Workplace (Socal) Qualifications

Beyond Meat Headquarters 888 N Douglas St, El Segundo, CA

TYPE: SIZE:

Tenant Improvement, Core and Shell Alterations 250,000 SF

AlfaTech provided mechanical, electrical, plumbing, fire protection and process piping engineering design services for the relocation to the new headquarters for Beyond Meat into an existing 2-story building. Project includes complete demolition of the interior and consists of a 143,000 SF dedicated to R&D, lab space, test kitchens, and refrigerated storage, along with 107,000 SF designated for office space, in a phased construction. Project included the design of the “house” high -pressure steam system (100 PSIG), including steam boilers, a deaerator/boiler feedwater system, a blowdown tank, a flash tank, chemical treatment, steam system controls, a steam distribution system (including expansion joints), steam trapping, condensate distribution, condensate pumps, condensate coolers, and more. The project also includes a "clean-steam" generator and a distribution system for clean steam.

Made with FlippingBook - professional solution for displaying marketing and sales documents online