Manufacturing and Advanced Tech

A D VA N C E D T E C H N O L O G Y

FAIRCHILD IMAGING

APPLIED MATER IALS

Milpitas, CA

Santa Clara, CA

Type: Clean Room Size: 3,000 SF

Type: Office, Clean Room, Manufacturing, Assembly, Testing, and General Purpose Size: Over 1,000,000 SF Projects: Buildings B1, B2, B3, B6, B7, B8, B9, B11, B12, B14, B15, B20, B81, B100 As a prime contractor, AlfaTech has provided extensive tool hook-up design including; process/chemical, electrical, and mechanical engineering services. AlfaTech completed a major campus consolidation project in Buildings B2, 6, 11, 12, 81, & 100, which required the relocation of more than half the people in SCLA to consolidate and vacate Central & B108. Additionally the project required a clean-up of the Central campus site and buildings for sale. Installation of 200 mm and 300 mm high temperature film (epitaxial) CVD reactors, as well as for ion implantation prototype systems. In addition, AlfaTech performed a feasibility study for a 300 mm RTP lab that included process utility systems, toxic gas abatement and scrubbed exhaust and power distribution to the tools.

AlfaTech provided engineering services for the partial conversion of the clean room areas into engineering labs.

QUALCOMM Santa Clara, CA

Type: R&D Size: 320,000 SF

This project scope included interior improvements from cold shell of four buildings totaling 320,000SF. Facilities included data center with in-row high- density cooling, cafeteria, fitness center, R&D labs and offices.

S ILICONIX Santa Clara, CA

RAYTHEON COMPANY Mountain View, CA

Type: Wafer Fab and Fab Renovation

Type: Class 10 - 100 Clean Rooms Size: Class 10 Clean Rooms, 26,000 SF; Class 100 Clean Rooms, 18,000 SF

The firm provided services on several projects at Siliconix. The wafer fab HVAC expansion resulted in a 383-ton chiller replacing one less than half its size. At Fab 2, AT renovated the masking area by adding coils, boilers, and accurate temperature and humidity controls supported by digital read-out and chart recording.

The firm provided mechanical, electrical, processes chemical, and fire protection design on an ongoing basis for a variety of projects that support Raytheon’s core businesses in defense and commercial electronics, business and special mission aircraft, engineering and construction.

The Class 10 clean room required tight temperature (+/- 0.5F) and humidity (+/- 3%) controls, and an isolated grounding plan for the computer room.