Ratcliff Architects -AlfaTech Big Book pps 19122

P U B L I C | C I V I C | T R A N S P O R T A T I O N

MORGAN HILL MATH INSTITUTE

San Jose, CA Type: Various Size: 4,800 SF The firm provided electrical and plumbing services for the remodel of approximately 4,800 SF of existing space in this county facility. The upgrades included new engineering systems for new modular units to accommodate the childcare center facilities. OAKLAND FEDERAL BUILDING/ GENERAL SERVICES ADMINISTRAT ION Oakland, CA Type: Administrative and Private Office, Conference, Auditorium, Court Rooms Size: 1,000,000 SF This 17-story complex in downtown Oakland comprises two towers separated by a central courtyard and connected by a six-story high glass atrium and linked by a skybridge at the thirteenth and fourteenth floors. The firm provided engineering design services for the program’s 10,000 SF data center, office space, courtrooms, auditorium, childcare center, cafeteria, and parking garage. The project received the President’s Award, the highest award issued by the US government for design and process excellence. SANTA CLARA COUNTY OFFICE OF EDUCATION / PARKWAY CHILD DEVELOPMENT CENTER

Morgan Hill, CA Type: Math Institute Size: 177,570 SF AlfaTech provided construction document designing for a new 177,570 SF Math Institute. The firm also provided mechanical, electrical, and plumbing engineering services for the new facility that included conference rooms, suites, specialty areas, and an auditorium. COUNTY OF SANTA CLARA GOVERNMENT CENTER , EAST WING – PHASES I & II San Jose, CA Type: Site Lighting and ADA Upgrade Size: Various The firm provided engineering design services for an ADA upgrade and surveyed the site for new walkway lighting to the adjacent Light Rail station.

COUNTY OF SANTA CLARA San Jose, CA Type: Various Size: Various

TRANSBAY DISTR ICT San Francisco, CA

AlfaTech provided service for various projects for the county of Santa Clara (not included in concurrent A/E services contract). These include electrical services for the power, fire alarm, security, PA and communication systems, emergency generator fuel tank replacement, and design of a new fire water storage tank.

Provided a planning-level feasibility study evaluating the use of Combined Heat and Power (CHP) in the Transbay District to provide power and more efficient heating and cooling of existing and planned buildings within the District.

Made with FlippingBook flipbook maker