Healthcare Qualifications

Richard Tran, EIT

Associate

Sr. Mechanical Engineer richard.tran@atce.com

PROFESSIONAL CAREER

2005 - Present

PROJECT EXPERIENCE

*BEVERLY HOSPITAL, Montebello, CA Mechanical engineering design services for the Beverly Hospital in Montebello, CA. Services included a new 1,500 KW emergency generator upgrade, Chiller, boiler and cooling tower replacement, ECC Expansion and remodel, Postpartum patient unit conversion, Angio/Cath lab remodel, USP 797/800 compounding pharmacy, and MRI replacement. *KAISER FONTANA MEDICAL CENTER, Fontana, CA Mechanical engineering design services for the 490,000 SF Kaiser Fontana Medical Center in Fontana, CA. Services included new patient and D & T towers, a new 23,000 SF Central Utility Plan (CUP), and new 50,000 SF Hospital Support Building (HSB). *KAISER OAKLAND MEDICAL CENTER, Oakland, CA Mechanical engineering design services for the New 319 bed hospital in Oakland, CA. Services included a new hospital support building a a Central Utility Plant. HSB and CUP approximately 680,000 SF. *KAISER LOS ANGELES MEDICAL CENTER, Los Angeles, CA Mechanical engineering design services for the Kaiser building in Los Angeles, CA. Services included the new hospital buildings of stage 1 and stage 2 expansion. *GLENDALE ADVENTIST MEDICAL CENTER, Glendale, CA Mechanical engineering design services for the tenant improvements for the West Tower Phase III, adding 35,000 SF of space and 60 new beds including two intensive care units and two new surgical telemetry units at the Glendale Medical Center in Glendale, CA. *UCLA HEALTH: • UCLA Encino, Imaging Center Conversion • UCLA Barbara Kort Imaging Center • UCLA Arizona TI remodel • UCLA, Los Angeles – MP300 & 200 – IDF rooms VRF system HVAC upgrade • UCLA Rolling Hills Estates – Imaging Center – New VRF system *KAISER MEDICAL CENTER, Los Angeles, CA • 4950 Remodel levels 5 and 6 to Cancer Services and pharmacy USP 800 • 4950 TI improvement to other levels • 1515 Edgemont – CUP 5,321 ton (14) cooling towers and water filter system • 4900 & 4950 Sunset – Main AHU Fan Wall replacement • 4700 Sunset – HHW Boiler, Chiller replacement • Stage 2 Construction of new Hospital building – 113,000 sq. ft. • (8) MOB’s upgrade to Direct Digital Control (DDC)

EDUCATION

BS, Mechanical Engineering, Cal Poly Pomona, Pomona, CA

REGISTRATIONS Engineer in Training (EIT)

Richard Tran has over 15 years’ successful experience in the analysis and design for projects such as hospitals, medical offices, Clinics clean rooms, laboratories, Telcom, tenant improvement and central plants, both new and remodel. His experience includes engineering calculations and design, Title 24 compliance, energy modeling, building management system, construction supports, OSHPD and local city compliance.

*denotes work performed with previous firm.

Made with FlippingBook - professional solution for displaying marketing and sales documents online