Workplace (Norcal) Qualifications
Visa M1 & M2, Facility Assessment and Capital Investment Planning
900 Metro Center Blvd, Foster City, CA
TYPE:
Facility Assessment and Capital Investment Planning
empowered Visa's facility team to mitigate risks and reduce costs. It achieved this by proposing facility solutions that not only were more cost-effective to operate but also contributed to fostering an improved working environment, aligning with Visa's broader facility management goals and objectives. Leveraging a multi-faceted evaluation of the facility's condition and performance projections, the report presented a prioritized list of building improvements. These improvements were categorized based on their operational and maintenance necessity and energy-saving potential within 3-year, 5-year, and 7-year periods. Furthermore, the report outlined preliminary cost-saving estimates, potential utility incentives, and implementation cost projections.
AlfaTech delivered a comprehensive MEP assessment for Visa's Foster City Campus, Buildings M1 and M2 located at 900 Metro Center Blvd. This extensive evaluation encompassed the evaluation of existing systems, including heating, ventilation, air conditioning (HVAC), lighting, plumbing, and power (both normal and emergency power). The assessment was a crucial element of Visa's Facility Management's forward-looking strategy and long term capital planning. It aimed to effectively manage ongoing investments in capital improvements. AlfaTech was tasked with conducting a facility condition assessment that would facilitate swift and well-informed decision making in the realm of capital planning. The resulting report
Made with FlippingBook - Share PDF online