tenant Improvement 6,000 SF

The firm performed engineering design services for the upgrade of the Cath Lab X-ray machine and support equipment.

Regional Health Center Of San Jose

San Jose, CA

TYPE: SIZE:

Tenant Improvement 14,000 SF

The firm prepared design for the change out of the existing Radiology Room X-ray machine and providing the electrical and mechanical infrastructure for the new X-ray machine and support equipment. The firm also designed a mechanical system that will support Radiology Room 4 and Radiology Rooms 5 and 6 in the future. Additionally, the firm provided design services for the conversion of two chart rooms into two medicine rooms and two chart rooms.

Regional Health Center Of San Jose

San Jose, CA

TYPE: SIZE:

Tenant Improvement 14,000 SF

The firm prepared the mechanical, electrical and plumbing design for the upgrade of the CT Scanner Room and Radiology Room 1. A new roof-top air handler and exhaust fan were added. Power was redistributed for X-ray and support equipment. The existing darkroom was relocated and upgraded to a Digital Processing Room. Modifications were made to the existing fire alarm system for Health Care Access and Information (HCAI), formerly OSHPD code compliance.

Regional Health Center Of San Jose

San Jose, CA

TYPE: SIZE:

Tenant Improvement 12,000 SF

The firm prepared the mechanical, electrical and plumbing design for the upgrade of two existing Radiology Room X-ray machines and provided the electrical and mechanical infrastructure for the new X-ray machine and support equipment. The firm designed the mechanical system that will support Radiology Room 4 and Radiology Room 5 and Radiology Room 6 in the future. Modifications were made to the existing fire alarm system to achieve Health Care Access and Information (HCAI), formerly OSHPD code compliance. We also provided design services for the conversion of two chart rooms into two medicine rooms and two chart rooms.

Veterans Administration

Various Location

TYPE:

Various Projects

AlfaTech has completed numerous projects for the Veterans Administration at sites throughout Northern California. These have ranged in size and scope from an 8,000 SF clinical lab renovation to an 180,000 SF primary care/ambulatory care center. Engineering services have included mechanical, electrical, plumbing, fire protection, and telecommunication systems design, as well as infrastructure analysis.

ALFATECH www.atce.com

Made with FlippingBook Ebook Creator